Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196H849 | 28 June 1999 | Forwards June 1999 Performance Indicator (PI) Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Constitutes Second Monthly PI Data Submittal from Pilot Plant Licensees,Which Includes Data Through May 1999 | |
ML20198G191 | 23 December 1997 | Notification of 980107 Meeting W/Util in Rockville,Md to Discuss Plans for Conversion to Improved STS for Plants | |
ML20198J480 | 21 December 1998 | Notification of 990107 Meeting with Util in Rockville,Md to Discuss License Amend Request to Allow Limited Inoperability of Boric Acid Storage Tank Level Channels & Transfer Logic Channels for Required Testing & Maint | Boric Acid |
ML20198R495 | 27 October 1997 | Notifies of 971030 Meeting W/Util in Rockville,Md to Discuss Licensee Operability Determinations for Sys & Components w/limited-scope Weld Insps & Licensee Plans for Submitting Formal Relief Requests Per 10CFR50.55a(g)(5)(iv) | |
ML20199A823 | 10 June 1986 | Forwards Draft NRR SALP Input for Util.Comments Requested by 860613 | Exemption Request Control of Heavy Loads |
ML20202F601 | 1 December 1997 | Notification of 971211 Meeting W/Util in Rockville,Md to Discuss Intake Canal Seismic Issue at Plant | |
ML20203H274 | 28 July 1986 | Forwards,For Review,Latest Update of SALP Ratings | |
ML20204J352 | 26 March 1999 | Requests That Encl Document Be Entered in NRC Pdr.Documents Consists of Composite of Attachments to NSP Ltrs, & 990308 & Should Be Linked to Both Ltr | |
ML20206S924 | 19 May 1999 | Forwards Insp Plans Re Prairie Island & Quad Cities,Which Identified Insp Activities That Would Be Completed at Facilities Over Next 6 to 12 Months | |
ML20207K891 | 13 October 1988 | Advises That Encl Revised Criteria for Determining Justification for Continued Operation When Encountering Major Discrepancies in As-Built Safety-Related Piping Acceptable from Anomaly Discovered to Next Refueling Outage | |
ML20207L349 | 30 November 1983 | Advises That Scheme Described in Licensee 830929 Request for Extension of Date for Complying w/10CFR50.54 Unsatisfactory. Mods May Result in Shift Supervisor Spending Less Time in Control room.Davis-Besse Proposal Also Unacceptable | |
ML20209H624 | 16 July 1999 | Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam Submittal & as-given Operating Exam for Tests Administered Wk of 990517 | Boric Acid High Radiation Area Locked High Radiation Area Job Performance Measure Power change Unidentified leakage |
ML20209H795 | 16 July 1999 | Forwards NRC Operator Licensing Exam Repts 50-282/99-301(OL) & 50-306/99-301(OL) (Including as-given Written Exam) for Tests Administered During Week of 990517 | |
ML20210F698 | 27 July 1999 | Discusses 990430 Request for Waiver of 10CFR170 Fees for Certain Insp Efforts Re NRR Pilot Regulatory Oversight Program.Determined That Thirteen Plants in Pilot Program Will Be Exempted from 10CFR170 Fees for Insp Efforts | |
ML20210F702 | 30 April 1999 | Requests Waiver of Fees for Thirteen Dockets That Compromise Plant Population for NRR Pilot Regulatory Oversight Program. Purposes of Pilot Program Described in Commission Papers SECY-99-007 & SECY-99-007A | |
ML20210K608 | 13 August 1997 | Informs That Operator Licensing Exams Administered Wk of 970616 at Prairie Island,Units 1 & 2.Listed Info for Processing Through Nudocs & Distribution to NRC Staff, Including NRC PDR Also Encl | |
ML20211A465 | 16 September 1997 | Requests for Waiver of Fee Billing for Replacement Pilot Insp.Nrr in Process of Developing headquarters-led Insp Procedure for Future Use at All NPP Licensee Sites | Safe Shutdown |
ML20211E176 | 10 June 1986 | Forwards SALP Rept for Period 841201-860531.Summaries of Licensing Actions & NRR Ratings for Last Two Evaluation Periods Encl | Systematic Assessment of Licensee Performance Exemption Request Control of Heavy Loads |
ML20211G970 | 30 August 1999 | Notification of 990909 Meeting with Util in Rockville,Md to Discuss Licensing Issues That May Result from Ongoing Merger Activities Between NSP & New Century Energies | |
ML20212B023 | 17 December 1986 | Forwards, Emergency Diesel Generator Component Failures Due to Vibration, Engineering Evaluation Rept.Info Notice Informing Licensees of Potential Safety Concern of Fatigue Cracks in Fuel Oil & Cooling Lines Should Be Issued | |
ML20212F546 | 23 September 1999 | Notification of 991004 Meeting with Utils in Rockville,Md to Update Status of Nuclear Mgt Company & Provide Details of Member Licensees Impending License Transfer Applications & Operating Agreement | |
ML20212H770 | 18 June 1999 | Notification of 990715 Meeting with ABB-CE to Discuss Issues Re Steam Generator Welded Sleeve Problem Identified at Unit 1 | |
ML20212K331 | 18 August 1986 | Notification of 860821 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Shape Memory Alloy Sleeve Qualifications for Steam Generator Tube Sleeving That Westinghouse Plans to Commercialize by Late 1986 | |
ML20214C686 | 17 November 1986 | Forwards List of Missing SALP Evaluation Forms (0516B). Requests Review of Files to Locate Missing Forms.Recognizing That RP 0516B Issued in Mar 1986,request Applies Only to Repts Issued After Mar 1986 | |
ML20217A981 | 30 October 1999 | Forwards Sept 1999 Performance Indicator Data Rept for Revised Reactor Oversight Process Pilot Program.Rept Includes Data Through Aug 1999 (two-thirds of 3rd Quarter of 1999) for 13 Units at 9 Pilot Sites | |
ML20217E970 | 20 April 1998 | Notification of 980429 Meeting W/Util in Rockville,Md to Discuss Mod to Plant Units 1 & 2,which Will Add Diverse RTS to Shut Down Reactor in Event of ATWS Event | |
ML20217K808 | 14 August 1997 | Notification of 970826 Meeting W/Util in Rockville,Md to Discuss Revised Methodology Used to Calculate MSLB Containment Pressure Response in Anticipation for License Amend Request to Reduce Boron Concentration | Boric Acid |
ML20217M032 | 13 August 1997 | Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on Wk of 970616.Info Submitted for Processing Through Nudocs & Distribution to NRC Staff | |
ML20234B065 | 16 July 1970 | Comments on Section III of ASME Boiler & Pressure Vessel Code Re Design Pressures for Steel Containment Vessels. Changes to Listed Plant Containment Design Pressure Parameters Should Be Made.Related Info Encl | |
ML20236D894 | 27 July 1987 | Notification of 870814 Meeting W/Util,Westinghouse & Nutech in Bethesda,Md to Discuss Util Proposed Program for Spent Fuel Rod Consolidation for Spent Fuel Assemblies.Agenda Encl | |
ML20236N467 | 14 October 1997 | Forwards TS Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests | |
ML20236N500 | 18 October 1997 | Forwards Technical Specification Interpretation for Auxiliary Feedwater & Safety Injection Systems Operability for Prairie Island 1 & 2 in Response to 970912 & 15 Requests | |
ML20236P745 | 13 November 1987 | Reviews Latest Performance Indicators to Determine Whether Indicators Can Be Used to Ascertain Quality Performance.Five of Six Plants Achieving Very Good Quality Performance While One Plant Achieving Good Quality Performance | Missed surveillance |
ML20236U207 | 22 July 1998 | Forwards Corrected Copy of Ltr Transmitting Licensee Insp Repts 50-282/98-08 & 50-306/98-08.Date Has Been Corrected to Show Issuance on 980702 | |
ML20236W813 | 4 August 1998 | Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 | Depleted uranium |
ML20236X001 | 12 September 1996 | Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility | |
ML20236X348 | 4 December 1987 | Provides,Per Cj Paperiello Request,Cost & Value Estimates for Adding Third Diesel Generator to Plant.Comparison of Relative Value & Cost Show That Value of 1.5 Million About One Order of Magnitude Smaller than Estimated Cost | |
ML20236X988 | 31 August 1987 | Discusses Ej Markey 870814 Request for Info Re Generic & plant-specific Backfits Done After 850920 & Rejected Due to Adverse Cost/Benefit Analysis.Pl Eng 861119 Memo Discussing Value Impact Assessment Encl | Backfit |
ML20236X996 | 19 November 1986 | Provides,Per Cj Paperiello Request,Cost & Value Estimates for Adding Third Diesel Generator to Plant.Comparison of Relative Value & Cost Show That Value of 1.5 Million About One Order of Magnitude Smaller than Estimated Cost | Backfit |
ML20237B268 | 11 December 1987 | Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche | |
ML20237B613 | 26 September 1977 | Forwards Unsigned & Undated Safety Evaluation & EIS & Notice of Issuance of Amend to OL & Negative Declaration,Per 10CFR50,App I.Radwaste Sys Capable of Maintaining Releases ALARA | Anticipated operational occurrence |
ML20237B963 | 12 June 1985 | Notification of 850626 Meeting W/Util & Westinghouse in Bethesda,Md to Brief NRC on Upcoming Fuel Change from Exxon to Westinghouse,Commencing During 1986 Refueling Outage for Both Units.Agenda Encl | |
ML20237C746 | 12 June 1985 | Notification of 850628 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Status of Util Upper Plenum Injection Evaluation Model (EM) Development & to Determine Level of Acceptability of EM Development Plan Submitted on 850311 | |
ML20238C900 | 4 September 1987 | Notification of 870915 Meeting W/Util & Westinghouse in Bethesda,Md to Discuss Proposed Installation of ATWS Mitigation Sys Actuation Circuitry & Feedwater Flow Control Sys Upgrade.W/O Stated Meeting Agenda | |
ML20239A678 | 4 September 1987 | Notification of 870915 Meeting W/Util in Bethesda,Md Re ATWS Mitigation Sys Actuation Circuitry,Changing Location | |
ML20245H645 | 4 August 1989 | Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR | |
ML20246E620 | 23 August 1989 | Discusses Certification of Pnl Contractor Personnel as PWR Examiners.S Carrick Completed Required Written & Operating Exam Activities at Facilities During Wk of 890612.Oral Exam Audit Encl.W/O Encl | |
ML20247M133 | 24 May 1989 | Forwards Input to SALP 8 Rept for Units 1 & 2.Evaluation Conducted Per 880606 Rev to NRC Manual Chapter 0516, Systematic Assessment of Licensee Performance & Provides Input Per Guidelines in Rl Hague 890412 Memo | Offsite Dose Calculation Manual Systematic Assessment of Licensee Performance |
NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl | 29 June 1994 | Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl |