Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20097H705 | 5 September 1984 | Forwards Oil Spill Questionnaire VA-84-231 Addressing 840816 Spill | Time of Discovery |
ML20099A857 | 23 July 1992 | Advises That Settlement Offer,Described in , Acceptable to Util.Item 3 of Proposal Re Employee Environ Awareness Video Awarded to Echo Films,Inc.Site Barriers Constructed to Cover Entrances to Security Blockhouse | |
ML20100B906 | 24 January 1996 | Submits Annual Statement Verifying That Each Spillway Gate Operated at Least Once During Twelve Months Preceding Annual Insp by Ferc,Per 18CFR12.44(b)(2).Main Dam'S Five Spillway Gates Satisfactorily Tested as Specified on Attached Form | |
ML20101J051 | 21 March 1996 | Provides Notice of Intent to Increase Amount of Reverse Osmosis Reject Water Discharged at Outfall 020 | |
ML20101R252 | 10 April 1996 | Responds to Unacceptable Results Noted in Discharge Monitoring rept-QA Rept for North Anna Power Station (Permit VA0052451) & Yorktown Power Station (Permit VA0004103) | |
ML20101S618 | 9 July 1992 | Forwards NPDES Discharge Monitoring Rept for June 1992 for North Anna Power Station. High Ph Problems in Turbine Bldg Sumps May Be Due to Residual Effects of Earlier Hydrazine Spill | |
ML20105A973 | 9 September 1992 | Responds to Telcon & Re Method of Compliance W/ Dates for Training in Fire Extinguisher Use.Under Proposed Procedure,Util Will Need to Maintain Internal Record Available for Review by State of VA for Min of 12 Months | Fire Watch |
ML20106F999 | 15 October 1984 | Forwards Completed 841004 Questionnaire VA-273 Re 840927 Oil Spill | Time of Discovery High winds |
ML20116J264 | 9 November 1992 | Forwards Completed Oil Response Questionnaire for 921002 Oil Discharge.Discharge Was Contained within Treatment Facility & No Discharge to Waters Outside Facility Occurred | Time of Discovery |
ML20126C607 | 18 December 1992 | Forwards Water Temperature Data Collected for Third Quarter of 1992,July-Sept at North Anna Power Station in Compliance W/Vpdes Permit VA0052451 Under Special Condition 8.Plant Operation Data Through Sept Shown in Figure 3 | |
ML20128C863 | 19 June 1985 | Forwards Completed Questionnaire Re 850519 Oil Spill, Submitted on 850605 by T Voltaggio | Time of Discovery |
ML20137B470 | 6 January 1986 | Forwards Oil Spill Questionnaire WV-86-002 Describing 851002 Discharge of Approx 1 Gallon Lubricating Oil from Oil/Water Separator Into Discharge Canal Leading to Lake Anna.Catch Basin Cleaned | Time of Discovery |
ML20138B338 | 23 April 1997 | Provides Info to Support Proposal to Perform Annual Pressure Testing as Method of Leak Detection for Underground Line That Runs from Loading Area 5,000 Barrel Aboveground Storage Tank | Safe Shutdown Hydrostatic |
ML20141M339 | 5 August 1992 | Responds to Telcon W/W Butler (Air Pollution Control Inspector) Re Fire Watch Training Program & State of VA Dept of Air Pollution Control Open Burning Notification Requirements | Fire Watch |
ML20149M813 | 5 December 1996 | Submits Conditions Which Are Part of 961202 Approval of Temporary Conditional Use Permit Which Allows Construction of Temporary ISFSI or Dry Cask Storage as Listed | |
ML20151Q107 | 20 April 1988 | Comments on Comparison Review of 1986 Semiannual Effluent Release Repts,Per 880311 Request.Percent of Tech Spec Limit for Total Body Dose Rate for Fourth Quarter on Page 7 Changed from 7.63E3% to 7.63E-3% | |
ML20153D508 | 29 August 1988 | Confirms Telcon Rept of 880827 Oil Spill During Operator Attempt to Dewater Oil/Water Separator,Resulting in Discharge to Outfall 004.Operators to Exercise More Caution During Dewatering Until Chiller Operation Curtailed | |
ML20153G013 | 22 September 1998 | Requests Approval for Extended Compliance Schedule for Specific Provisions of Part III (9 VAC25-91-130,Pollution Prevention Requirements) for North Anna Nuclear Power Station | |
ML20195J139 | 11 June 1999 | Submits Addl Info as Addendum to Original Application Which Proposed Use of Three Chemicals in Bearing Cooling Tower at North Anna Power Station,Per Reissuance of Vpdes Permit | |
ML20196G221 | 21 June 1999 | Forwards Licensee Sampling & Testing Obligations Re Vpdes Permit VA0052451 Reissuance Application.Details of Requests for Sampling & Testing Waivers,Included | Grab sample |
ML20196H643 | 3 December 1998 | Informs That Util Is Seeking Approval to Discharge Chlorinated Blowdown from Bearing Cooling Tower for More than 2 H Per Unit as Specified in Special Condition 10 of Vpdes Permit.Meeting During Wk of 981214,requested | |
ML20198P287 | 29 October 1997 | Requests That Vpdes Permit Be Amended to Reflect That Three Small Package Sewage Treatment Plants Were Permanently Removed from Svc | |
ML20198P879 | 12 January 1998 | Submits Application for Exclusionary General Permit for Plant | |
ML20203H611 | 15 December 1997 | Forwards Application for General Storm Water Permit for Construction Activity at Naps.Local Government Ordinance Form,Pink Copy of Permit Application Fee Form & Copy of Check for Application,Encl | |
ML20206M792 | 7 May 1999 | Advises That Vepc Is Proposing to Use Three Chemicals in Bearing Cooling Tower at Naps,That Were Not Addressed in Licensee Last Application for Reissuance of Vpdes Permit | |
ML20207B411 | 14 July 1986 | Forwards Completed Questionnaire Re 860604 Oil Spill | Time of Discovery |
ML20210G972 | 22 July 1997 | Submits Proposal to Pressure Test Piping within 10 Days Prior to Normal Fuel Oil Unloading Into Ast,Beginning No Later than 980101 | |
ML20211B387 | 17 August 1999 | Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project | |
ML20214P007 | 25 November 1986 | Forwards Completed Oil Spill Questionnaire VA 87-011 of Spill on 861022.Spill Determined to Be Discharge of Polystyrene Resin,Not Oil | Time of Discovery |
ML20214R764 | 25 November 1986 | Confirms Recent Oil Spill.On 861118,oil Found in Upper End of Station Cooling Water Discharge Canal.Sorbent Matls Secured in Storm Drain.Related Info Encl | Time of Discovery |
ML20214U296 | 14 October 1977 | Requests Attention to Possibility That Util Failed to Disclose Existence of Hosgri Fault Near Diablo Canyon in San Luis Obispo,Ca to NRC for 2 Yrs.Investigation Similar to That Being Conducted Re North Anna Suggested | Safe Shutdown Safe Shutdown Earthquake Earthquake Backfit |
ML20217Q769 | 4 May 1998 | Forwards Revised Application for Exclusionary General Permit for NAPS as Requested by D Vaughan in |