Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000302/1978020 | 5 October 1978 | IE Inspec Rept 50-302/78-20 on 780810-11 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Included:Surveillance Activities,Testing & Safety Related Piping Support & Restraint Sys | Emergency Lighting |
IR 05000302/1978021 | 29 September 1978 | IE Inspec Rept 50-302/78-21 on 780814-18 During Which 1 Item of Noncompliance Was Noted:Failure to Follow Procedures Re Facil Cleanliness | Temporary Modification |
IR 05000302/1978022 | 13 October 1978 | IE Inspec Rept 50-302/78-22 on 780905-08 During Which 3 Items of Noncompliance Were Noted:Failure to Post High Radiat Area & Failure to Post Two Radiat Areas | Loop seal High Radiation Area |
IR 05000302/1978023 | 20 October 1978 | IE Inspec Rept 50-302/78-23 on 780830-0901 During Which 1 Item of Noncompliance Was Noted:Completion & Verification of Procedures During Review of Sys Realignments | |
IR 05000302/1978024 | 8 November 1978 | IE Inspec Rept 50-302/78-24 on 781002-06 During Which No Items of Noncompliance Were Noted.Major Areas Inspected Incl:Plant Oper,Followup on Previous Noncompliance Items & Unresolved Items | Fire Barrier Fire Protection Program Fire Watch Scaffolding |
IR 05000302/1978025 | 9 November 1978 | IE Inspec Rept 50-302/78-25 on 781016-19 During Which 1 Item of Noncompliance Was Noted:Failure to Implement Training & Retraining for Nuc Auxiliary Operators & Assistant Nuc Auxiliary Operators | |
IR 05000302/1978027 | 15 November 1978 | IE Inspec Rept 50-302/78-27 on 781018-19 During Which 2 Items of Noncompliance Were Noted:Response Procedures & Vehicle Control.Details Withheld from Pub Disclosure.Per 2.790 | |
IR 05000302/1978028 | 9 November 1978 | IE Inspec Rept 50-302/78-28 on 781011-13 During Which No Items of Noncompliance Were Noted.Major Areas Inspected incl:zero-pwr-physics Tests & Pwr Escalation Tests | |
IR 05000302/1981023 | 12 January 1982 | IE Insp Rept 50-302/81-23 on 811024-1202.Noncompliance Noted:Failure to Follow Procedures During Plant Operations, Failure to Follow Radiation Protection Procedures for Contamination Control & Failure to Calibr Instrumentation | |
IR 05000302/1982005 | 20 April 1982 | IE Insp Rept 50-302/82-05 on 820304-26.Noncompliance Noted:Failure to Adhere to Administrative Procedure During Plant Operation & Failure to Perform Type C Leak Rate Testing | Boric Acid Stroke time |
IR 05000302/1982006 | 7 April 1982 | IE Insp Rept 50-302/82-06 on 820316-19.Noncompliance Noted:Leak Test Performed on Pu-239 Calibr Source Counted on Instrument Accurate for Beta or Gamma Detection Only | High Radiation Area |
IR 05000302/1982009 | 17 May 1982 | IE Insp Rept 50-302/82-09 on 820327-0426.Noncompliance Noted:Failure to Receive Prior NRC Approval for Tech Spec Change & Failure to Review & Approve Seismic Monitoring Calibr Procedure Prior to Implementation | Temporary Modification |
IR 05000302/1982012 | 7 July 1982 | IE Insp Rept 50-302/82-12 on 820616-18.No Noncompliance Noted.Major Areas Inspected:Action on Previous Insps, Followup on IE Bulletin 80-11,quality Records for Reactor Bldg Tendon & Bldg Dome Surveillance Programs | |
IR 05000302/1982013 | 23 July 1982 | IE Insp Rept 50-302/82-13 on 820628-0702.No Noncompliance Noted.Major Areas Inspected:Followup on Previous Emergency Preparedness Findings | Earthquake |
IR 05000302/1982014 | 24 June 1982 | IE Insp Rept 50-302/82-14 on 820607-11.No Noncompliance Noted.Major Areas Inspected:Followup on Previously Identified Matters,Training,Air Sampling,Whole Body Counting & Plant Tour | |
IR 05000302/1984023 | 2 January 1985 | Safeguards Insp Rept 50-302/84-23 on 840812-16.Violations Noted:Failure to Implement & Fully Maintain Provisions of Approved Physical Security Plan Re Protection of Vital Equipment.Details Withheld (Ref 10CFR73.21) | |
IR 05000302/1984024 | 20 June 1985 | Insp Rept 50-302/84-24 on 850528-31.No Violations Noted. Major Areas Inspected:Audit,Physical Barriers,Illumination & Assessment Aids & Independent Insp Activity.Details Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000302/1985001 | 25 April 1985 | Insp Rept 50-302/85-01 on 850114-18.Violations Noted:Failure to Take Adequate Corrective Action to Prevent Recurrence of Violations as Required by 10CFR50,App B,Criterion Xvi & to Implement Requalification Program | License Renewal Backfit |
IR 05000302/1985003 | 30 May 1985 | App to SALP Rept 50-302/85-03 for 850312,consisting of Meeting Summary & List of Attendees | Systematic Assessment of Licensee Performance |
IR 05000302/1985009 | 3 June 1985 | Insp Rept 50-302/85-09 on 850304-08.Open Items Noted: Deficient Qualification Documentation Files & Incomplete Procedure Preparations or Revs to Program for Preserving Qualified Status of Equipment Through Maint & Surveillance | |
IR 05000302/1985010 | 29 March 1985 | Insp Rept 50-302/85-10 on 850311-15.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry & Inservice Testing of Pumps & Valves | Stress corrosion cracking |
IR 05000302/1985016 | 10 April 1985 | Insp Rept 50-302/85-16 on 850325-28.Violation Noted:Pipe Support Installation Dimension Did Not Conform W/Applicable Approved Engineering Drawings | Scaffolding |
IR 05000302/1985017 | 28 May 1985 | Insp Rept 50-302/85-17 on 850402-05 & 15-19.Violation Noted: Control of Field Welding Not Clearly Defined | Liquid penetrant |
IR 05000302/1985025 | 17 June 1985 | Insp Rept 50-302/85-25 on 850520-24.No Violation or Deviation Noted.Major Areas Inspected:Maint Programs | |
IR 05000302/1985028 | 8 July 1985 | Insp Rept 50-302/85-28 on 850618-20.No Violations or Deviations Identified.Major Areas Inspected:Pipe Support Baseplate Designs Using Concrete Expansion Anchors Per IE Bulletin 79-02 | |
IR 05000302/1985029 | 13 August 1985 | Insp Rept 50-302/85-29 on 850626-0726.Violation Noted: Failure to Adhere to Offsite Dose Calculation Manual & Failure to Perform Functional Test of Source Range Nuclear Instrument | Reactor Vessel Water Level Offsite Dose Calculation Manual Fire Barrier Hydrostatic |
IR 05000302/1985030 | 20 September 1985 | Insp Rept 50-302/85-30 on 850729-0802.No Violation or Deviation Noted.Major Areas Inspected:Fire Protection & Licensee Action Re Implementation of Requirements of 10CFR50,App R,Sections Iii.G,Iii.J,Iii.L. & Iii.O | Safe Shutdown Fire Barrier Emergency Lighting Exemption Request Fire Protection Program Fire Watch Scaffolding |
IR 05000302/1985031 | 9 September 1985 | Insp Rept 50-302/85-31 on 850812-16.No Violation or Deviation Noted.Major Areas Inspected:Action on Previous Enforcement Matters & Inservice Insp Data,Including Hydrostatic Test Results | Hydrostatic Nondestructive Examination |
IR 05000302/1985032 | 6 September 1985 | Insp Rept 50-302/85-32 on 850808-21.No Violation or Deviation Noted.Major Areas Inspected:Review & Witnessing pre- & post-criticality Tests Following Refueling Outage | Shutdown Margin |
IR 05000302/1985036 | 26 September 1985 | Insp Rept 50-302/85-36 on 850823.No Violation or Deviation Noted.Major Areas Inspected:Emergency Preparedness,Emergency Response Facilities,Nrc Response Team Coordination & NRC Hurricane Response Procedures | |
IR 05000302/1985037 | 29 October 1985 | Insp Rept 50-302/85-37 on 850817-0925.No Violation or Deviation Noted.Major Areas Inspected:Plant Operations, Security,Radiological Controls,Lers & Nonconforming Operations Repts & Plant Startup from Mods | Packing leak Fire Barrier Overspeed trip |
IR 05000302/1985038 | 26 September 1985 | Insp Rept 50-302/85-38 on 850826-30.No Violation or Deviation Noted.Major Areas Inspected:Licensee Commitment in Tracking of Regulatory Requirements | Emergency Lighting |
IR 05000302/1985039 | 23 September 1985 | Insp Rept 50-302/85-39 on 850910-13.No Violation or Deviation Noted.Major Areas inspected:post-criticality Tests Performed Following Refueling Outage | |
IR 05000302/1985040 | 22 October 1985 | Insp Rept 50-302/85-40 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Qa/Qc Administration, Procurement & Receipt,Storage & Handling | |
IR 05000302/1985043 | 23 January 1986 | Insp Rept 50-302/85-43 on 851209-13.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on Previous Enforcement Matters,Design Control & Tests & Experiments | Temporary Modification |
IR 05000302/1985044 | 11 February 1986 | Insp Rept 50-302/85-44 on 851126-860117.Violations Noted: Failure to Make 1 H Rept to NRC Operations Ctr Per 10CFR50.72 & Failure to Adhere to Requirements of Radiation Work Permit | Fire Barrier Hydrostatic |
IR 05000302/1985045 | 8 January 1986 | Security Insp Rept 50-302/85-45 on 851209-13.No Violations or Deviations Noted.Major Areas Inspected:Barriers,Alarms, Communication & Contingencies,Lighting,Assessment & Stations.Details Withheld (Ref 10CFR2.790(d) & 10CFR73.21) | |
IR 05000302/1986002 | 12 February 1986 | Partially Withheld Insp Rept 50-302/86-02 on 860102-03. Violation Noted:Failure to Fully Implement Physical Security Plan Re Insp & Maint of Vital Area Barriers.Details Withheld (Ref 10CFR2.790(d) & 73.21) | |
IR 05000302/1986003 | 12 February 1986 | Insp Rept 50-302/86-03 on 860106-10 & 14-16.No Violations or Deviations Noted.Major Areas Inspected:Review & Evaluation of Inservice Insp Data & Licensee Actions Re Reactor Coolant Pump 1A Shaft Failure | |
IR 05000302/1986008 | 25 February 1986 | Insp Rept 50-302/86-08 on 860129-31.No Violation or Deviation Noted.Major Areas Inspected:Reactor Coolant Pump 1A Shaft Failure & Ultrasonic Exam & Pressurizer Code Safety Relief Valve Discharge Flange Misalignment | |
IR 05000302/1986010 | 2 April 1986 | Insp Rept 50-302/86-10 on 860303-07.Violation Noted:Failure to Provide Adequate Assessment Capability for Protected Area Perimeter.Details Withheld (Ref 10CFR2.790 & 73.21) | |
IR 05000302/1986013 | 19 June 1986 | SALP Rept 50-302/86-13 for Nov 1984 - Mar 1986 | Safe Shutdown High Radiation Area Grab sample Fire Barrier Hydrostatic Nondestructive Examination Emergency Lighting Locked High Radiation Area Systematic Assessment of Licensee Performance Exemption Request Fire Protection Program Scaffolding Backfit |
IR 05000302/1986016 | 6 June 1986 | Insp Rept 50-302/86-16 on 860519-23.No Violation or Deviation Noted.Major Areas Inspected:Radwaste Processing, Effluent Releases & Environ Monitoring | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
IR 05000302/1986017 | 24 June 1986 | Insp Rept 50-302/86-17 on 860519-23.No Violations or Deviations Noted.Major Areas Inspected:Licensee Actions on Previous Enforcement Matters & Insp Findings & QA Effectiveness | Overspeed trip |
IR 05000302/1986018 | 18 July 1986 | Insp Rept 50-302/86-18 on 860617-20.No Violation or Deviation Noted.Major Areas Inspected:Annual Radiological Emergency Preparedness Exercise | Siren |
IR 05000302/1986020 | 2 September 1986 | Insp Rept 50-302/86-20 on 860607-0703.Violation Noted: Failure to Adhere to Plant Procedures | Packing leak Fire Barrier Scaffolding |
IR 05000302/1986023 | 2 September 1986 | Insp Rept 50-302/86-23 on 860704-0801.Violations & Deviation Noted:Failure to Have Adequate Instructions for Performance of Mods to Properly Install Spent Fuel Pool Missile Shields & to Properly Document Mod | High winds High Radiation Area Fire Barrier Hydrostatic Temporary Modification Tornado Generated Missile |
IR 05000302/1986024 | 31 July 1986 | Partially Withheld Physical Security Insp Rept 50-302/86-24 on 860714-18 (Ref 10CFR2.790(d) & 73.21).No Noncompliance Noted.Major Areas Inspected:Plan/Procedures,Security Mgt, Audit,Barriers & Access Controls | |
IR 05000302/1986026 | 20 August 1986 | Insp Rept 50-302/86-26 on 860721-25.Violations Noted:Failure of Individual to Possess Radiation Monitoring Device While in High Radiation Area & Failures to Perform Adequate Alpha Radiation Evaluation & Brace Radioactive Matl Shipment | High Radiation Area Exclusive Use |
IR 05000302/1986028 | 17 September 1986 | Insp Rept 50-302/86-28 on 860819-25.No Violations or Deviations Noted.Major Areas Inspected:May 1986 Lost Ion Exchange Resin Event | High Radiation Area Offsite Dose Calculation Manual |