Application Accepted - Braidwood/Byron LAR for SG Permanent Alternative Repair Criteria (ME1613-16)
ML091820469
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/01/2009
From: David M
Plant Licensing Branch III
To: Simpson P
Exelon Generation Co
marshall david 415-1547
References
TAC ME1613, TAC ME1614, TAC ME1615, TAC ME1616
Download: ML091820469 (1)


Text

From:

David, Marshall Sent:

Wednesday, July 01, 2009 12:54 PM To:

patrick.simpson@exeloncorp.com Cc:

Johnson, Andrew; Campbell, Stephen; Gavrilas, Mirela; Lisa.Schofield@exeloncorp.com

Subject:

Application Accepted - Braidwood/Byron LAR for SG Permanent Alternative Repair Criteria (ME1613-16)

Pat, By letter dated June 24, 2009, Exelon Generation Company, LLC (the licensee) submitted a license amendment request for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos.1 and 2 (ADAMS Accession No. ML091770543). The license amendment request proposes to permanently revise Technical Specifications (TS) 5.5.9, "Steam Generator (SG) Program," to exclude portions of the tube below the top of the steam generator tubesheet from periodic steam generator tube inspections and plugging or repair. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and has concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.

Sincerely, Marshall David Senior Project Manager (301) 415-1547 E-mail Properties

Mail Envelope Properties (01BD2A1885C88F45A12CB413DEF03410ABA1134AFA)

Subject:

Application Accepted - Braidwood/Byron LAR for SG Permanent Alternative Repair Criteria (ME1613-16)

Sent Date: 7/1/2009 12:54:04 PM Received Date: 7/1/2009 12:54:04 PM From: David, Marshall Created By: Marshall.David@nrc.gov Recipients:

patrick.simpson@exeloncorp.com (patrick.simpson@exeloncorp.com)

Tracking Status: None Andrew.Johnson@nrc.gov (Johnson, Andrew)

Tracking Status: None Stephen.Campbell@nrc.gov (Campbell, Stephen)

Tracking Status: None Mirela.Gavrilas@nrc.gov (Gavrilas, Mirela)

Tracking Status: None Lisa.Schofield@exeloncorp.com (Lisa.Schofield@exeloncorp.com)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 17626 7/1/2009 Options Expiration Date: