Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CPSES-200600580, 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. | 3 April 2006 | 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. | Anticipated operational occurrence Offsite Circuit |
CPSES-200600652, Transmittal of Revised Comanche Peak Steam Electric Station Security Plan, Revision 1 | 4 April 2006 | Transmittal of Revised Comanche Peak Steam Electric Station Security Plan, Revision 1 | |
CPSES-200600870, (Cpses), Transmittal of Year 2005 Radioactive Effluent Release Report | 28 April 2006 | (Cpses), Transmittal of Year 2005 Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Process Control Program |
CPSES-200600871, Transmittal of the Annual Radiological Environmental Operating Report for 2005 | 28 April 2006 | Transmittal of the Annual Radiological Environmental Operating Report for 2005 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
CPSES-200600904, Submittal of the Annual Non-Radiological Environmental Operating Report for 2005 | 28 April 2006 | Submittal of the Annual Non-Radiological Environmental Operating Report for 2005 | |
CPSES-200600994, Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval) | 18 May 2006 | Inservice Inspection Program Plan from the 1998 Edition of ASME Code, Section XI, Through 2000 Addenda (Interval Start Date - August 13, 2000, Second Interval) | Liquid penetrant |
CPSES-200601004, Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Power | 31 May 2006 | Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Power | Incorporated by reference |
CPSES-200601043, 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations | 8 June 2006 | 60-Day Response to NRC Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations | Safe Shutdown Fire Barrier Hemyc Exemption Request |
CPSES-200601056, Response to Request for Additional Information Related to License Amendment Request (LAR) 2004-010 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity | 7 June 2006 | Response to Request for Additional Information Related to License Amendment Request (LAR) 2004-010 Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity | Ultimate heat sink Non-Destructive Examination Post Accident Monitoring Operating Basis Earthquake Nondestructive Examination Earthquake Pressure Boundary Leakage |
CPSES-200601101, Relaxation Request for NRC Issuance of First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | 22 June 2006 | Relaxation Request for NRC Issuance of First Revised Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors | Boric Acid Nondestructive Examination |
CPSES-200601155, Response to Request for Additional Information Re 2005 Steam Generator Tube Inspections | 12 June 2006 | Response to Request for Additional Information Re 2005 Steam Generator Tube Inspections | |
CPSES-200601160, Revised Response to the 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. | 29 June 2006 | Revised Response to the 60-Day Response to NRC Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power. | Anticipated operational occurrence Offsite Circuit |
CPSES-200601177, Supplement to License Amendment Request (LAR) 05-010 Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System. | 23 June 2006 | Supplement to License Amendment Request (LAR) 05-010 Revision to Technical Specification 3.3.2, ESFAS Instrumentation, 3.5.2, ECCS-Operating, and 3.6.7, Spray Additive System. | |
CPSES-200601296, Response to RAI, Relief Request A-1 for the Unit 2 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds.. | 27 June 2006 | Response to RAI, Relief Request A-1 for the Unit 2 Inservice Inspection for Application of an Alternative to the ASME Boiler and Pressure Vessel Code Section XI Examination Requirements for Class 1 and 2 Piping Welds.. | Dissimilar Metal Weld |
CPSES-200601299, Supplement to Relief Request P-1 to the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) | 29 June 2006 | Supplement to Relief Request P-1 to the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) | Internal Flooding |
IR 05000445/2005005 | 7 April 2006 | Errata for Comanche Peak Steam Electric Station - NRC Integrated Inspection Report 05000445-05-005 and 05000446-05-005 | Boric Acid Condition Adverse to Quality Liquid penetrant |
IR 05000445/2006002 | 4 May 2006 | IR 05000445-06-002, IR 05000446-06-002 on 01/01/2006-03/24/2006; Comanche Peak Steam Electric Station, Units 1 and 2; Event Followup, Other Activities | Safe Shutdown High Radiation Area Stroke time Slow transfer Internal Flooding Condition Adverse to Quality Significance Determination Process Foreign Material Exclusion Large early release frequency Maintenance Rule Program Power change |
IR 05000445/2006008 | 17 April 2006 | IR 05000445-06-008, 05000446-06-008; on 03/13/06-03/17/06; Comanche Peak Steam Electric Station, Units 1 & 2; Radioactive Material Processing and Transportation, Radioactive Material Control Program | High Radiation Area Offsite Dose Calculation Manual Significance Determination Process |
ML060860258 | 24 April 2006 | License Amendment, Issuance of Amendments Revision to TS 3.7.5 for Auxiliary Feedwater System | |
ML060890314 | 18 May 2006 | Summary of Conference Calls, 2005 Steam Generator Tube Inspections | |
ML060930760 | 3 April 2006 | Letter Dtd 04/03/06 from Bruce S. Mallett, RA to Mike Blevins, Sr. VP and CNO, Txu Power (Cpses), Thank You for Administrative Staff Site Tours | |
ML061010251 | 7 April 2006 | Generic Fundamentals Examination Results | Generic Fundamentals Examination |
ML061090867 | 19 April 2006 | Notice of Meeting with Txu Energy to Present and Discuss Performance Results of the Comanche Peak Station for the Period of January 1 Through December 31, 2005 | |
ML061160064 | 24 April 2006 | Technical Specification Pages 3.7.5 for Auxiliary Feedwater System | |
ML061220436 | 18 May 2006 | Attachment 3 to Comanche Peak Conference Call | |
ML061220448 | 18 May 2006 | Attachment 2 to Comanche Peak Conference Call | |
ML061220456 | 18 May 2006 | Attachment 1 to Comanche Peak Conference Call | |
ML061230284 | 2 May 2006 | 5/1/2006, Summary of Meeting with Txu Energy Regarding Comanche Peak End-Of-Cycle Assessment | |
ML061280580 | 30 June 2006 | Memo with Enclosures 1 and 2, - Trip Report Regarding Staff Observations Regarding Flume Testing of a Prototype Portion of the Proposed Replacement Suction Screen Design for the Comanche Peak Steam Electric Station | Coatings |
ML061310520 | 30 June 2006 | Enclosure 3: Pictures of Cpses/Pci Prototype Strainer Testing (Tests 1 and 5) | |
ML061360087 | 23 May 2006 | Bulletin 2004-01, Inspections of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Comanche Peak Steam Electric Station, Units 1 and 2 | Boric Acid Nondestructive Examination Through-Wall Leak |
ML061440632 | 18 May 2006 | CPSES - Retake Exam - 09/2005 - Public Forms | |
ML061720159 | 12 April 2006 | Individual Invitation Letter to Public Annual Performance Assessment Meeting Regarding Comanche Peak Steam Electric Station | |
ML061730164 | 30 June 2006 | Enclosure 4: CPSES Comments on and Input to NRC Draft Trip Report | Coatings |
ML070230390 | 13 April 2006 | Keeler Long DBA Testing of Coating Supplies | |
ML070230392 | 6 April 2006 | Report 06-0413 Chart 7 | |
ML070230395 | 6 April 2006 | Report 06-0413 Chart 120-307 | |
ML070230396 | 10 April 2006 | Report 06-0413 Chart 250-200 | |
ML070230397 | 6 April 2006 | Report 06-0413 Chart 307-250 | |
ML070230398 | 13 April 2006 | Report 06-0413 Chart End Test | |
ML070230400 | 13 April 2006 | Default-Graph 001 | |
Press Release-IV-06-004, NRC to Discuss 2005 Performance at Comanche Peak | 25 April 2006 | Press Release-IV-06-004: NRC to Discuss 2005 Performance at Comanche Peak | |
TAC:MC3470 | 23 May 2006 | ||
TAC:MC5385 | 29 June 2006 | ||
TAC:MC8621 | 18 May 2006 | ||
TAC:MC9503 | 27 June 2006 |