ML020650243
| ML020650243 | |
| Person / Time | |
|---|---|
| Site: | Crystal River (DPR-072) |
| Issue date: | 03/04/2002 |
| From: | Florida Power Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML020650243 (1) | |
Text
Crystal River Inspection / Activity Plan 03/01/2002 - 03/31/2003 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 03/04/2002 14:15:34 Report 22 2
OL-EP
- EMERGENCY EXERCISE Baseline Inspections 05/27/2002 05/30/2002 Exercise Evaluation IP 7111401 3
Baseline Inspections 05/27/2002 05/30/2002 Emergency Action Level and Emergency Plan Changes IP 7111404 3
Baseline Inspections 05/27/2002 05/30/2002 Performance Indicator Verification IP 71151 3
4 EB1-FP
- FP - PRE-INSPECTION VISIT Baseline Inspections 06/03/2002 06/07/2002 Fire Protection IP 7111105T 3
3 PB3-PI&R
- PI&R INSPECTION Baseline Inspections 06/03/2002 06/07/2002 Identification and Resolution of Problems IP 71152B 3
3 PB3-PI&R
- PI&R INSPECTION Baseline Inspections 06/17/2002 06/21/2002 Identification and Resolution of Problems IP 71152B 3
4 EB1-FP
- FP - INSPECTION Baseline Inspections 06/24/2002 06/28/2002 Fire Protection IP 7111105T 3
4 EB1-FP
- FP - INSPECTION Baseline Inspections 07/08/2002 07/12/2002 Fire Protection IP 7111105T 3
1 EB-2MR
- MAINTENANCE RULE Baseline Inspections 08/05/2002 08/09/2002 Maintenance Rule Implementation IP 7111112B 3
3 PS-RP
- RADIATION PROTECTION Baseline Inspections 08/05/2002 08/09/2002 Access Control to Radiologically Significant Areas IP 7112101 3
Baseline Inspections 08/05/2002 08/09/2002 Radiation Monitoring Instrumentation IP 7112103 3
Baseline Inspections 08/05/2002 08/09/2002 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems IP 7112201 3
Baseline Inspections 08/05/2002 08/09/2002 Radiological Environmental Monitoring Program IP 7112203 3
Baseline Inspections 08/05/2002 08/09/2002 Performance Indicator Verification IP 71151 3
1 PS-SEC
- SECURITY Baseline Inspections 08/19/2002 08/23/2002 Access Authorization Program (Behavior Observation Only)
Baseline Inspections 08/19/2002 08/23/2002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
Baseline Inspections 08/19/2002 08/23/2002 Performance Indicator Verification IP 71151 3
1 EB2-HS
- HEAT SINK Baseline Inspections 10/07/2002 10/11/2002 Heat Sink Performance IP 7111107B 3
1 PS-SEC
- SECURITY Baseline Inspections 01/27/2003 01/31/2003 Access Authorization Program (Behavior Observation Only)
Baseline Inspections 01/27/2003 01/31/2003 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization)
Baseline Inspections 01/27/2003 01/31/2003 Response to Contingency Events (Protective Strategy and Implementation of Protective Strategy)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.