%.A 4
- ((
"[3 7 4 - c9 7- 03 4 DUIm POWER CO MPANY ELzcTate CENTEn. Box 33149. On otr.orrr.. N. C.
2a242 a
ct en ne n n ue
=
- s
=
cc c-July 20,1979 ca Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Comission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re:
Catawba Nuclear Station 10 CFR 50.55 (e) Report No. SD/413-414/79-1 Control Board Welds Duke Files: CN-1412.ll-1
Dear Mr. O'Reilly:
On June 21, 1979, Bob McFarland of your office was informed by T. C. McMeekin and J. R. Wells via telephone of the above topic.
Enclosed is our response concerning this subject.
Very truly yours,
/ /t L.' C' Dail, Vice-President Design Engineering EKM/ cam got9 5/I 649 314 790814c,cy 7d45 mu cun
Correct:ve Action:
All of the deficient welds on the main control boards were rewelded and inspected at the job site by a crew from the manufacturer. This was completed June 29, 1979 Inspection is continuing on eight miscellaneous control panels provided also by the same manufacturer and if any deficient welds are detected, they will be repaired by the manufacturer by November 1,1979 b4h j$'
.