ML19207B026
| ML19207B026 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 07/16/1979 |
| From: | Dail L DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 7908230230 | |
| Download: ML19207B026 (1) | |
Text
.
DUKE POWE'.CO31PANY u
P. O. B O I 33189 GE El F T'I( ' E S 37s.4o tsfRLET 42: Sout h i
'42 CII AIU.OTTE. W. C. 28'T 3 yn 19 n8:S July 16, 1979 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE Bulletin 79-09 Duke Files:
CN-1412.ll, EGS A-5.3
Dear lir. O'Reilly:
In response to your letter of April 17, 1979, which transmitted Nuclear Regulatory Comission IE Bulletin 79-09, we wish to advise that a review of the design of Catawba Nuclear Station has been conducted. This review revealed that no GE Type AK-2 circuit breakers are used or planned for use in safety-related systems at Catawba.
Very truly yours, l
{ W)
J l
/L. C. Dail, Vice President Design Engineering Department EKM/sr
' 7,,
L;
\\
J P
7908280 A 3O
'//###
P ommy cwv