ML033220034

From kanterella
Jump to navigation Jump to search
NRC Examination Initial Retake Examination Report 05000269/2003302, 05000270/2003302 and 05000287/2003302
ML033220034
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/14/2003
From: Ernstes M
Operator Licensing and Human Performance Branch
To: Rosalyn Jones
Duke Energy Corp
References
50-269/03-302, 50-270/03-302, 50-287/03-302
Download: ML033220034 (9)


See also: IR 05000269/2003302

Text

November 14, 2003

Duke Energy Corporation

ATTN: Mr. Ronald A. Jones

Vice President

Oconee Site

7800 Rochester Highway

Seneca, SC 29672

SUBJECT:

OCONEE NUCLEAR PLANT - NRC EXAMINATION INITIAL RETAKE

EXAMINATION REPORT 05000269/2003302, 05000270/2003302 AND

05000287/2003302

Dear Mr. Jones:

On October 17, 2003, the Nuclear Regulatory Commission (NRC) administered a simulator

portion of the examination to two employees of your company who had applied for licenses to

operate the Oconee Nuclear Plant (one Reactor Operator (RO) and one Senior Reactor

Operator (SRO)). The NRC waived the written and the walkthrough portions of the examination

for both applicants based on satisfactory performance on a previous NRC examination. At the

conclusion of the examination, the examiners discussed the examination and preliminary

findings with those members of your staff identified in the enclosed report. Both applicants

passed the simulator examination. There were no post examination comments.

No findings of significance were identified.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 562-4638.

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

Enclosure: (See page 2)

DEC

2

Enclosure:

Report Details

cc w/encl:

L. E. Nicholson

Compliance Manager (ONS)

Duke Energy Corporation

Electronic Mail Distribution

Lisa Vaughn

Legal Department (PB05E)

Duke Energy Corporation

422 South Church Street

P. O. Box 1244

Charlotte, NC 28201-1244

Anne Cottingham

Winston & Strawn LLP

Electronic Mail Distribution

Beverly Hall, Acting Director

Division of Radiation Protection

N. C. Department of Environmental

Health & Natural Resources

Electronic Mail Distribution

Henry J. Porter, Director

Div. of Radioactive Waste Mgmt.

S. C. Department of Health and

Environmental Control

Electronic Mail Distribution

R. Mike Gandy

Division of Radioactive Waste Mgmt.

S. C. Department of Health and

Environmental Control

Electronic Mail Distribution

County Supervisor of

Oconee County

415 S. Pine Street

Walhalla, SC 29691-2145

Lyle Graber, LIS

NUS Corporation

Electronic Mail Distribution

M. T. Cash, Manager

Regulatory Issues & Affairs

Duke Energy Corporation

526 S. Church Street

Charlotte, NC 28201-0006

Peggy Force

Assistant Attorney General

N. C. Department of Justice

Electronic Mail Distribution

Mr. Bentley K. Jones

Training Manager

Oconee Nuclear Station

7800 Rochester Highway

Seneca, SC 29672-0752

DEC

Distribution w/encl:

L. Olshan, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

KODonohue:pmd MErnstes

RHaag

DATE

11/13/2003

11/13/2003

11/13/2003

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML033220034.wpd

Enclosure

NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos.:

50-269, 50-270, 50-287

License Nos.:

DPR-38, DPR-47, DPR-55

Report Nos.:

05000269/2003302, 05000270/2003302 and

05000287/2003302

Licensee:

Duke Energy Corporation

Facility:

Oconee Nuclear Station

Location:

7800 Rochester Highway

Seneca, SC 29672

Date:

Operating Tests - October 17, 2003

Examiners:

Kathleen ODonohue, Senior Reactor Inspector

Richard Baldwin, Senior Operations Engineer

Approved by:

Michael E. Ernstes, Chief

Operator Licensing and Human Performance Branch

Division of Reactor Safety

SUMMARY OF FINDINGS

ER 05000269/2003302, ER 05000270/2003302, ER 05000287/2003302; 10/17/03; Oconee

Nuclear Station; Licensed Operator Examinations.

NRC examiners conducted an Initial License Retake examination in accordance with the

guidance of NUREG-1021, Draft Revision, Operator Licensing Examination Standards for

Power Reactors. This examination implemented the operator licensing requirements identified

in 10 CFR §55.45.

The NRC administered the Simulator portion of the examination to one Reactor Operator (RO)

and one Senior Reactor Operator (SRO). The scenarios were developed by the licensee. The

NRC waived the written and the walkthrough portions of the examination for both applicants.

Both applicants passed and were issued a license.

No significant issues were identified.

Report Details

4.

OTHER ACTIVITIES (OA)

4OA5 Operator Licensing Initial Examinations

a.

Inspection Scope

The examiners reviewed the simulator scenarios developed by the licensee for

compliance with the guidelines specified in NUREG 1021, Operator Licensing

Examination Standards for Power Reactors, Draft Revision 9. The examination

changes agreed upon between the NRC and the licensee were made according to

NUREG-1021 and incorporated into the final version of the examination materials.

The examiners reviewed the licensees examination security measures while preparing

and administering the examinations to ensure examination security and integrity

complied with 10 CFR 55.49, Integrity of examinations and tests.

The examiners evaluated one Reactor Operator (RO) applicant and one Senior Reactor

Operator (SRO) applicant who were being assessed under the guidelines specified in

NUREG-1021. The examiners administered the operating tests on October 17, 2003.

The evaluations of the applicants and review of documentation were performed to

determine if the applicants met requirements specified in 10 CFR Part 55.

b.

Findings

No findings of significance were identified.

While performing scenario validation on the examination material, the licensee

inadvertently left exam material inadequately secured. The simulator operation

instructions for one of the exam scenarios was left unattended in the simulator over a

period of days. The instructions contained sufficient information on the scenario to

compromise several of the scenario component failures. The licensee regained control

of the material and notified the NRC. The NRC reviewed the details of this incident and

determined that it was a potential compromise to the exam. The compromised

information was deleted from the scenario, it was replaced with new component failures

and the revised scenario was validated. The issue was documented in the licensees

problem identification process as PIP #O-03-06125.

The licensees examination submittal was within the range of acceptability expected for

a proposed examination. One RO and one SRO passed the operating examinations.

There were no post examination comments.

2

4OA6 Meetings

Exit Meeting Summary

On October 17, 2003, the examination team discussed generic issues with Mr. Regis

Repko and members of his staff. The inspectors asked the licensee whether any

materials examined during the inspection should be considered proprietary. No

proprietary information was identified.

PARTIAL LIST OF PERSONS CONTACTED

Licensee personnel

R. Repko, Operations Superintendent

N. Clarkson, Senior Engineer

J. Steely, Initial Training Supervisor

N. Constance, Operations Training Manager

M. Hill, Operations Shift Manager

G. Washburn, nuclear instructor

R. Robinson, Nuclear Shift Supervisor

P. Gillespie, Shift Operations Manager