Application Accepted - Braidwood/Byron LAR to Revise EDG Start Time SRs
ML081980243
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/10/2008
From: David M
NRC/NRR/ADRO/DORL/LPLIII-2
To: Simpson P
Exelon Corp
marshall david 415-1547
References
TAC MD9021, TAC MD9022, TAC MD9023, TAC MD9024
Download: ML081980243 (2)


Text

From: Marshall David Sent: Thursday, July 10, 2008 3:08 PM To: patrick.simpson@exeloncorp.com Cc: Tricia.Mattson@exeloncorp.com; david.chrzanowski@exeloncorp.com; ken.nicely@exeloncorp.com; Matthew McConnell; George Wilson; Russell Gibbs

Subject:

Application Accepted - Braidwood/Byron LAR to Revise EDG Start Time Surveillance Requirements

Pat, By letter dated June 26, 2008, Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos.1 and 2 (ADAMS Accession Number ML081780567). The requested amendment proposes changes to Technical Specification (TS) Surveillance Requirements (SRs) 3.8.1.7, 3.8.1.12, 3.8.1.15, and 3.8.1.20, to clarify the requirements for the start time test performed by these SRs.

The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TS) must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me.

Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF03410681C208F7E)

Subject:

Application Accepted - Braidwood/Byron LAR to Revise EDG Start Time Surveillance Requirements Sent Date: 7/10/2008 3:07:36 PM Received Date: 7/10/2008 3:07:36 PM From: Marshall David Created By: Marshall.David@nrc.gov Recipients:

patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com)

Tracking Status: None Tricia.Mattson@exeloncorp.com (Tricia.Mattson@exeloncorp.com)

Tracking Status: None david.chrzanowski@exeloncorp.com (david.chrzanowski@exeloncorp.com)

Tracking Status: None ken.nicely@exeloncorp.com (ken.nicely@exeloncorp.com)

Tracking Status: None Matthew.McConnell@nrc.gov (Matthew McConnell)

Tracking Status: None George.Wilson@nrc.gov (George Wilson)

Tracking Status: None Russell.Gibbs@nrc.gov (Russell Gibbs)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 17030 7/10/2008 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False

Return Notification: False Sensitivity: olNormal Recipients received: