 Issue dateTitleTopic
IR 05000395/200500710 March 2005Final Significance Determination for a Green Finding (NRC IR 05000395/2005007 Virgil C. Summer Nuclear Station)Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
IR 05000395/200750230 July 2007Summary of Public Meeting - Virgil C. Summer Nuclear Station, to Discuss Significance on Apparent Violation Documented in Inspection Report 50-395-07-502Enforcement Discretion
IR 05000424/200900230 April 2009IR 05000424-09-002 & 05000425-09-002 on 01/01/2009 - 03/31/2009 for Vogtle, Units 1 & 2Temporary Modification
Open House
Fire Protection Program
ML02052068717 January 2002Meeting Handouts for Meeting Held on 01/27/02 to Discuss RCS Piping Inspection Plans for Their Next Refueling OutageFinite Element Analysis
ML0211402258 April 2002Refuel 13, April 8, 2002 Pre-Outage PresentationBoric Acid
Aging Management
ML02246009530 August 2002South Carolina Electric & Gas Co., V. C. Summer Nuclear Station Slides
ML02329018420 November 2002Slides for 11/4/2002 Lrsc MeetingAging Management
ML03098059031 March 2003Annual Assessment Meeting for Virgil C. Summer Nuclear Station. NRC Presentation Slides
ML0328101376 October 2003Presentation Slides for Post-Refueling Outage Meeting
ML03307028326 August 2003Preliminary Results of Environmental Review Virgil C. Summer Nuclear Station, Nuclear Regulatory Commission, August 26, 2003Environmental Justice
ML0400802848 January 2004Slides from V.C. Summer Nuclear Station Reactor Vessel RF-14 ISIDissimilar Metal Weld
ML04035021213 August 2003DRS Open Items StatusSafe Shutdown
Boric Acid
Fire Barrier
Hemyc
Pressure Boundary Leakage
ML0403506875 August 2003DRS Open Item StatusSafe Shutdown
Boric Acid
Fire Barrier
Hemyc
ML04035069127 August 2003DRS Open Items StatusSafe Shutdown
Boric Acid
Fire Barrier
Hemyc
Pressure Boundary Leakage
ML0409800261 April 2004Annual Assessment Meeting, Reactor Oversight Process - CY2003
ML04105015624 March 2004V.C. Summer Nuclear Station Annual Assessment Meeting, Reactor Oversight Process - CY2003
ML05097047531 March 2005Presentation Slides for 03/31/05 Meeting with NRC - Corrective Action ProgramProbabilistic Risk Assessment
ML05097047631 March 2005Presentation Slides for 03/31/05 Meeting with NRC - RF-15 Outage InformationBoric Acid
Pressure Boundary Leakage
ML05103020823 March 2005NRC Cy 2004 Annual Assessment Meeting, V. C. Summer, 03/23/2005
ML05115011912 April 2005Annual Assessment Meeting Cy 2004, Vogtle Electric Generating Plant - NRC, Region II, Waynesboro, Ga, April 12, 2005
ML06003043530 December 2005Rii Presentation Revised - RF-15 Outage InformationBoric Acid
Coatings
Pressure Boundary Leakage
ML06017063817 January 2006Pjm Slides, Voltage Control for Nuclear Power Plants in Pjm
ML06094055320 March 2006Meeting Summary - Enclosure 2. Handouts for Meeting with South Carolina Electric & Gas Company Re Results of Root Cause Evaluation for the High Failure Rate on the January 10, 2006, Operator Licensing Initial Written Examination
ML06097029831 March 2006NRC Cy 2005 Annual Assessment Meeting, Virgil C. Summer Nuclear StationB.5.b Mitigating Strategies
ML06102006229 March 2006Annual Assessment Meeting Attendance List & Slides
ML06151060123 May 2006EPRI HRA Users Group Review of Draft NUREG-1842
ML0615204101 June 2006Meeting Slides, Bop/Fp/Hvac System Health ReportsThrough-Wall Leak
ML06152041223 May 2006Meeting Slides, Vogtle Unit 2, RHR Bypass Line Leaks
ML06152041523 May 2006Meeting Slides Meeting with NRCPower change
ML06180026318 September 2006Crack Growth Rates in a PWR Environment of Nickel-Base Alloys from Davis-Besse and V. C. Summer Plants
ML06192033014 April 2006Attachment 2 - SNC Slides for April 14, 2006 Public Meeting to Discuss Vogtle Early Site Permit Seismic ActivitiesEarthquake
ML06276024527 September 2006V. C. Summer Nuclear Station RF-16 Outage Information
ML0706703231 March 2007(Westinghouse AP1000)
ML0706703331 March 2007AP1000 Seismic Assessment Status
ML07072022622 June 2006Sce&G VC Summer Site - Site Characterization Visit (Handouts)
ML0713500662 May 2007Meeting Handout on RF16 Outage Review V.C. Summer
ML0713500972 May 2007Meeting Handout on Alternate Safety Power Source - Summer
ML0713501022 May 2007Meeting Handout on RB Tendon/Iwe/Iwl Inspection
ML0713501062 May 2007Meeting Handout on CRDM Canopy Seal Clamp Installation
ML0713501092 May 2007Meeting Handout on Summary of HP Performance During RF16
ML07141038817 May 2007Enclosure 2 - 05/17/2007 Meeting Slides for Vogtle Electric Generating PlantWeld Overlay
ML07158062831 May 2007Enclosure 8 - OBE Exceedance IssuesEarthquake
ML07170045230 May 2007Meeting Slides/Handouts, Transmission Planning for New Generation at Plant Vogtle Site.
ML07170046631 May 200705/2007 Generation Planning Overview.
ML07234001222 August 2007Public Outreach Meeting South Carolina E&G Summer Nuclear Power Plant Combined License ApplicationEnvironmental Justice
ML07298067024 October 2007Meeting Presentation on GEH Chemical Effects Testing Update
ML08059031219 February 200802/19-02/21/2008 Nrc/Doe Workshop Presentation: 80 Is the New 60! Lessons from the Past - PierceAging Management
ML08114055323 April 2008V. C. Summer Nuclear Station, Slides - Refuel 17 PlansB.5.b Mitigating Strategies
ML08119019624 April 2008Voglte End of Cycle Public Meeting Assessment Slides
ML0816105633 June 200806/03/2008 Meeting Hand-outs,Preliminary Results of the Vogtle Electric Generating Plant, Units 1 & 2 License Renewal Environmental Review, Draft SEIS Public Meeting