Inspection Plan for 03/01/2003 - 03/31/2004
ML030650379
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/04/2003
From: Reyes L
NRC/RGN-II
To: Rosalyn Jones
Duke Energy Corp
Shared Package
ML030650331 List:
References
IR-03-001
Download: ML030650379 (2)


Text

Oconee Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2003 13:19:33 Report 22 3

OL RQ

- REQUAL INSPECTION Baseline Inspections 03/24/2003 03/28/2003 Licensed Operator Requalification IP 7111111B 1, 2, 3 1

95001

- 95001 INSPECTION UNIT 3 HPI CABLE Supplemental Progra 04/07/2003 04/11/2003 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area IP 95001 3

1 PS-RP

- RAD PROTECTION-HEAD REPLACEMT Other Routine 04/28/2003 05/02/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2, 3 Baseline Inspections 04/28/2003 05/02/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 04/28/2003 05/02/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 1

EB2-ISI

- INSERVICE INSPECTION-U3 Baseline Inspections 05/05/2003 05/08/2003 Inservice Inspection Activities - PWR IP 7111108P 3

Event Response Insp 05/05/2003 05/08/2003 Special Inspection IP 93812 3

1 EB2-HR

- RPV HEAD REPLACEMENT-U3 Other Routine 05/15/2003 05/22/2003 Reactor Vessel Head Replacement Inspection IP 71007 3

1 S/G-ISI

- S/G INSERVICE INSPECTION-U3 Baseline Inspections 05/19/2003 05/21/2003 Inservice Inspection Activities - PWR IP 7111108P 3

3 OL PREP

- INITIAL EXAM PREP Not Applicable 06/02/2003 06/06/2003 OCONEE/EXAMS AT POWER FACILITIES V23187 1

3 PI&R

- PI&R WEEK 1 Baseline Inspections 06/09/2003 06/13/2003 Identification and Resolution of Problems IP 71152B 1, 2, 3 4

EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 06/16/2003 06/20/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2, 3 Baseline Inspections 06/16/2003 06/20/2003 Permanent Plant Modifications IP 7111117B 1, 2, 3 3

OL EXAM

- INITIAL EXAM Not Applicable 06/16/2003 06/27/2003 OCONEE/EXAMS AT POWER FACILITIES V23207 1

3 PI&R

- PI&R WEEK 2 Baseline Inspections 06/23/2003 06/27/2003 Identification and Resolution of Problems IP 71152B 1, 2, 3 1

EB2-MR

- MAINTENANCE RULE Baseline Inspections 07/07/2003 07/11/2003 Maintenance Effectiveness IP 7111112B 1, 2, 3 3

PS-SEC

- SECURITY - TI/ICM Safety Issues 07/28/2003 08/01/2003 Inspection of Nuclear Reactor Safeguards - Interim Compensatory Measures IP 2515/148 1, 2, 3 1

PS-RP

- RAD PROTECTION - ONSITE PREP AND ISFSI Baseline Inspections 08/25/2003 08/29/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 1

EB2-ISI

- INSERVICE INSPECTION-U1 Baseline Inspections 09/15/2003 09/19/2003 Inservice Inspection Activities - PWR IP 7111108P 1

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Oconee Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2003 13:19:33 Report 22 1

OL EP

- EP INSPECTION Baseline Inspections 09/15/2003 09/19/2003 Alert and Notification System Testing IP 7111402 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Emergency Response Organization Augmentation Testing IP 7111403 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Correction of Emergency Preparedness Weaknesses and Deficiencies IP 7111405 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Performance Indicator Verification IP 71151 1, 2 3

PS-RP

- RP, HEAD REPLACMT & STEAM GEN REPLMNT Other Routine 09/15/2003 09/19/2003 Steam Generator Replacement Inspection IP 50001 1

Other Routine 09/15/2003 09/19/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 09/15/2003 09/19/2003 Performance Indicator Verification IP 71151 1, 2 1

EB2-SGRP

- SGRP-U1 Other Routine 09/22/2003 11/17/2003 Steam Generator Replacement Inspection IP 50001 1

1 CONT REP

- CONTAINMENT REPAIR Other Routine 11/03/2003 11/06/2003 Steam Generator Replacement Inspection IP 50001 1

1 EB2-HR

- RPV HEAD REPLACEMENT-U1 Other Routine 11/03/2003 11/07/2003 Reactor Vessel Head Replacement Inspection IP 71007 1

2 PS-RP

- RADIATION PROTECTION Other Routine 11/03/2003 11/07/2003 Steam Generator Replacement Inspection IP 50001 1

Other Routine 11/03/2003 11/07/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 11/03/2003 11/07/2003 Performance Indicator Verification IP 71151 1, 2 2

OL EP

- EP EXERCISE Baseline Inspections 01/12/2004 01/16/2004 Exercise Evaluation IP 7111401 1, 2, 3 Baseline Inspections 01/12/2004 01/16/2004 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 01/12/2004 01/16/2004 Performance Indicator Verification IP 71151 1, 2, 3 1

EB2-ISI

- INSERVICE INSPECTION Baseline Inspections 03/22/2004 03/26/2004 Inservice Inspection Activities - PWR IP 7111108P 2

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.