Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
A980012, Requests Exemption from 24 Month UFSAR Until 981231.Detailed Discussion of Proposed Exemption,Evaluation Against Criteria of 10CFR50.12 & Commitments,Encl12 March 1998Requests Exemption from 24 Month UFSAR Until 981231.Detailed Discussion of Proposed Exemption,Evaluation Against Criteria of 10CFR50.12 & Commitments,EnclExemption Request
A980025, Discusses Applicable Regulations,Disposition of Commitments & Sys Required Following Permanent Shutdown & Defueling of Plant.Listing of Commitments Encl30 March 1998Discusses Applicable Regulations,Disposition of Commitments & Sys Required Following Permanent Shutdown & Defueling of Plant.Listing of Commitments EnclMaintenance Rule Program
Fire Protection Program
A98007, Requests Exemption from Requirements of 10CFR70.24, Criticality Accident Requirement. Commitments Made by Util,Encl17 April 1998Requests Exemption from Requirements of 10CFR70.24, Criticality Accident Requirement. Commitments Made by Util,EnclExemption Request
A98008, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-25 & 50-304/97-25.Corrective Actions:Revised Procedure SOI-61F to Reflect Need to Verify Position of 2MOV-SW0023 & Revised Procedure PT-10-3 to Provide Guidance20 February 1998Responds to NRC Re Violations Noted in Insp Repts 50-295/97-25 & 50-304/97-25.Corrective Actions:Revised Procedure SOI-61F to Reflect Need to Verify Position of 2MOV-SW0023 & Revised Procedure PT-10-3 to Provide Guidance
A98009, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02.Corrective Actions:Wa Pope Raychem Training Documentation Was Reviewed for Contractor Electricians Who Installed Raychem Splice on 97072426 February 1998Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02.Corrective Actions:Wa Pope Raychem Training Documentation Was Reviewed for Contractor Electricians Who Installed Raychem Splice on 970724Past operability
Condition Adverse to Quality
Scaffolding
A98010, Requests That Initial Operator License Exams Scheduled for Wks of 980209 & 16 Be Cancelled.Util Formally Withdraws All Individual License Applications Associated W/Exams4 February 1998Requests That Initial Operator License Exams Scheduled for Wks of 980209 & 16 Be Cancelled.Util Formally Withdraws All Individual License Applications Associated W/Exams
A98013, Requests NRC Approval of Certified Fuel Handler Training & Retraining Program.Copy of Zion Proposed Certified Fuel Handler Training & Retraining Program Contained in Attachment a16 March 1998Requests NRC Approval of Certified Fuel Handler Training & Retraining Program.Copy of Zion Proposed Certified Fuel Handler Training & Retraining Program Contained in Attachment a
A98017, Forwards Response to Violations Noted in Insp Repts 50-295/98-03 & 50-304/98-03.Corrective Actions:Monitor in Question Was Correctly Calibrated6 March 1998Forwards Response to Violations Noted in Insp Repts 50-295/98-03 & 50-304/98-03.Corrective Actions:Monitor in Question Was Correctly Calibrated
A98018, Informs NRC That Numerous Open Items on Zion Station Docket May Be Closed on Permanently Shutdown Status of Both Units.Commitments Encl29 May 1998Informs NRC That Numerous Open Items on Zion Station Docket May Be Closed on Permanently Shutdown Status of Both Units.Commitments EnclSafe Shutdown
Safe Shutdown Earthquake
VT-2
A98024, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02.Corrective Actions:Pmt,Pt 10-3, Containment Isolation Phase B Testing, Was Assigned to WR 960104192 at Time of Failure on 97120226 February 1998Responds to NRC Re Violations Noted in Insp Repts 50-295/97-02 & 50-304/97-02.Corrective Actions:Pmt,Pt 10-3, Containment Isolation Phase B Testing, Was Assigned to WR 960104192 at Time of Failure on 971202
A98026, Responds to NRC Re Violations Noted in Insp Repts 50-295/97-32 & 50-304/97-32.Corrective Actions:Disciplined Individuals Involved & Distributed Ltr to Personnel Discussing Event & Lessons to Be Learned27 March 1998Responds to NRC Re Violations Noted in Insp Repts 50-295/97-32 & 50-304/97-32.Corrective Actions:Disciplined Individuals Involved & Distributed Ltr to Personnel Discussing Event & Lessons to Be Learned
A98038, Forwards LER 98-S02-00 Which Is Being Submitted as Voluntary Security Event Rept.Commitments Made by Util,Listed in Attachment B12 June 1998Forwards LER 98-S02-00 Which Is Being Submitted as Voluntary Security Event Rept.Commitments Made by Util,Listed in Attachment B
A98047, Forwards Revised Scope of One Commitment Contained in Response to NOV28 August 1998Forwards Revised Scope of One Commitment Contained in Response to NOV
A98050, Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal5 October 1998Forwards Zion Station Special Rept Number 30412398002SR.Rept for Reporting Period of Jan 1996-Dec 1997.Attachment B Provides Listing of Commitments Contained in Submittal
A98051, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology20 November 1998Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEI Commitment Change Methodology
A98053, Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR,10 November 1998Forwards Change Instructions for Update to Zion UFSAR, Rewritten to Reflect Permanent Defueled Condition of Plant. & DSAR,Operating Basis Earthquake
Incorporated by reference
A98055, Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology20 November 1998Forwards List of Revised Regulatory Commitments Which Were Evaluated as Satisfactory Using NEC Commitment Change Methodology
A98056, Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change Methodology11 December 1998Forwards List of Revised Various Commitments Originally Contained in Util to Nrc.Changes in Commitments Were Satisfactorily Evaluated Using NEI Commitment Change MethodologyOperability Assessment
A98059, Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error11 November 1998Forwards Page Change Instruction for Aug 1998 DSAR for Zion Nuclear Power Station,Units 1 & 2.Instruction Was Omitted from 981110 DSAR Due to Administrative Error
A99001, Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments19 January 1999Forwards Zion 1998 Annual Rept of Revised Regulatory Commitments
A99009, Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B1 March 1999Forwards Znps Annual Occupational Exposure Rept, for Exposures Occurring in 1998.Listing of Commitments Contained in Ltr Provided as Attachment B
A99011, Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor18 March 1999Responds to NRC Re Violations Noted Insp Repts 50-295/98-02 & 50-304/98-02.Corrective Actions:Uncontrolled Safeguards Documents Were Immediately Taken Into Possession & Controlled by Plant Security Supervisor
A99014, Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station15 April 1999Provides Description of Actions Comed Has Taken to Reinforce Safety Conscious Work Environ at Zion Nuclear Power Station
A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold27 May 1999Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold
A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station15 September 1999Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion StationUltimate heat sink
Earthquake
Maintenance Rule Program
DD-85-10, Advises That Time for Commission to Review Director'S Decision DD-85-10 Expired.Commission Declined Review. Decision Became Final Agency Action on 851108.Served on 85111313 November 1985Advises That Time for Commission to Review Director'S Decision DD-85-10 Expired.Commission Declined Review. Decision Became Final Agency Action on 851108.Served on 851113
IA-87-512, Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees14 September 1987Partial Response to FOIA Request Re Lers.App C Documents Available in Pdr.App D Documents Encl & Available in Pdr.App E Documents Partially Withheld (Ref FOIA Exemption 4).Listed LERs Not Issued Bu Licensees
IA-97-152, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety from Public Disclosure (Ref Exemption 7A)19 June 1997Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety from Public Disclosure (Ref Exemption 7A)
IA-97-171, Final Response to FOIA Request for Documents.Records in App a Encl & Available in Pdr.App B Records Withheld in Part (Ref FOIA Exemption 5)23 June 1997Final Response to FOIA Request for Documents.Records in App a Encl & Available in Pdr.App B Records Withheld in Part (Ref FOIA Exemption 5)
IA-98-156, Partially Deleted Ltr Ack Which Transmitted Correspondence from Constituent Re Personnel Matter at Zion Nuclear Station31 December 1997Partially Deleted Ltr Ack Which Transmitted Correspondence from Constituent Re Personnel Matter at Zion Nuclear Station
IR 05000237/198401515 May 1985Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-373/84-25, 50-374/84-32,50-237/84-15,50-249/84-14,50-254/84-15, 50-265/84-13,50-295/84-19 & 50-304/84-20
IR 05000295/198200325 June 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-295/82-03 & 50-304/82-03
IR 05000295/19820084 August 1982Ack Receipt of Informing NRC of Steps Taken to Correct Noncompliance Noted in IE Insp Rept 50-295/82-08
IR 05000295/198201216 July 1982Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-295/82-12 & 50-304/82-10
IR 05000295/19850056 March 1986Discusses Util Commitments to NUREG-0737,Item III.D.3.4 Re Control Room Emergency Air Cleaning Sys,Per Insp Repts 50-295/85-05 & 50-304/85-05.Schedule for Leakage Tests & Test Procedures Requested 30 Days Prior to Test
IR 05000295/198600215 April 1986Forwards Insp Repts 50-295/86-02 & 50-304/86-02 on 860127-0214 & Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 for Failure to Ensure Adequate Valve Positioning Controls for safety-related Sys
IR 05000295/198601419 November 1986Forwards Reactive Special Safeguards Insp Repts 50-295/86-14 & 50-304/86-13 & Notice of Violation on 860626-0723. Violation Reclassified as Severity Level Iv.Corrective Action Satisfactory.W/O Notice of Violation
IR 05000295/198601615 June 1987Discusses Safety Insp Repts 50-295/86-16 & 50-304/86-15 on 860709-10 & 29 Forwards Notice of Violation.Nrc Review of Deficiency for Possible Enforcement Action Complete
IR 05000295/198603015 May 1987Discusses Safety Insp Repts 50-295/86-30 & 50-304/86-30 on 861230-870114 & Forwards Notice of Violation.One Significant Deficiency Identified Re Implementation of Environ Qualification Program
IR 05000295/198603213 July 1987Discusses Safety Insp Repts 50-295/86-32 & 50-304/86-32 on 861210-870116 & Forwards Notice of Violation.Response Should List Corrective Actions & Address Controls to Preclude Instances of Mispositioned Containment Isolation Valves
IR 05000295/198700213 March 1987Forwards Safety Insp Repts 50-295/87-02 & 50-304/87-02 on 870223-27.No Violations Noted
IR 05000295/19870052 October 1987Forwards Insp Repts 50-295/87-05 & 50-304/87-05 on 870302-0610 & Notice of Violation & Proposed Imposition of Civil Penalty
IR 05000295/198701622 July 1987Discusses Safety Insp Rept 50-295/87-16 on 870508-12 & Forwards Notice of Violation
IR 05000295/198802129 March 1989Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-295/88-21 & 50-304/88-21.Written Verification of Commitments Stated Requested within 45 Days of Ltr Date
IR 05000295/19890048 March 1989Discusses Safety Insp Repts 50-295/89-04 & 50-304/89-04 on 890105 & Forwards Notice of ViolationSafe Shutdown
IR 05000295/198900527 March 1989Forwards Insp Repts 50-295/89-05,50-304/89-05,50-295/89-03 & 50-304/89-03 on 881215-890124 & Notice of Violation. Violation Resulted from Inadequate Communication Between Contractor Employees & Member of Security Staff
IR 05000295/198901330 May 1989Forwards Safety Insp Repts 50-295/89-13 & 50-304/89-13 on 890318-0508.No Violations Noted.Rept Highlights Number of Shortcomings Identified in Maint Area,Including Work Package Preparation & Documentation of Work Activities
IR 05000295/198901726 May 1989Forwards Safety Insp Rept 50-295/89-17 on 890317-0510. Violations Noted.Licensee Will Be Notified of NRC Decision Re Enforcement Action Based on Insp Findings
IR 05000295/198902221 September 1989Forwards Insp Repts 50-295/89-22 & 50-304/89-20 on 890710-18 & Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000 Re Unprotected Vital Area Barrier.Encls Withheld (Ref 10CFR73.21)
IR 05000295/198920014 August 1990Discusses Insp Repts 50-295/89-200 & 50-304/89-200 on 891127-1208 & Forwards Notice of Violation.Review of Vendor Interface Program Indicated Need for Improvement.Nrc Will Review Operability DeterminationOperability Determination