ML20211A465

From kanterella
Jump to navigation Jump to search
Requests for Waiver of Fee Billing for Replacement Pilot Insp.Nrr in Process of Developing headquarters-led Insp Procedure for Future Use at All NPP Licensee Sites
ML20211A465
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 09/16/1997
From: Collins S
NRC (Affiliation Not Assigned)
To: Scroggins R
NRC OFFICE OF THE CONTROLLER
References
NUDOCS 9709240268
Download: ML20211A465 (4)


Text

d o .

$* *

  • 0Vq

'4

  • g- k UNITED STATES '

g j NUCLEAR REGULATORY COMMISSION

. wAssiwoTow, o.c. somewoot e gp(

  • e.** September 16, 1997 ,

MEMORANDUM TO: Ronald M. Scroggins, Controller i 0

OGficeoftheController FROM: trector Office of Nuclear Reactor Regulation

SUBJECT:

REQUEST FOR WAIVER OF FEE BILLING FOR REPLACEMENT PILOT INSPECTION This memorandum requests a waiver of fees for the Prairie Island Fire Protection Functional Inspection (FPFI) Program pilot inspection. This inspection is related to inspection development activity within NRR. This inspection replaces the previous Region III pilot FPFI, which was cancelled due to conflict with an emergent Clinton Diagnostic Evaluation Team (DET) inspection. The Clinton pilot inspection previously received a fee billing waiver.

NRR is in the process of developing a Headquarters-led inspection procedure for future use at all nuclear power plant licensee sites. The pilot inspections for the FPFI Program described in SECY-96-267 were concurred in by the Commission in a staff requirements memorandum dated February 7, 1997.

The scope of the FPfl inspections is to ensure that licensees are effectively implementing and managing their fire protection and post-fire safe shutdown programs. The activity requires four pilot inspections, one in each region, to validate the inspection procedure. NRR selected four reactors for pilot inspections over a 12 month period. Due to conflicts with an emergent DET, the Region III pilot inspection reactor plant has now been changed from Clinton to Prairie Island (the licensee for which is Northern States Power Company).

The primary purpose of the pilot inspections is to test the draft FPFI procedure and to identify the need for any revisions before the procedure is incorporated into the reactor inspection program. Therefore, in large part, NRR considers the pilot inspections to be generic rather than specific to the pilot plant licensees.

The pilot ins)ections will be dncumented by regular inspection reports.

Followup to tie pilot ins)ections, including lotential enforcement actions, will be plant specific, t1at is, fee recoveraale.

.p). t w W"ciWTEP A88M E8%

COPY Pa PDR 3,bllllIllllllkklll)lllll LJv077

_ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ . _ . . _ _ _ _ . _ . _ _ _ . _ _ . _ . . _ ~ . _ _ _ .

I September 16, 1997 .

Ronald F. Scroggins 2 NRR considers the four FPFI pilot inspections to be part of an inspection develo) ment activity that could affect nuclear power plant licensees other than tiose inspected. NRR proposes that the Prairie Island pilot FPFI not be fee billable. However, any Prairie Island followup action, including enforcement action, would be fee billable.

DISTRIBUTION:

Public DBDandois, Central Files OC/LFARB JLFunches, OC SPLB R/F g'g g g t JCHolloway, OC RBorchardt, NRR EPoteat, NRR RVillafranco, NRR RWestberg, Rlll BWetzel, NRR CJamerson, NRR JHannon, NRR EAdensam, NRR JRoe, NRR RZimmerman, NRR FGillespie, NRR DOCUMENT NAME: G:\SECTIONC\ WHITNEY \fPFIFEE2. PLT

  • See previous concurrence OFFICE SPLB:DSSA SPLB:DSSA BC:SPLB:DSSA D:DSSA (Af$}d:NRR NAME LWhitney* SWest* LBMarsh* GHoM'BSheh DATE 9/4 /97 9/4 /97 9/8 /97 r 69f 1//f/97 0/

OFFICE DdR )

1 nAME .

S h rni DATE 8 6/ @ /97 i

1 0FFICIAL RECORD COPY i ,

', September 16, 1997 .

Ronald F. Scroggins 2 NRR considers-the four FPFI pilot inspections to be part of an inspection develo) ment activity that could affect nuclear power plant licensees other than tiose inspected. NRR proposes that the Prairie Island pilot FPFI not be fee billable. However, any Prairie Island followup action, including enforcement action, would be fee billable.

DISTRIBUTION:

Public Central Files JLFunches, OC g'g g i g DBDandols, OC/LFARB SPLB R/F JCHolloway, OC RBorchardt, NRR EPoteat, NRR-RVillafranco, NRR RWestberg, RIII BWetzel, NRR CJamerson, NRR JHannon, NRR EAdensam, NRR JRoe, NRR RZimmerman, NRR FGillespie, NRR ,

DOCUMENT NAME: G:\ SECT 10NC\ WHITNEY \FPFIFEE2. PLT

  • See previous concurrence I

OfflCE SPLB:DSSA SPLB:DSSA BC:SPLB:DSSA D:DSSA (Md:NRR NAME LWhitney* SWest* LBMarsh* GHo M BSheh DATE 9/4 /97 9/4 /97 9/8 /97 ' h9f #f//f/97 _

gh l /

OFFICE DM ) 4 0 NAME _

SM DATE 8 M/@ /97 l OFFICIAL RECORD COPY

5 Ronald F. Scroggins 2 NRR onsiders the four FPfl pilot inspections t te part of an inspection

-develoamln activity that could affect nucle power plant licensees other than tiose in M eted. NRR proposes that e Prairie Island pliot FPfl not be ,

fee billable, ifawey <nd followup action, including enforcement action, ,or, 1dany be fee Prairie bi laIs)ble.

Q1STRIBUTION:

Public Cp ral N es JLFunches. OC DBDandois, C/LFARB SPLB R/F JCHolloway. OC RBorchardt, NRR Poteat, NRR RVillafranco, NR RWestberg, Rlll BlieQel, NRR CJamerson, NR JHannon, NRR EAden7sm,gR JRoe, NRR RZimmerman, NRR FGillespie, NAME: G:\ SECT 10NC\ WHITNEY \FPFIFEE2. PLT DOCU)M-

, /

OFFICE SPLB:DSSA SPLB:DSSA BC:SPLB:DS.SA D:DSSANN (A):ADT:NRR NAME dM- SWest M LBMarsh N . 'tHolahan BSheron DATE 1/'/f97 %/4-/97 9 / Q /97 / /97 / /97 DkR [ D:NRR fJMda SCollins  :

[ /97 \ / /97 0FFICIAL RECORD COPY

, ,w,.,,, -.,,-y-.,.,.e.- .,_,,,.,,,v,- - -

. . . , . , , , , , , ,- , , n.,, - e, .. - . . , , . , ,---, -