June 30, 2003 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
SUMMARY
OF CONFERENCE CALL WITH DUKE ENERGY CORPORATION REGARDING THE SPRING 2003 STEAM GENERATOR INSPECTIONS AT OCONEE UNIT 3 (TAC NO. MB8978)
Dear Mr. Jones:
On May 18, 2003, your staff and our staff participated in a conference call to discuss the results of recently completed inspections of the Oconee, Unit 3 steam generator tubes during the Spring 2003 outage. Enclosure 1 is a brief summary of the call, and Enclosure 2 contains three telefaxes related to the call.
Sincerely,
/RA/
Leonard N. Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-287
Enclosures:
- 1. Summary of Conference With Duke Energy Corporation Regarding Spring 2003 Steam Generator Inspection Results at Oconee Nuclear Station, Unit 3
- 2. Telefaxes from Robert C. Douglas to Leonard N. Olshan dated May 19, May 20, and May 22, 2003 cc w/encls: See next page
June 30, 2003 Mr. Ronald A. Jones Vice President, Oconee Site Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672
SUBJECT:
SUMMARY
OF CONFERENCE CALL WITH DUKE ENERGY CORPORATION REGARDING THE SPRING 2003 STEAM GENERATOR INSPECTIONS AT OCONEE UNIT 3 (TAC NO. MB8978)
Dear Mr. Jones:
On May 18, 2003, your staff and our staff participated in a conference call to discuss the results of recently completed inspections of the Oconee, Unit 3 steam generator tubes during the Spring 2003 outage. Enclosure 1 is a brief summary of the call, and Enclosure 2 contains three telefaxes related to the call.
Sincerely,
/RA/
Leonard N. Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-287
Enclosures:
- 1. Summary of Conference With Duke Energy Corporation Regarding Spring 2003 Steam Generator Inspection Results at Oconee Nuclear Station, Unit 3
- 2. Telefaxes from Robert C. Douglas to Leonard N. Olshan dated May 19, May 20, and May 22, 2003 cc w/encls: See next page Distribution:
PUBLIC PDII-1 R/F LOlshan CHawes ADAMS ACCESSION NO: ML031810657
- No major change to phone call summary OFFICE PDII-1/PM PDII-1/LA EMCB/SC PDII-1/SC NAME LOlshan CHawes LLund*
JNakoski DATE 6/26/2003 6/26/2003 6/12/2003 6/27/2003 OFFICIAL RECORD COPY
SUMMARY
OF CONFERENCE CALL WITH DUKE ENERGY CORPORATION REGARDING SPRING 2003 STEAM GENERATOR INSPECTION RESULTS AT OCONEE NUCLEAR STATION, UNIT 3 On May 19, 2003, the NRC staff participated in a conference call with Duke Energy Corporation (licensee) to discuss the results of the inspections of the Oconee Nuclear Station, Unit 3 (Oconee 3) steam generator (SG) tubes that had been completed during the Spring 2003 outage. To facilitate the discussion, the licensee provided a written response to each of 16 discussion points that had been requested by the staff prior to the conference call. These discussion points and the licensee responses are included in Enclosure 2. Some items of note are highlighted below.
The Oconee 3 SGs are scheduled for replacement at the next refueling outage in the Fall of 2004. The inspection just completed is the last scheduled inspection for the current steam generators.
Primary-to-secondary leakage at the time of shutdown for the current outage was at a very low level, less than 2 gallons per day, and had not changed during the course of the cycle. No clear source of the leakage was identified during the SG tube inspections. No secondary side pressure test was conducted.
The inspection scope included a 100-percent bobbin coil inspection, supplemented by extensive
+Point inspection that included, but were not limited to, all bobbin indications, all dings (greater than 2 volts bobbin), all upper tube sheet roll and re-roll locations (except where repaired by sleeves), all sleeve roll joints, all alloy 600 rolled plugs, and a 40-percent sample of thimble plugs. The +Point program also included a 100-percent inspection of a critical area in the kidney region of the tube bundle from 2 inches above the top of the lower tube sheet (LTS) to 12 inches below the top of the LTS to address localized intergranular attack (IGA) that is present in this region. The licensee stated during the phone call that the critical area was defined on the basis of engineering judgement with the intention of bounding the region susceptible to this type of flaw. The lowermost IGA indication found was located 10 inches below the top of the LTS.
The tube inspections identified 618 tubes with pluggable indications. Over half the indications that were found involved freespan outer-diameter stress corrosion cracking and IGA located mostly in the upper two spans of the tube bundle. These freespan cracks ranged to 3 inches in length. The lengths, depths, and voltage responses of these indications were described by the licensee as being within the envelope of what had been experienced before at this unit and, with the exception noted below, have not been associated with failures during prior in situ pressure tests. The licensee performed in situ pressure tests of 13 of these tubes found to be most limiting in terms of flaw indication length, depth, or voltage response. All tests were conducted to three times normal operating pressure with no leakage observed.
At Oconee 2 in 2002, a tube with a freespan crack indication failed during in situ pressure testing at a pressure less than three times normal operating pressure. Hindsight analysis revealed that the crack indication had been present during the previous inspection but not identified by the analysts due to the confounding presence of a ding and a manufacturing burnish mark signal at that location. Therefore, for Oconee 3 the licensee preventively plugged 11 tubes with similar dent/volumetric response combinations that could potentially mask crack indications at those locations.
No new degradation mechanisms were observed during the 2003 inspection of Oconee 3.
Apart from the dominant freespan cracking mechanism, the other active mechanisms included tube wear at tube support plates; impingement; IGA in the tubesheet crevice and freespan; primary water stress corrosion cracking in the tube sheet rolls, re-rolls, dents, and plugs; and IGSCC in a sleeve expansion transition.
Apart from roll transition cracks, only one indication of circumferential cracking was observed; it was observed at an 11-volt ding located 2-1/2 inches from the hot leg tube end. This crack measured approximately 180 degrees around the circumference with measured depths ranging from 19 to 98 percent of the initial tube wall thickness. The licensee estimated the percent degraded area to be 35 percent. The licensee did not perform an in situ leakage or pressure test of this tube, but the licensee did perform an integrity assessment to verify that the tube would not sever or leak excessively under the differential thermal loads associated with a main steam line break.
Re-roll repairs were performed for 50 tubes with roll transition cracks. No sleeve repairs were performed.
The licensee stated that the severed tube issue for Oconee 3 was generally addressed during the previous inspection outage. Since then, however, the licensee identified an additional 7 tubes with welded plugs that could potentially be subject to the severance phenomena. The licensee, therefore, elected to capture (i.e., cage) these tubes by plugging and stabilizing all surrounding tubes.
The staff did not identify any concerns during the phone call regarding the licensees inspection program or the results obtained.
Oconee Nuclear Station cc:
Ms. Lisa F. Vaughn Legal Department (ECIIX)
Duke Energy Corporation 422 South Church Street Charlotte, North Carolina 28201-1006 Anne W. Cottingham, Esquire Winston and Strawn 1400 L Street, NW Washington, DC 20005 Manager, LIS NUS Corporation 2650 McCormick Drive, 3rd Floor Clearwater, Florida 34619-1035 Senior Resident Inspector U. S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, South Carolina 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Department of Health and Environmental Control 2600 Bull Street Columbia, South Carolina 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Drive Suite 705 Rosslyn, VA 22209 Mr. L. E. Nicholson Compliance Manager Duke Energy Corporation Oconee Nuclear Site 7800 Rochester Highway Seneca, South Carolina 29672 Ms. Karen E. Long Assistant Attorney General North Carolina Department of Justice P. O. Box 629 Raleigh, North Carolina 27602 Mr. C. Jeffrey Thomas Manager - Nuclear Regulatory Licensing Duke Energy Corporation 526 South Church Street Charlotte, North Carolina 28201-1006 Mr. Richard M. Fry, Director Division of Radiation Protection North Carolina Department of Environment, Health, and Natural Resources 3825 Barrett Drive Raleigh, North Carolina 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, North Carolina 28210