Semantic search

Jump to navigation Jump to search
 Issue dateSiteTitle
ML03056010825 February 2003OconeeConference Call Summary - Oconee 2 SG Inspection
ML03056059224 October 2002OconeeEnclosures to Conference Call Summary - Oconee 2 SG Inspection
ML03056084727 February 2003OconeeAssignment of New Project Director for Pdii for a Period of 4 Months
ML03057052526 February 2003OconeeReactor and Senior Reactor Operator Initial Examinations Oconee Nuclear Station 50-269/03-301, 50-270/03-301 and 50-287/03-301
ML0306503794 March 2003OconeeInspection Plan for 03/01/2003 - 03/31/2004
ML03070042814 March 2003Beaver Valley
Millstone
Calvert Cliffs
Davis Besse
Salem
Oconee
Mcguire
Palisades
Palo Verde
Indian Point
Kewaunee
Catawba
Harris
Wolf Creek
Saint Lucie
Point Beach
Watts Bar
Sequoyah
Byron
Arkansas Nuclear
Three Mile Island
Braidwood
Summer
Prairie Island
Seabrook
Surry
North Anna
Crystal River
Ginna
Diablo Canyon
Callaway
Vogtle
Waterford
Farley
Robinson
South Texas
San Onofre
Cook
Comanche Peak
Fort Calhoun
McGuire
Errata to Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
ML03070060610 March 2003OconeePublic Meeting Announcement, Annual Assessment, Oconee Nuclear Station
ML03121035830 April 2003OconeeLicense Amendments 330, 330 & 331, Revising Technical Specification 3.76 to Require a Minimum Combined Inventory of 155,000 Gallons and Remove the Condensate Storage Tank as a Source of Combined Inventory
ML03139053319 May 2003OconeeLicense Amendments 331, 331 and 332 Revising TS Surveillance Requirement 3.10.1.9 to Increase the Loading Requirements for the Standby Shutdown Facility Diesel Generator
ML03169027318 June 2003OconeeLicense Amendments 332, 332 & 333, Revising Technical Specification 3.5.3, Low-Pressure Injection, Condition a, to Change Completion Time from 72 Hours to 7 Days
ML03169056517 June 2003OconeeSafety Evaluation of Relief Requests for the Fourth 10-year Pump and Valve Interval Inservice Testing Program Plan
ML03181065730 June 2003OconeeSummary of Conference with DEC Regarding the Spring 2003 Steam Generator Inspections
ML03195020314 July 2003OconeeRelief Request for Snubber Visual Examination Functional Testing
ML03199033717 July 2003OconeeReview of End of Cycle 19 Steam Generator Inspection Report
ML03202025911 August 2003OconeeJune 2003 Exam 50-269/2003-301 Final Ro/Sro Written Exam & References
ML03210078028 July 2003OconeeIR 05000269-03-003, IR 05000270-03-003, IR 05000287-03-003, on 04/06 - 06/28/2003, Duke Energy Corp; Oconee Nuclear Station; Maintenance Effectiveness, Personnel Performance During Non-routine Plant Evolutions, and Other Activities
ML0321903267 August 2003OconeeAttachments 1-6 to 08/07/03 Ltr Victor M. Mccree to R. A. Jones - Special Study, PWR Pressurizer Safety Valves and Main Steam Safety Valves and BWR Safety/Relief Valves Performance
ML03223049411 August 2003OconeeReactor and Senior Reactor Operator Initial Examination 05000269/2003301, 05000270/2003301 and 05000287/2003301
ML03224052012 August 2003OconeeRelief Request Associated with Pump Generic Relief Request Number ON-GRP-01
ML03234036920 August 2003OconeeReactor and Senior Reactor Operator Initial Examinations Oconee Nuclear Station - 05000269/2003302, 05000270/2003/302 and 05000287/2003/302, Retake Exam Scheduled for 10/17/03
ML03238046825 August 2003OconeeIssuance of Amendment Nos. 333, 333 and 334, Respectively, Revising Frequencies Associated with Surveillance Requirements 3.4.12.5 & 3.4.12.7 Concerning Low Temperature Overpressure Protection System
ML03240002427 August 2003OconeeMid-Cycle Performance Review & Inspection Plan - Oconee Nuclear Station
ML03240051825 August 2003OconeeTechnical Specification, Revising the Frequencies Associated with Surveillance Requirements 3.4.12.5 & 3.4.12.7 Concerning Low Temperature Overpressure Protection System
ML03247147511 August 2003OconeeJune Exam 50-269/2003-301 Draft Simulator Scenarios & Outlines
ML03247148311 August 2003OconeeJune Exam 50-269/2003-301 Draft Ro/Sro Written Exam & Outline
ML03248079111 August 2003OconeeJune 50-269/2003-301 Final Post-Exam Comments - None
ML03248079611 August 2003OconeeJune 50-269/2003-301 Administrative Documents
ML03248079811 August 2003OconeeJune 50-269/2003-301 Final Outlines
ML03248080011 August 2003OconeeJune 50-269/2003-301 Finalsimulator Scenarios & Outlines
ML0325206014 September 2003OconeeIssuance of Amendments, SG Tube Surveillance Program
ML0325406884 September 2003OconeeTechnical Specifications, SG Tube Surveillance Program
ML03260012317 September 2003OconeeLetter - Addition of Topical Report BAW-10164P-1, Revision 1 to the Core Operating Limits Report
ML03267081624 September 2003OconeeSafety Evaluation of Revisions to Topical Reports DPC-NE-3000, -3003 and -3005
ML03272140429 September 2003OconeeRelief Requests 02-005 and 02-004
ML03272159029 September 2003OconeeIssuance of Amendment Nos. 335, 335 and 336, Respectively, Revising the TS and the Licensing Basis in the Updated Final Safety Analysis Report
ML03273147529 September 2003OconeeTechnical Specifications Pages for Amendment Nos. 335, 335 and 336, Respectively
ML0327400021 October 2003OconeeRegarding Final Accident Sequence Precursor Analysis of April 2001 Operational Event
ML0327400031 October 2003OconeeRegarding Final Accident Sequence Precursor Analysis of April 2000 Operational Event
ML0330900105 November 2003OconeeIssuance of Amendment Nos. 336, 336 and 337, Respectively, Removing Requirements That Are No Longer Applicable Because the Implementation of the Automatic Feedwater Isolation System Modifications Has Been Completed
ML0331100865 November 2003OconeeTechnical Specification for Amendment Nos. 336, 336 and 337, Respectively, Oconee Nuclear Station, Units 1, 2 and 3
ML03322003414 November 2003OconeeNRC Examination Initial Retake Examination Report 05000269/2003302, 05000270/2003302 and 05000287/2003302
ML03346020712 December 2003OconeeReview of End of Cycle 20 Steam Generator Inspection Report
ML0400700035 January 2004OconeeReactor and Senior Reactor Operator Initial Examinations Oconee Nuclear Station - 50-269/2004-301, 50-270/2004-301 and 50-287/2004-301
ML04015001614 January 2004Oconee1/14/04, Oconee, Units 1, 2 & 3, Revised Methodology for Analyzing the Effects of Pipe Breaks Outside Containment at Oconee Nuclear Station (Tac Nos. MB3205, MB3206 and MB3207)
ML04015070812 January 2004OconeeFEMA Region IV Final Exercise Report for September 17, 2002 Full Participation Plume Exposure Pathway Exercise - Oconee Nuclear Station
ML04020072415 January 2004OconeeIssuance of License Amendments 337, 337, & 338, Reactor Protective System RPS Instrumentation
ML04030006729 January 2004OconeeIR 05000269-04-007, 05000270-04-007, and 05000287-04-007, on 01/21/04, Oconee, Units 1, 2, and 3, Review of Unresolved Item 05000269,270,287/2003003-002
ML0403600024 February 2004OconeeLtr., Correction of Amendment Nos. 336, 336, and 337
ML0403705405 February 2004OconeeLicense Amendment No. 338, Revised the Licensing Basis in the UFSAR to Support Installation of a Passive Low-Pressure Injection Cross Connect Inside Containment
ML04044040113 February 2004OconeeLtr, Final Accident Sequence Precursor of February 1999 Operational Condition