Provides,Per Cj Paperiello Request,Cost & Value Estimates for Adding Third Diesel Generator to Plant.Comparison of Relative Value & Cost Show That Value of 1.5 Million About One Order of Magnitude Smaller than Estimated Cost
ML20236X996
Person / Time
Site: Prairie Island, 05000000
Issue date: 11/19/1986
From: Eng P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20195F761 List:
References
FOIA-87-714, REF-GTECI-A-44, REF-GTECI-EL, RTR-NUREG-1032, RTR-NUREG-1109, RTR-NUREG-CR-4448, TASK-A-44, TASK-OR NUDOCS 8712110015
Download: ML20236X996 (4)


Text

~ - - - - - - - - - - - - - - - - - -

._..z..............

ENCLC RE TO EDO CONTROL 003120 9

NOV 19 BBE MEMORANDUM FOR: Carl J. Paperiello, Director, Division of Reactor safety FROM:-

Patricia L. Eng, Reactor Inspector, Operational Prt,grar.s SUEJECT: VALUE IMPACT ASSESSMENT FOR ADDING A THIM DIESEL GENERATOR AT PRAIRIE ISLAND NUCLEAR GENERATING STATION

1. Draft NUREG 1109, " Regulatory Analysis for the Resolution

Reference:

of Unresolved Safety Issue A-44, Station Blackout"

2. Draf t NUREG 1032, " Evaluation of Station Blackout Accidents at Nuclear Power Plants" Per your request, I have performed a rough estimate of the value to be gained by the addition of a third diesel generator at the Prairie Island Nuclear Generating Plant. In addition, data have been acquired regarding the estimated cast for addition of a third diest1 generator. Discussions with Messrs. P. ' W.

Baranovsky, A. M. Rubin, A. R. 'Marchese of NRR and Mr. D. Ericson of Sandia Laboratories indicated that detailed value assessment snd cost analyses are not available; however, the following may be used to arrive at ball park figures for both the value m the cost of the addition of a third diesel generator.

A. Cost of Ading a Third Diesel Generator Cost estimates perfomed by Sandia for diesel generator additions at Cooper and Quad Cities' stations have been performed Theseand willinbe1985 costs, published in NUREG CR 4448 in the near future. )

dollars are 14.31 and 11.3 rillion dollars, respectively. The estimates include the construction of a new, seismically qualified building to house the new diesel as well as labor, temporary construction, har.dware, and modification and engineering costs.

Generic costs in 1985 dollars based on the Energy Economic Data Base maintained by DOE for addition of a diesel generator to an existing ,

-operating plant are estimated to be approximately 16.3 sillion  !

dollars. l 4

8712110015 871204 PDR FOIA WEISSO7-714 PDR

~ - _ _ - _

I

..... I f

' #0V 16 966 2

Carl J. Paperiello l-B.

Valee cf Adding a Third Diesel Generator to Prairie Island l The value of adding a new diesel was calculated by comparing /t i i to relative cost of a station blackot:t with iha a givn d the relative ccst associated third diesel generator installed.

with at: sed The equation station for this blackout eve assessment is: l DxCxPxuxt=V j

l D = person rams per event where: C = cost per person rent P = event probability per reactor year n = number of reactors per site ,

t = years ree.aining until end of p13nt lifeV = is thl Assumptions made are: l Diesel reliability is assu:aed to be the industry average of l.

Prairie Island is assurned to be in the average of fsite power {

c1uster Station blackout duretion is assumed to be i hours l

Values used were: i 800,000 person rems per event l

$1000 per person rem J 2 reactors per site 30 years remaining in plant lifetime l Discussions with Mr. Baranovsky revealed that the l ddifferencel l

ith event probability per reactor year for the cu 0 5 and l an additional installed diesel generator varies be ,

1 3 x 10-5.

diesel between $480,000 and $1,440,0fsD.

l C. Sumary l Comparison of the relative value and i cost a t d diesel N proximately an order of magnitude smaller than the e ,

p nerator costs. l the probabilities specific to Prairie Island are curl developed.

i once it is received. l l

l

a

" l 3

Car) J. Paperte11e l I

v nt Any questions ngarding the calculational

~

. P. W. Baran , R (FTSprobabilliy th details, conditioris etcetera, should be directed to 492-4433), .

AW

)

Patricia L. Eng / l

, Reactor Inspector Operatidhal (

I l

Programs l

l I

R RI 1 s Hehl Eng/ bis

- . "f(_ _ NfA

a.U L H.n s .r s

-0; pc E - p : D.:- IF;-t tu i-t WII 10. On Ocu fyly 3 r .,

UNITED STATE 8 NUCLEAR REOULATORY COMMissl0N nasuiseoTom,p.c.seems

\.....)

I EDO PRINCIPAL .-CORRESPONDENCE

_- - - - - - -' - CONTROL DUE: 09/03/87 EDO CONTROL: 003120

, FROMt i

DOC DT 08/14/87 FINAL REPLYs REP. ED M D J. MARKEY l TO:

CHAIRMAN ZECH .

ww PRIORITY ** SECY Mt l FOR SIONATURE OFs ,

ROUTINO:

DESCt STELLO

) O'S RE BACKFIT RULE TAYLOR REM DATE: 06/20/87 MURRAY AS$10NED TO: AEOD(CRGR) CONTACT: JORDAN CONTACTS THOMPSON ASS 10NED TO: MMS $ '

CONTACTS MURLEY ASSIONED TO: NRR ASS 10NED TOs R1 CONTACTS RUSSELL j

AS$10tF.D 70: RI! CONTACT: ORACE AOSIDED TO: R111 CONTACTS DAVIS ASS 10ED To RIV CONTACT: RMARTIN AOS10tF.D To RV CONTACT: JMARTIN CONTACT: 5NEWBERRY ASSIGNED TO: EDO SPECI AL INSTRUCTIONS OR REMARKS:

1.

2.

OFFICES RESPOND IN FORMAT ATTACHED.

PARA. A - ALL ADDRESSES  %' 8. [wJJc // / ((

3. PARA. B - AEOD (CROR) ,
4. PARA. C - S. NEWBERRY (OEDO) [* g'O U f l

/ l INPUT TO SCOTT NEWBERRY DUE 9/3/07. Q '

NEOATIVE RESPONSES REQUIRED.

TAREM h . hed #AW3, I R . Avh R T. MrcHI, W l

~

.y 9

c%