ML08029022210 February 2004Amag at Braidwood from A. Stone (Riii) to G. Dick (Nrr), Et Al
ML08029037223 February 2004Review of Exelon'S Implementation of the Amag Ufms from G. Dick
ML08029062724 November 2004Closeout of TIA on Byron 1 Overpower from George Dick (NRR) to Rich Skokowski (Riii)
ML08029065511 January 2005Email from D. Passehl (Riii) to R. Skokowski (Riii); Subject: 01 Report 3-2003-034 Byron (Unsubstantiated)
ML08039054523 December 2004Closure Memo for Byron Overpower Issue
ML08198011330 June 2008Application Accepted - LAR Byron Steam Generator Iarc
ML08198024310 July 2008Application Accepted - Braidwood/Byron LAR to Revise EDG Start Time SRs
ML0822102848 January 2003Email from P. Rebstock to M. Chawla (Nrr), Subject: Byron Tp: Bases for Concern Regarding Byron Thermal Power Operating Point
ML08235024115 August 2008Application Accepted - Braidwood/Byron LAR to Administratively Clarify the OL & Tech Specs
ML08353058518 December 2008Application Accepted - Braidwood/Byron LAR to Adopt TSTF-490
ML0900703267 January 2009RFI for ISFSI
ML0900703357 January 2009Email from S. Bakhsh to Byron RFI for ISFSISafe Shutdown
Enforcement Discretion
Control of Heavy Loads
ML09106061315 April 2009Application Accepted - Braidwood/Byron LAR to Change Fire Prot Prog for Ucsr (ME0971-74)Fire Protection Program
ML0912805708 May 2009Application Accepted - Byron Unit No. 2 Relief Requests I3R-16 and 17 (ME1066-67)
ML09176065723 June 2009Response Email- Ltr. from Amararu Isukul (Information on Radioactive Waste for Selected Npps)
ML0918204691 July 2009Application Accepted - Braidwood/Byron LAR for SG Permanent Alternative Repair Criteria (ME1613-16)
ML09212035731 July 2009Application Accepted - Byron LAR for Ultimate Heat Sink (ME1669-70)Ultimate heat sink
ML0922300236 August 2009E-mail Braidwood & Byron Request for Additional Information Related to Steam Generator Permanent Alternate Repair Criteria (TAC Nos. ME1613 - ME1616)Finite Element Analysis
ML0924700433 September 20093 Acceptance Review Results Request to Use Specific Provisions from a Later Edition of the ASME Boiler and Pressure Vessel CodeIncorporated by reference
Liquid penetrant
ML09254046010 September 2009Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ
ML09272061820 September 2009LTR-09-0468 - E-mail. Thomas Saporito Regarding ERA Whistleblower Complaint Filed with OSHA Against Exelon Et Al
ML09273042622 September 2009Dtf Draft RAI Email
ML09299054623 October 2009Application Accepted - Byron LAR for One-Time Extension of ESW Train TS Completion Time
ML10021013520 January 2010Application Accepted - Braidwood/Byron LAR Re. Astrum Best Estimate LOCA Methodology (ME2941-44)
ML10060091426 February 2010E-mail Byron 1 & 2 - RAI for One -Time Extension of ESW Train Completion Time (ME2293-94)Probabilistic Risk Assessment
ML1006307923 March 2010E-mail Byron 1 & 2 - Request for Additional Information for One-Time Extension of ESW Train Completion Time (ME2293-94)
ML10074067015 March 2010Application Accepted - LAR Re. TSTF-425 Risk-informed Relocation of Surveil Freq Requirements (ME3368-69 for Byron; ME3370-71 for Braidwood)
ML10085049526 March 2010Application Accepted - Braidwood & Byron Relief Request Re. ASME Code Case N-729-1 (TACs ME3510 - ME3513)
ML10103087812 April 2010Application Accepted - LAR Re. TSTF-421 Extension of Inspection Interval for RCP Flywheels (ME3640-43)
ML10138052518 May 2010Additional RAI for Ultimate Heat Sink License Amendment Request (ME1669-70)Ultimate heat sink
ML10175012513 April 2010Email from E. Coffman to J. Benjamin and B. Dickson 2006 Exelon Tritium Map for Braidwood
ML10204020322 July 2010E-mail Draft on NEI 99-01 Rev 5
ML1030602892 November 2010Approved with Comment: Request to Extend the Submittal Date for the Byron UHS RAI Response
ML10350031716 December 2010Draft NRC RAI Byron Station, Units 1 and 2 - LAR Ultimate Heat SinkUltimate heat sink
ML1100605516 January 2011Acceptance of Braidwood and Byron LAR SG Tarc (TACs ME5198 - ME5201)
ML1101001676 January 2011G20110002 - Dave Lochbaum E-mail Re 2.206 Petition for Byron, Unit 2
ML1104000358 February 2011Recommendations of the the Byron 2.206 PRB
ML11084067125 March 2011Request for Additional Information Relief Request I3R-19
ML1110100449 April 2011Request for Additional Information, Relief Request I3R-19
ML11116A1859 April 2011NRR E-mail Capture - Byron Station, Unit No. 1 - Request for Additional Information Relief Request I3R-19 (TAC Nos. ME5877, ME5948, and ME5961)
ML11133A37512 May 2011Decline Invitation to Public Meeting
ML11137008717 May 2011E-mail Exelon Confirmation of Single Positive Test Form OriginalsFitness for Duty
ML11168041117 June 2011Acceptance Review for Exelon Threshold Determination Request (TAC ME6269 - ME6287)
ML11174A26022 June 2011NRR E-mail Capture - Braidwood / Byron Stations - Acceptance Review of Relief Requests I3R-09 and I3R20, Alternatives to the ASME Code Requirements for Repairs to Reactor Vessel Head Penetrations
ML11181A08317 June 2011NRR E-mail Capture - Exelon Draft Decommissioning Trust Fund RAIs
ML11182B05428 June 2011NRR E-mail Capture - Request for Additional Information Regarding Cyber Security Plan License ConditionCyber Security
ML11224A0833 August 2011NRR E-mail Capture - Draft - Supplemental Information Request Braidwood and Byron Mur LAR (ME6587-ME6590)
ML11266A00219 September 2011NRR E-mail Capture - Draft RAI Braidwood/Byron - Measurement Uncertainty Recapture LARAging Management
Fire Protection Program
ML11286A02426 September 2011NRR E-mail Capture - Byron Unit 2 SG Inspection Results
ML11286A02628 September 2011NRR E-mail Capture - Byron B2R16 Tubesheet Maps