05000413/LER-1950-412, Forwards Rept Summarizing Review Results of Interunit Electrical Interfaces,Which Was Part of Corrective Action for LER 50-412/85-51.Item Also Identified in Insp Repts 50-413/85-35 & 50-414/85-32 | 13 March 1986 | Forwards Rept Summarizing Review Results of Interunit Electrical Interfaces,Which Was Part of Corrective Action for LER 50-412/85-51.Item Also Identified in Insp Repts 50-413/85-35 & 50-414/85-32 | |
05000413/LER-1986-037, Forwards LER 86-037-00 Re Inoperable Ice Condenser Lower Inlet Doors Due to Personnel Error.Event of No Significance to Health & Safety of Public.Previous LER Numbered 86-037 Changed to 86-033 by | 29 August 1986 | Forwards LER 86-037-00 Re Inoperable Ice Condenser Lower Inlet Doors Due to Personnel Error.Event of No Significance to Health & Safety of Public.Previous LER Numbered 86-037 Changed to 86-033 by | |
05000413/LER-1987-011, Forwards LER 87-011-03 Re Shutdown Due to Diesel Generator Inoperability Because of Mfg Deficiency.Ler 87-011-01,dtd 870506 Should Have Been Rev 2 & Did Not Include Changes from 870413 Submittal | 10 June 1987 | Forwards LER 87-011-03 Re Shutdown Due to Diesel Generator Inoperability Because of Mfg Deficiency.Ler 87-011-01,dtd 870506 Should Have Been Rev 2 & Did Not Include Changes from 870413 Submittal | |
05000413/LER-1987-036, Advises That LER 87-36 Re Operation of Nuclear Svc Water Sys Will Be Delayed to Allow for Proper Review & Consideration of Info Recently Gathered by Util.Ler Originally Due on 870930.Rept Will Be Submitted on 871023 | 30 September 1987 | Advises That LER 87-36 Re Operation of Nuclear Svc Water Sys Will Be Delayed to Allow for Proper Review & Consideration of Info Recently Gathered by Util.Ler Originally Due on 870930.Rept Will Be Submitted on 871023 | |
05000413/LER-1987-037, Advises That Submittal of LER 87-037-00,re Itt Grinnell mini-stiff Pipe Clamps Found Broken Due to Improper Heat Treatment,Will Be Delayed Until 871215 to Allow for Analysis & Review of Pertinent Info | 12 November 1987 | Advises That Submittal of LER 87-037-00,re Itt Grinnell mini-stiff Pipe Clamps Found Broken Due to Improper Heat Treatment,Will Be Delayed Until 871215 to Allow for Analysis & Review of Pertinent Info | |
05000413/LER-1987-041, Resubmitted Ltr Forwarding LER 87-041-00 | 4 January 1988 | Resubmitted Ltr Forwarding LER 87-041-00 | |
05000414/LER-1986-033, Forwards LER 86-033-00 Re Phase a Containment Isolation, for Unit 2.LER 86-037-00 Inadvertently Submitted on 860808 as Being Applicable to Unit 1.Number Will Be Reassigned to Next LER Applicable to Unit 1 | 18 August 1986 | Forwards LER 86-033-00 Re Phase a Containment Isolation, for Unit 2.LER 86-037-00 Inadvertently Submitted on 860808 as Being Applicable to Unit 1.Number Will Be Reassigned to Next LER Applicable to Unit 1 | |
LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | 18 February 1983 | Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | |
ML15217A103 | 28 February 1990 | Forwards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1989 for McGuire Nuclear Station Units 1 & 2 & Revised Process Control Programs & Offsite Dose Calculation Manuals | Offsite Dose Calculation Manual Process Control Program |
ML16152A870 | 30 October 1989 | Forwards Public Version of Rev 32 to Crisis Mgt Plan for Nuclear Stations. W/891113 Release Memo | |
ML16152A873 | 1 November 1989 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 31 to CMIP-1,Rev 28 to CMIP-4,Rev 32 to CMIP-5,Rev 37 to CMIP-6,Rev 36 to CMIP-7,Rev 25 to CMIP-8 & Rev 31 to CMIP-9.W/891020 Release Memo | |
ML16152A909 | 18 January 1990 | Forwards Public Version of Rev 33 to Crisis Mgt Implementing Procedure CMIP-1, Recovery Manager & Immediate Staff & Rev 24 to CMIP-2, News Group Plan. W/900131 Release Memo | |
ML16152A953 | 2 May 1990 | Forwards Proprietary DPC-NE-2000P-A & Nonproprietary DPC-NE-2000-A, DCHF-1 Correlation for Predicting Heat Flux in Mixing Vane Grid Fuel Assemblies. Proprietary Rept Withheld | |
ML16152A962 | 9 May 1990 | Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 35 to CMIP-1,Rev 26 to CMIP-2,Rev 31 to CMIP-4,Rev 35 to CMIP-5,Rev 40 to CMIP-6,Rev 39 to CMIP-7 & Rev 26 to CMIP-8.W/DH Grimsley 900517 Release Memo | |
ML16162A401 | 29 October 1982 | Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures 5.3.1 Re Recovery Manager & Immediate Staff Group Plan & 5.3.6 Re Radiological Support Group | |
ML16162A405 | 2 December 1982 | Forwards Public Version of Revision 7 to Crisis Mgt Plan & Revisions to Crisis Mgt Plan Implementing Procedures | |
ML16259A239 | 22 August 1990 | Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo | |
ML17277B681 | 26 March 1985 | Advises of Personnel Changes Effective 850415.Prof Qualifications for Listed Individuals Available in FSAR Apps 13.1A & 13.1B | |
ML18018A736 | 6 September 1983 | Comments on Reg Guide 1.97,identified as Instrumentation & Control Sys Branch Draft SER Open Item 223,in Response to NUREG-0737,Suppl 1.Design & Qualification Criteria for Instrumentation Consistent W/Guide | Boric Acid |
ML18024B534 | 7 May 1979 | Responds to NRC 790413 Ltr Re Violations Noted in IE Insp Repts 50-413/79-05 & 50-414/79-05.Corrective Actions: Nitrogen Blanket Placed on Heat Exchanger & Personnel Instructed Re Nonconforming Item Rept | |
ML19207B026 | 16 July 1979 | Responds to IE Bulletin 79-09.No GE Type AK-2 Circuit Breakers Used or Planned for Use in safety-related Sys | |
ML19207C183 | 31 August 1979 | Requests That Review of License Application,Fsar & Environ Rept Be Completed as Soon as Possible.Will Update Application in mid-1980.Facility Correspondence Should Be Addressed to WO Parker | |
ML19208A544 | 15 August 1979 | Notifies That 790814 Teledyne Engineering Svcs Technical Rept TR-3501-1,submitted by WO Parker,Serves as Final Response to IE Bulletin 79-02,Revision 1 | |
ML19208A620 | 9 August 1979 | Ack Receipt of Two Revisions to C-E Generic Rept Atypical Matl in Reactor Pressure Vessel Welds. | |
ML19208A789 | 21 August 1979 | Forwards Interim Deficiency Rept Re Steam Generator Water Level Measurement Sys Errors | |
ML19209A605 | 10 September 1979 | Forwards Response to 790815 Ltr Re Request for Suppl to 790806 Submittal Regarding IE Insp Repts 50-413/79-12 & 50-414/79-12.Discusses Each Generic Example Re QA Procedure P-1 | |
ML19209A771 | 7 September 1979 | Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Two Bingham-Willamette Model 30 by 44C-VTM Vertical Turbine Deep Draft Pumps Utilized in safety-related Applications in Each Facility.Pumps Not Yet Operational | |
ML19210E245 | 7 November 1979 | Responds to IE Bulletins 78-12,78-12A & 78-12B Re Weld Matl Documentation.Info Pertinent to Catawba Unit 1 Reactor Vessel Included in Rdm Rept Which Was Submitted 791029. Westinghouse Transmittal Ltr Encl | |
ML19211A411 | 5 December 1979 | Ack Receipt of IE Insp Repts 50-413/79-19 & 50-414/79-19 on 791009-12.No Proprietary Info | |
ML19224C539 | 16 May 1979 | Discusses Schedule of Response to IE Bulletins 78-12,12A, & 12B.C-E to Submit Generic Rept Directly to NRC by 790629. Westinghouse Submittal Re Rotterdam Vessel Expected in July 1979 | |
ML19225A390 | 29 May 1979 | Responds to IE Bulletin 79-07 Re Use of Particular Computer Programs.Superpipe Used on All Piping Analyses Except Analysis Performed by Westinghouse | |
ML19225A400 | 25 May 1979 | Responds to NRC 790502 Ltr Re Violations Noted in IE Insp Repts 50-413/79-06 & 50-414/79-06.Corrective Actions: Exterior Surface Dome Pour Number 32 Reinspected & Repaired & Area Cleared of Debris | |
ML19225D047 | 19 July 1979 | Responds to IE Bulletin 79-11.No Westinghouse DB-50 or DB-75 Circuit Breakers Are Used or Planned for Use in safety-related Sys | |
ML19241B018 | 4 June 1979 | Ack Receipt of IE Insp Repts 50-413/79-09 & 50-414/79-09 on 790508-11.No Proprietary Info | |
ML19242A772 | 27 July 1979 | Responds to 790706 Request Re Info on Potential Impact on NRC Resource Needs & Priorities Associated W/Decision to Delay Commercial Operation of Cherokee 1 & 2 & Postpone Financial Commitments for Cherokee 3 & Perkins 1,2 & 3 | |
ML19242C416 | 22 June 1979 | Responds to NRC 790605 Ltr Re Violations Noted in IE Insp Repts 50-413/79-04 & 50-414/79-04.Corrective Actions:Bank Opposite Low Pressure Svc Water Intake Structure Was Riprapped on 790525 to Control Erosion | |
ML19242D189 | 20 July 1979 | Forwards Significant Deficiency 413-414/79-1 | |
ML19246C039 | 24 May 1979 | Ack Receipt of IE Insp Repts 50-413/79-08 & 50-414/79-08.No Proprietary Info | |
ML19247B227 | 5 July 1979 | Responds to IE Bulletin 79-02,Revision 1.Base Plate Flexibility Will Be Accounted for in Calculation of Expansion Anchor Bolt Loads for All Seismic Category 1 Pipe Support Base Plates | |
ML19248D227 | 6 August 1979 | Notifies That Projected Dates for Fuel Loading & Commercial Operation Are Delayed.Will Forward Request & Justification for Extension of CP to Accommodate Relay | |
ML19248D258 | 8 August 1979 | Requests Use of ASME Code Case N-242 for Steam Generator Power Operated Relief Valves.B&W Certificate of Conformance Encl | |
ML19249B544 | 2 July 1979 | Responds to IE Bulletins 78-12,78-12A & 78-12B.Weld Matl Data & Other Required Info Included in C-E Rept | |
ML19249D907 | 18 September 1979 | Responds to 790801 Ltr Requesting Submittal of Proposed Water Chemistry Program to Replace Proposed Tech Specs on Secondary Water Chemistry.Answer to Request Will Be Provided During Review of Facility FSAR & OL Application | |
ML19249E430 | 12 July 1979 | Ack Receipt of IE Insp Repts 50-413/79-10 & 50-414/79-10 on 790612-14.No Proprietary Info | |
ML19249E547 | 4 September 1979 | Ack Receipt of IE Insp Repts 50-413/79-16 & 50-414/79-16. No Proprietary Info | |
ML19253A895 | 20 August 1979 | Ack Receipt of IE Insp Repts 50-413/79-14 & 50-414/79-14 on 790724-27.No Proprietary Info | |
ML19253C350 | 16 November 1979 | Ack Receipt of IE Insp Repts 50-413/79-18 & 50-414/79-18 on 791002-03.No Proprietary Info | |
ML19254B348 | 6 August 1979 | Responds to NRC 790711 Ltr Re Violations Noted in IE Insp Repts 50-413/79-12 & 50-414/79-12.Corrective Actions:Qa Personnel Reinstructed in Proper Handling of Document Approval & QA Procedure P-1 Revised | |
ML19254D273 | 1 October 1979 | Responds to IE Bulletin 79-12, Short Period Scrams at BWR Facilities. Info Will Be Available by 791130 | |
ML19254D435 | 1 October 1979 | Responds to NRC 790924 Ltr Re Violations Noted in IE Insp Repts 50-413/79-12 & 50-414/79-12.Corrective Actions: Documentation Package from Six Specs Rechecked for Generic Problems |