05000395/LER-1983-005, Forwards Updated LER 83-005/03L-1.Detailed Event Analysis Encl22 February 1983
05000395/LER-1983-006, Forwards Updated LER 83-006/03L-1.Detailed Event Analysis Encl22 February 1983
05000395/LER-1983-007, Forwards Updated LER 83-007/03L-1.Detailed Event Analysis Encl22 February 1983
05000395/LER-1983-008, Forwards Updated LER 83-008/03L-1.Detailed Event Analysis Encl17 March 1983
05000395/LER-1983-009, Forwards LER 83-009/03L-0.Detailed Event Analysis Encl23 February 1983
05000395/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl4 March 1983
05000395/LER-1983-011, Forwards LER 83-011/03L-0.Detailed Event Analyis Encl9 March 1983
05000395/LER-1983-012, Forwards LER 83-012/03L-0.Detailed Event Analysis Encl10 March 1983
05000395/LER-1983-013, Forwards LER 83-013/03L-0.Detailed Event Analysis Encl11 March 1983
05000395/LER-1983-014, Forwards LER 83-014/03L-0.Detailed Event Analysis Encl17 March 1983
05000395/LER-1983-015, Forwards LER 83-015/03L-0.Detailed Event Analysis Encl17 March 1983
05000395/LER-1983-016, Forwards LER 83-016/03L-0.Detailed Event Analysis Encl17 March 1983
05000395/LER-1983-017, Forwards LER 83-017/03L-0.Detailed Event Analysis Encl25 March 1983
05000395/LER-1983-018, Forwards LER 83-018/03L-0.Detailed Event Analysis Encl25 March 1983
05000395/LER-1983-019, Forwards LER 83-019/01L-0.Detailed Event Analysis Encl30 March 1983
05000395/LER-1983-020, Forwards LER 83-020/03L-0.Detailed Event Analysis Encl31 March 1983
05000395/LER-1983-021, Forwards LER 83-021/03L-0.Detailed Event Analysis Encl6 April 1983
05000395/LER-1983-022, Forwards LER 83-022/03L-0.Detailed Event Analysis Encl7 April 1983
05000395/LER-1983-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl8 April 1983
05000395/LER-1983-024, Forwards LER 83-024/03L-0.Detailed Event Analysis Encl8 April 1983
05000395/LER-1983-025, Forwards LER 83-025/03L-0.Detailed Event Analysis Encl11 April 1983
05000395/LER-1983-026, Forwards LER 83-026/03L-012 April 1983
05000395/LER-1983-027, Forwards LER 83-027/03L-0.Detailed Event Analysis Encl15 April 1983
05000395/LER-1983-028, Forwards LER 83-028/01T-0.Detailed Event Analysis Encl20 April 1983
05000395/LER-1983-029, Forwards LER 83-029/03L-0.Detailed Event Analysis Encl20 April 1983
05000395/LER-1983-030, Forwards LER 83-030/03L-0.Detailed Event Analysis Encl22 April 1983
05000395/LER-1983-031, Forwards LER 83-031/03L-0.Detailed Event Analysis Encl22 April 1983
05000395/LER-1983-034, Forwards LER 83-034/03L-0.Detailed Event Analysis Encl2 May 1983
05000395/LER-1983-038, Forwards LER 83-038/03L-0.Detailed Event Analysis Encl12 May 1983
05000395/LER-1983-060, /03L-0:on 831117,investigation Into Previously Submitted LER 83-060 Revealed Four Testable Components Not Tested on Quarterly Basis.Caused by Inadequate Procedure.Test Procedures Revised16 December 1983
05000395/LER-1983-100, Revised LER 83-100-01X-1:on 830831,PORV PCV-445A Declared Inoperable Due to Concern Re Possible Inadvertent Opening of Valve Upon Power Loss to Protective Cabinet 4.Caused by Design Error27 January 1984
05000395/LER-1984-013, Revised LER 84-013-01:on 840309,mod to Plant Integrated Fire & Security Sys Disabled Control Room Operator Ability to Receive Alarm Upon Actuation of Smoke Detectors in Zones Fff & Mmm of Intermediate Bldg19 April 1984
05000395/LER-1984-024, Revised LER 84-024-01:on 840422 & 29,reactor Tripped Due to Low Main Turbine Shaft Oil Pump Discharge Pressure.Caused by Conservative Switch Settings & Loss of Suction on Motor Suction Pump.Switch Setpoint Will Be Changed2 July 1984
05000395/LER-1985-010, Forwards LER 85-010-00 in Response to Violations Noted in Insp Rept 50-395/85-1521 June 1985
05000395/LER-1985-015, Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective Action20 August 1985
05000395/LER-1986-003, Forwards LER 86-003-00 (Special Rept Spr 86-006)30 April 1986
05000395/LER-1986-013, Forwards 860815 LER 86-013,responding to Notice of Violation from Insp Rept 50-395/86-13.Util in Full Compliance Re Corrective Action Stated in LER5 September 1986
05000395/LER-1987-007, Forwards 870513 LER 87-007 in Response to Violation Noted in Insp Rept 50-395/87-07.Util Agrees W/Alleged Violation. Corrective Action Should Allow Full Compliance by 870630 When Change to Surveillance Test Procedure 404.901 Fi17 June 1987
05000395/LER-1987-018, Forwards 870827 LER 87-018-00 Which Responds to Violation Addressed in Encl 1,Item a of Insp Rept 50-395/87-24.LER Addresses Reason for Violation & Corrective Actions Taken to Prevent Recurrence2 November 1987
05000395/LER-1987-019, Forwards LER 87-019-01.Schedule for Completion of Mod Updated to 871127 Due to Late Arrival of Matl for Mod28 October 1987
05000395/LER-1988-006, Special Rept Spr 88-05:on 880512,safety Injection/Reactor Trip Occurred When MSIV a Shut During Testing.Details Described in Encl LER 88-06.Accumulative Usage Factor for Affected Safety Injection Nozzle Did Not Exceed 0.708 July 1988
05000395/LER-1991-006, Forwards LER 91-006 Re Inadvertent ESF Actuation of DG in Response to Violation Noted in Insp Rept 50-395/91-17. Corrective Actions:Operations Staff Briefed on Necessity of Attention to Detail14 October 1991
05000395/LER-1993-00328 July 1993
05000395/LER-1993-00430 August 1993
05000395/LER-1994-002, Forwards LER 94-002 in Response to NRC Insp Rept 50-395/94-075 April 1994
05000395/LER-1996-004, Responds to Telcon W/G Lippard Re LER 96-004 on Leakage Past Motor Driven EFW Flow Control Valves Discovered During Recently Completed Refueling Outage at Station25 July 1996
05000395/LER-1998-004, Forwards LER 98-004-01 Re Unanalyzed Condition for Equipment Qualification Beyond Ten Minutes Following High Energy Line Break Outside Containment,Per 10CFR50.73(a)(2)(ii).Suppl Provides Addl Corrective Actions5 August 1998
05000395/LER-1998-009, Forwards LER 98-009-01 for VC Summer Nuclear Station.Rept Describes Unanalyzed Condition for non-safety Related Component for Which All Failure Mechanisms Had Not Been Evaluated28 January 1999
05000395/LER-1999-002, Forwards LER 99-002-00 Re Condition for Exceeding Vsns Design Basis During Surveillance Testing Utilizing Certain ECCS Valves.Simplified Flow Diagram Included to Identify Configurations Discussed by Rept Encl12 April 1999
05000395/LER-1999-004, Submits Suppl 1 to LER 99-004-00 Re Discovery of Several Fuel Assembly Top Nozzle Holdown Screws Which Had Failed. Root Cause Will Not Be Completed by 990829,as Committed.W Analysis Will Be Issued After Fall Outages Are Complet24 August 1999