ML16162A405

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 7 to Crisis Mgt Plan & Revisions to Crisis Mgt Plan Implementing Procedures
ML16162A405
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire, 05000000
Issue date: 12/02/1982
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML16162A406 List:
References
NUDOCS 8212230108
Download: ML16162A405 (2)


Text

DuE POWER GolmnAY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HAL B. TUGKER TELEPHONE VICE PRSIDE ,-'(704) 373-4501 NUCLEAR PRODUCTION December 2, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington,.D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Oconee Nuclear Station Catawba Nuclear Station Docket Nos. 50-369, -370; 50-269, -270, -287; 50-413, -414

Dear Mr. Denton:

Enclosed for NRC Staff use and review are ten copies of Revision 7 (dated November 29,. 1982) for the Crisis Management Plan. Ten copies of the latest revisions to the following Crisis Management Plan Implementing Procedures are included also:

1) 5.3.2 - McGuire Crisis. News-Group Plan (Revision-1, dated November 1, 1982. and Revision 2, dated November 22 1982)
2) 5.3.3 - Administration and togistics Group Plan (Revision 4, dated September 15, 1982)
3) 5.3.11 - McGuire Crisis Phone Directory (Revision 3, dated November 29, 1982)

These revisions should be incorporated into.your Crisis Management Plan manuals, removing any earlier version pages of this plan.

Please delete privacy material in the form of personal telephone numbers prior to placing any material in the public document room, specifically:

1) Part IIIA, Crisis News Director, pages.4-6 Part. IIIE, Internal Communications Coordinator, page-10 Part IIIHMedia Registration-Coordinator, page 14 Part IIIJj, Audio/Visual Coordinator, page .17 Part IIM, 'Assistant Crisis News Director, page 20 Part IIIN, General Office Staff, page 21 Part IIIO, Secretarial Team, page 22 Figure 4, Notification:Coordinator Call List, pages 35-36 Figure 5, Call Lists, pages 37-46 Figure 6, Industry/Agency Coordinator Call List, pages 7-48 Figure 7, Governments'Coordinator Call-List, pages 49-51 Figure 8, SGL Call List, pages:,52-54 Figure 9, FGL Call-List, pages 55-56 8212230108 821215 9 fi PDR ADOCK 0500026 A F PDR

.'-_7

Mr. Harold R. Denton, Director December 2, 1982 Page 2

2) Section B10, Photography Services, page B-3 Appendix B-1, Secretarial/Clerical Support, pages B-6 and B-7 Appendix B-3, Office Equipment,,page B-10 Appendix B-4, Office Supply Companies, page B-13 Appendix B-7, Telephone Callup List, pages B-47 and B-48 Section H-4, Technical and Craft Personnel, page H-2 Appendix H-1, Major Equipment Suppliers, page H-4 Section I-5, First Call Out, page:I-2 Appendix I-1,. Catawba Nuclear Project, Personnel and Equipment, page 1-4 Appendix I-6, Aircraft Charter Telephone List, page I-11 Section J-4,. Reserve Personnel, page J-1, J-2, and J-3 By copy of this letter, three copies of-each of the above documents are being provided to the NRC, Region II.

Very truly yours, Hal B. Tucker WHM/php Enclosure cc: (w/o enclosure)

Senior Resident Inspector McGuire Nuclear Station Mr. W. T. Orders Senior Resident Inspector Oconee Nuclear Station Mr. P. K. Van Doorn Senior Resident Inspector Catawba Nuclear Station (w/3 copies of enclosure)

Mr. James P. O'Reilly, Regiotal Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite. 3100 Atlanta, Georgia 30303