Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20196H84928 June 1999Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999
ML20198G19123 December 1997Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants
ML20198J48021 December 1998Notification of 990107 Meeting with Util in Rockville,Md to Discuss License Amend Request to Allow Limited Inoperability of Boric Acid Storage Tank Level Channels & Transfer Logic Channels for Required Testing & MaintBoric Acid
ML20198R49527 October 1997Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv)
ML20199A82310 June 1986Forwards Draft NRR SALP Input for Util.Comments Requested by 860613Exemption Request
Control of Heavy Loads
ML20202F6011 December 1997Notification of 971211 Meeting W/Util in Rockville,Md to Discuss Intake Canal Seismic Issue at Plant
ML20203H27428 July 1986Forwards,For Review,Latest Update of SALP Ratings
ML20204J35226 March 1999Requests That Encl Document Be Entered in NRC Pdr.Documents Consists of Composite of Attachments to NSP Ltrs, & 990308 & Should Be Linked to Both Ltr
ML20206S92419 May 1999Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months
ML20207K89113 October 1988Advises That Encl Revised Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in As-Built Safety-Related Piping Acceptable from Anomaly Discovered to Next Refueling Outage
ML20207L34930 November 1983Advises That Scheme Described in Licensee 830929 Request for Extension of Date for Complying w/10CFR50.54 Unsatisfactory. Mods May Result in Shift Supervisor Spending Less Time in Control room.Davis-Besse Proposal Also Unacceptable
ML20209H62416 July 1999Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered Wk of 990517Boric Acid
High Radiation Area
Locked High Radiation Area
Job Performance Measure
Power change
Unidentified leakage
ML20209H79516 July 1999Forwards NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including as-given Written Exam) for Tests Administered During Week of 990517
ML20210F69827 July 1999Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts
ML20210F70230 April 1999Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A
ML20210K60813 August 1997Informs That Operator Licensing Exams Administered Wk of 970616 at Prairie Island,Units 1 & 2.Listed Info for Processing Through Nudocs & Distribution to NRC Staff, Including NRC PDR Also Encl
ML20211A46516 September 1997Requests for Waiver of Fee Billing for Replacement Pilot Insp.Nrr in Process of Developing headquarters-led Insp Procedure for Future Use at All NPP Licensee SitesSafe Shutdown
ML20211E17610 June 1986Forwards SALP Rept for Period 841201-860531.Summaries of Licensing Actions & NRR Ratings for Last Two Evaluation Periods EnclSystematic Assessment of Licensee Performance
Exemption Request
Control of Heavy Loads
ML20211G97030 August 1999Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies
ML20212B02317 December 1986Forwards, Emergency Diesel Generator Component Failures Due to Vibration, Engineering Evaluation Rept.Info Notice Informing Licensees of Potential Safety Concern of Fatigue Cracks in Fuel Oil & Cooling Lines Should Be Issued
ML20212F54623 September 1999Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement
ML20212H77018 June 1999Notification of 990715 Meeting with ABB-CE to Discuss Issues Re Steam Generator Welded Sleeve Problem Identified at Unit 1
ML20212K33118 August 1986Notification of 860821 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Shape Memory Alloy Sleeve Qualifications for Steam Generator Tube Sleeving That Westinghouse Plans to Commercialize by Late 1986
ML20214C68617 November 1986Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986
ML20217A98130 October 1999Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites
ML20217E97020 April 1998Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Mod to Plant Units 1 & 2,which Will Add Diverse RTS to Shut Down Reactor in Event of ATWS Event
ML20217K80814 August 1997Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Revised Methodology Used to Calculate MSLB Containment Pressure Response in Anticipation for License Amend Request to Reduce Boron ConcentrationBoric Acid
ML20217M03213 August 1997Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on Wk of 970616.Info Submitted for Processing Through Nudocs & Distribution to NRC Staff
ML20234B06516 July 1970Comments on Section III of ASME Boiler & Pressure Vessel Code Re Design Pressures for Steel Containment Vessels. Changes to Listed Plant Containment Design Pressure Parameters Should Be Made.Related Info Encl
ML20236D89427 July 1987Notification of 870814 Meeting W/Util,Westinghouse & Nutech in Bethesda,Md to Discuss Util Proposed Program for Spent Fuel Rod Consolidation for Spent Fuel Assemblies.Agenda Encl
ML20236N46714 October 1997Forwards TS Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests
ML20236N50018 October 1997Forwards Technical Specification Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests
ML20236P74513 November 1987Reviews Latest Performance Indicators to Determine Whether Indicators Can Be Used to Ascertain Quality Performance.Five of Six Plants Achieving Very Good Quality Performance While One Plant Achieving Good Quality PerformanceMissed surveillance
ML20236U20722 July 1998Forwards Corrected Copy of Ltr Transmitting Licensee Insp Repts 50-282/98-08 & 50-306/98-08.Date Has Been Corrected to Show Issuance on 980702
ML20236W8134 August 1998Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72Depleted uranium
ML20236X00112 September 1996Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility
ML20236X3484 December 1987Provides,Per Cj Paperiello Request,Cost & Value Estimates for Adding Third Diesel Generator to Plant.Comparison of Relative Value & Cost Show That Value of 1.5 Million About One Order of Magnitude Smaller than Estimated Cost
ML20236X98831 August 1987Discusses Ej Markey 870814 Request for Info Re Generic & plant-specific Backfits Done After 850920 & Rejected Due to Adverse Cost/Benefit Analysis.Pl Eng 861119 Memo Discussing Value Impact Assessment EnclBackfit
ML20236X99619 November 1986Provides,Per Cj Paperiello Request,Cost & Value Estimates for Adding Third Diesel Generator to Plant.Comparison of Relative Value & Cost Show That Value of 1.5 Million About One Order of Magnitude Smaller than Estimated CostBackfit
ML20237B26811 December 1987Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche
ML20237B61326 September 1977Forwards Unsigned & Undated Safety Evaluation & EIS & Notice of Issuance of Amend to OL & Negative Declaration,Per 10CFR50,App I.Radwaste Sys Capable of Maintaining Releases ALARAAnticipated operational occurrence
ML20237B96312 June 1985Notification of 850626 Meeting W/Util & Westinghouse in Bethesda,Md to Brief NRC on Upcoming Fuel Change from Exxon to Westinghouse,Commencing During 1986 Refueling Outage for Both Units.Agenda Encl
ML20237C74612 June 1985Notification of 850628 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Status of Util Upper Plenum Injection Evaluation Model (EM) Development & to Determine Level of Acceptability of EM Development Plan Submitted on 850311
ML20238C9004 September 1987Notification of 870915 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Proposed Installation of ATWS Mitigation Sys Actuation Circuitry & Feedwater Flow Control Sys Upgrade.W/O Stated Meeting Agenda
ML20239A6784 September 1987Notification of 870915 Meeting W/Util in Bethesda,Md Re ATWS Mitigation Sys Actuation Circuitry,Changing Location
ML20245H6454 August 1989Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR
ML20246E62023 August 1989Discusses Certification of Pnl Contractor Personnel as PWR Examiners.S Carrick Completed Required Written & Operating Exam Activities at Facilities During Wk of 890612.Oral Exam Audit Encl.W/O Encl
ML20247M13324 May 1989Forwards Input to SALP 8 Rept for Units 1 & 2.Evaluation Conducted Per 880606 Rev to NRC Manual Chapter 0516, Systematic Assessment of Licensee Performance & Provides Input Per Guidelines in Rl Hague 890412 MemoOffsite Dose Calculation Manual
Systematic Assessment of Licensee Performance
NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl29 June 1994Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl