Responds to NRC Re Violations Noted in IE Insp Repts 50-413/79-04 & 50-414/79-04.Corrective Actions:Bank Opposite Low Pressure Svc Water Intake Structure Was Riprapped on 790525 to Control Erosion
ML19242C416
Person / Time
Site: Catawba  
Issue date: 06/22/1979
From: Dail L
DUKE POWER CO.
To: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19242C414 List:
References
CN-1421.13, NUDOCS 7908100383
Download: ML19242C416 (1)


Text

'i DUKp jPO3'pH.CO31PANY Er.ncTair ('1xrt:n. Ilox :kbiN9. ( 'la ninI'rt:. N. ( '.

2*282 E.hSEr j.'UI] 27 a9 5I n.,2,

~... ~

June 22, 1979 Mr. J. T. Sutherland, Chief Fuel Facili ty and Materials Safety Branch U. S. Nuclear Regulatory Comission, Region 11 101 Marietta Street, N. W., Suite 3100 Atlanta, Ga.

30303 Re:

Catawba Nuclear Station,1. nits I f, 't Rll: ALC 50-413/79-4 and 50-414/79-4 File No:

CN-1421.13

Dear Mr. Sutherland:

This refers to an inspection conducted by Mr. A. L. Cunningham on May 15-17, 1979 at Catawba Nuclear Station.

In his report, one item of noncompliance was noted concerning the licensee's f ailure to provide adequate erosion control measures in the site construction area.

Your letter requested that a response, pursuant to 10CFR 2.201, be filed within twenty (20) days of receipt of the report.

Following is Duke Power Company's response:

1, The northwest bank opposite the LPSW intake structure was riprapped to effectively control erosion of the area.

2.

No f urther corrective measures are requi red.

3 Full compliance was achieved May 25, 1979 Yo rs very

uly, J

j L C Dail LCD/sc cc:

R L Dick D G Beam D B D'ackmon W H 'sasin