ML19254D435

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-413/79-12 & 50-414/79-12.Corrective Actions: Documentation Package from Six Specs Rechecked for Generic Problems
ML19254D435
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 10/01/1979
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19254D431 List:
References
NUDOCS 7910250506
Download: ML19254D435 (2)


Text

{

't

(

DIIKs P6wnu Coxiwxy I'owtu Ilraui No 4e.: SorTri Curucri STnEET, CHAHU)TTE, N. C. anau C

np f.3 9 e

() u o

v WILLIAM O PA R M E R, J R.

v.cr Pats crut October 1, 1979 g, 774 Strau Pooogviom

yum, Mr. J. P. O'Reilly, Director U.S. Nuclear ReFulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, CA 30303 Catawba Nuclear Station OII:RJH nspection Reports: 50-413/79-12 and 50-414/79-12

Dear Mr. O'Reilly:

In a September 24, 1979 letter, Mr. C. E. Murphy of your office confirmed our commitment to provide by this date a supplemental response concerning the soove referenced Inspection Reports. Attached is our supplemental resp onse.

Very truly yours,

'M:

C. P William O. Parker, Jr.

ROS/sch Attachment OgnPROGeg a

=

7 910250[db th Anniversary

  1. owen #^

D n/$

-.a. cow

i DUKE SUPPLEMENTAL RESPONSE TO DEFICIENCY 50-413 & 414/79 02 1.

One documentation package from six sep ate specifications was re-checked to assure that a generic probica did not exist. All packages were acceptable and met the applicable specification requirements.

Two of the packages contained typographical errors (i.e., transposed digits) which have been corrected by the supplier.

2.

As a follow-up response to W. O. Parker's letter of September 10, 1979 to J. P. O'Reilly, applicab,e receiving inspection documentation that was placed in QC Hold and requited QA Engineering and Service approval was reviewed. All documents were verified correct on September 28, 1979.

1209 320