IR 05000302/1984023
| ML20128Q389 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 01/02/1985 |
| From: | Mcguire D, Moore D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20128Q383 | List: |
| References | |
| 50-302-84-23, EA-84-104, NUDOCS 8507260672 | |
| Download: ML20128Q389 (1) | |
Text
,
-
SAFEGllAPJSAFORMATION
--
=...
..g#o NUCLEAR REGULATORY COMMISSION g.
[
o REGION ll
$
101 M ARIETTA STREET, N.W.
- ATLANTA, GEORGIA 30303 o,
.... * *#
JAN 01985 Report No. 50-302/84-23 Licensee: Florida Power Corporation P. O. Box 14042 St. Petersburg, FL 33733 Docket No. 50-302 License No. DPR-72 Facility Name: Crystal River 3 Intpection Date:
August 12-16, 1984 Inspect
$9t,C lln)fS
.-
D..E N oore, P
'ical Security Inspector Dhts Signed i
Approved'by:
D V
/2 D. R. McGuire, Chief, Physical Security Section Dat4 S'igned
-
,
Nuclear Materials Safety and Safeguards Branch
,
Division of Radiation Safety and Safeguards SUMMARY Scope:. This ' routine unannounced inspection entailed 32 inspector-hours on site.(6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> on.>backshift)
inspecting:
security organization personnel / response; testing and maintenance; physical barriers-vital areas; security system power supply; access control personnel / packages / vehicles; detection aids-vital areas; and independent inspection effort.
Additionally, 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> were devoted to allegation followup concerning another NRC licensed facility.
Results:
Two violations of regulatory requirements were identified:
Failure to implement and fully maintain provisions of the approved physical security plan concerning the protection of vital equipment.
Inadequate vital area physical barrier.
-
o
%
"