MONTHYEARML24164A2942024-06-17017 June 2024 Licensee Slides for Pre-submittal Meeting for VEGP Units 3 and 4 for a Proposed License Amendment Request Regarding TS 3.3.8 ML24158A3832024-06-0606 June 2024 SNC Slides - Vogtle 3 and 4 - TS 3-8-2 - Pre-Submittal Meeting - 06-27-2024 ML24120A2202024-04-30030 April 2024 Annual Assessment Meeting Presentation Slides - April 30, 2024 ML24089A1492024-04-0404 April 2024 Slides - SNC Presentation - Pre-Submittal Meeting on April 4, 2024 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR ML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22332A5372022-11-28028 November 2022 Draft LAR 23-001 for 12-8-22 Public Meeting ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21193A0762021-07-0808 July 2021 ITAAC Related to Incore Instrument Thimble Assembly (Iita) ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process ML21172A1312021-07-0101 July 2021 Pre-Submittal Meeting Alternate Source Term and TSTF-490 ML21193A0772021-06-24024 June 2021 Exemption from Operator Written Examination and Operating Test for Unit 4 Licenses, 6-24-21 Pre-submittal Meeting ML21085A4902021-05-19019 May 2021 Risk-informed Resolution of Generic Letter 2004-02 ML21064A3652021-03-0101 March 2021 Dashboard Report 3-1-2021 ML21027A2062021-02-28028 February 2021 Fixed 8-Hour Emergency Light Deviation Pre-Submittal Meeting, February 2021 (Slides) ML21057A0182021-02-26026 February 2021 Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides) ML21036A1172021-02-0505 February 2021 SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR ML20343A0742020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20314A0962020-11-0202 November 2020 Dashboard Report 11/02/2020 ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20136A2832020-05-15015 May 2020 4 EOC Slides ML20114E3032020-04-23023 April 2020 Risk-Informed GL 2004--02 Pre-Submittal NRC Meeting - May 2020 ML20007D6772020-01-0808 January 2020 AP1000 Public Presentation Entitled Reactor Oversight Process (ROP) for Inspecting Vogtle Site with AP1000 Design ML19303A0252019-11-0404 November 2019 Risk-Informed GSI-191 NRC Public Meeting ML19295D4672019-10-30030 October 2019 Public Meeting for ITAAC Hearing Process, October 30, 2019 2024-06-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24164A2942024-06-17017 June 2024 Licensee Slides for Pre-submittal Meeting for VEGP Units 3 and 4 for a Proposed License Amendment Request Regarding TS 3.3.8 ML24158A3832024-06-0606 June 2024 SNC Slides - Vogtle 3 and 4 - TS 3-8-2 - Pre-Submittal Meeting - 06-27-2024 ML24120A2202024-04-30030 April 2024 Annual Assessment Meeting Presentation Slides - April 30, 2024 ML24089A1492024-04-0404 April 2024 Slides - SNC Presentation - Pre-Submittal Meeting on April 4, 2024 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR ML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23304A2682023-11-0707 November 2023 License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023 ML23311A2452023-11-0707 November 2023 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) ML23293A0052023-10-20020 October 2023 Lessons Learned from the ITAAC Hearing Process for Vogtle 3 and 4 ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23072A1802023-03-13013 March 2023 2023 RIC Powerpoint Slide Presentation, Vogtle 3: Journey from Construction to Operations ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22335A5542022-12-0101 December 2022 Slides - SNC Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request - ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22206A1712022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22206A1682022-07-25025 July 2022 Dashboard Report 7-25-2022 ML22201A0442022-07-20020 July 2022 Voices Dashboard Report for Vogtle Unit 3 as of July 20, 2022 ML22144A0492022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22144A0502022-05-24024 May 2022 Dashboard Report 5-24-2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22126A0012022-05-0606 May 2022 SNC Slides - Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemptions ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22060A0062022-02-28028 February 2022 4Q 2021 Performance Summary U3 ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML22026A0582022-01-26026 January 2022 Dashboard Report 1-26-2022 ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21197A0032021-08-0606 August 2021 Slides - SNC Slides - Pre-Submittal Meeting on August 13, 2021 - Vogtle TS 3.3.1 and 3.3.2 LAR ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process ML21193A0762021-07-0808 July 2021 ITAAC Related to Incore Instrument Thimble Assembly (Iita) ML21188A3592021-07-0606 July 2021 1Q 2021 Performance Summary U3 ML21188A3612021-07-0606 July 2021 1Q 2021 Performance Summary U4 2024-06-06
[Table view] |
Text
BOP/FP/HVAC System Health Reports System Health Reports Document what is currently significant and what will be significantly challenging in the next 5 to 10 years.
Doug Tamplin 4th quarter 2005
- ASSISTANCE: Request help when moving heavy loads.
U1 04/17/2006 MANUAL TRIP AFTER MFRV #3 WOULD NOT CONTROL.
U2 02/01/2006 EHC LEAK REPAIR.
U1 10/17/2005 MANUAL TRIP AFTER MFRV # 2 SPURIOUSLY CLOSED U2 05/23/2005 EXTRACTION STEAM PIPING; BELLOWS RUPTURE TO 3C FWH U1 01/11/2005 UNPLANNED SHUTDOWN GENERATOR PT CONNECTION U2 11/22/2004 POWER ASCENSION STOPPED 65% DUE TO MFP TURB 2A U2 07/30/2004 HEATER DRAIN PUMPS; PLANNED DERATE FOR HDP 2A U1 03/26/2004 OUTAGE TO REPAIR GEN VOLT CONTL INVERTOR.
U2 01/31/2004 OUTAGW TO REPAIR H2 LEAK DUE TO FAULTY
1404 TPCCW WHITE GREEN
- Resolve the microbiological infestation for unit 1
1402 River Water WHITE
- Complete packing rework on knife gate valves.
- Refurbished traveling screen # 2 & 3 one per year per current plan.
- Pin hole leaks discovered in the river intake to blowdown sump 12 inch piping.
- RER A054393001 Corporate Engineering to develop a contingency plan to limit plant susceptibility to the buried river water make-up lines that run from the river intake to the NSCW towers, the Natural Draft Cooling Towers, and cooling tower blowdown sump.
1305 Condensate / Feedwater RED WHITE
- Unit 1 RX trip and LER on MFRVs 10/17/05
- Unit 2 2B condensate pump motor trip on 12/14/05
- Problematic BFIV air pump.
- Unit 2 loop 4 MFRV cycling and resulting SG #4 level swings of 4%
1304 Feedwater Heater and MSR Drain WHITE
- 1B HDP developed a leak at the stuffing box extension
- 6A vent line to condenser has a leak at the 90 degree elbow due flow accelerate corrosion.
- The RHDT valves have a history of sticking due to the build up of magnetite between the plug and the cage.
1615 EHC control system WHITE RED
- Unit 2 RED due to forced outage EHC leak
- WHITE due to the age and obsolescence of the EHC electronic control system components on both units. DCP scheduled
- Electrostatic filtration equipment has been out of service since November 2004 due to a leak and was removed and stored on the mezzanine in the maintenance shop.
1301 Main Steam WHITE
- DCPs for MSIV and Steam Dump actuators to be installed
- ARV reliability Implement MDC to improve oil quality.
1303 Extraction Steam WHITE
- White due to cycling of extraction steam valves cycling. MDC to replace instrumentation and GE is reviewing turbine for explanation of excessive moisture.
- Unit 1 bellows require replacement.
1317 Steam Seals WHITE
- Steam steal pressure control solution is being investigated.
- Problems swapping steam packing exhauster cause is still unknown.
1326 Stator Cooling WHITE
- Main Generator Rewind is projected for 2010 and is subject to change based upon the number of stator bar leaks found .
- Resin has to be replaced mid-cycle challenging unit operation.
1414 Condensate Demin WHITE
- Flange leaks due to operating 2 condensate pumps at low power.
Operations has action to revise procedures.
- Control system problems. DCP to upgrade to a digital system.
1306 Feedpump Turbine Drive GREEN
- 1A MFPT Trip Mechanism Test MDC to install a new hand switch.
- The feedpump turbines have a long history of oil leakage from the outboard bearing housing. RER to corporate to resolve.
1301 Main Turbine WHITE
- Replacement of High Pressure Turbine:
- A noise was discovered coming from the Unit 2 LP Turbine "C" hood. Remove Gen end, awaiting recommendation from GE.
- Expansion Joints on LP turbine inlet piping: 6 per unit $100,000 per joint. GE Business Team meeting on 01/2002 recommended no action at this time.
1302 Auxiliary Feedwater GREEN
- The TDAFW monitoring computer failed on both units during 2004
- The spare MDAFW pump rotating element is not suitable for use in its present condition. (Fall 2000)
- Failures of the starter auxiliary contacts, which has occurred on motor operated valves
- U1 CST degassifier O2 in-leakage.
- TPCW is the seal water source on unit 2
1401 Circulating Water WHITE
- Need to obtain spare Circ water pump motor.
- Discharge expansion joints at all circulating water pumps have degraded and require replacement during next outage.
- Remove the old Cooling Tower Lighting system and upgrade per DCP. A rescue plan is required for this work.
- Corporate RER 1060182901 was generated to establish a long range plan to assess the current performance of both cooling towers and provide recommendations to improve performance.
- System engineer reviewing reliability of pump discharge MOVs to determine if valves need to be reoriented.
1813 Fire Detection System YELLOW
- The fire detection system remains yellow due to continued nuisance alarms on the fire alarm system. This condition has resulted in reduced operator sensitivity to actual alarms.
- Equipment obsolescence remains an issue.
- Admin Support Building unsat.
- DAW Facility detection system
2301 Fire Protection System YELLOW
- Underground leaks, model A-4 Multimatic valve obsolescence, north and south fire water tanks level inconsistency.
- #13 on the Major Issues List.
- Two jockey pumps are being run.
- Excessive pressures have been noted on wet pipe sprinkler systems (MDC 02-VAM041)
1501 Contain Building Cooling WHITE
- Containment Building Air Cooling System is currently classified as WHITE. The system will not be returned to GREEN until all degraded cooling coils are replaced.
- SNC Component Engineering is developing the Long Range Plan to replace all of the coils on the Containment ESF and AUX coolers.
1535 Fume Hood Exhaust Fan WHITE
- The system continues to meet the white classification due to vibration issues noted since the 4th Quarter of 2002 associated with A-1535-N7-001-000. Recently obtained cost estimate preparing DCR to replace fan.
1551 Aux Building Supply WHITE
- The Auxiliary Building Supply and Normal HVAC for both units are white due to the material condition. The classification is largely based on the need to perform a complete overhaul on the U1 #2 and U2 #
2 supply units.
1591 Normal Chilled Water YELLOW
- Due to repeat failures of obsolete Telemecanique Class J control relays in the Normal Chiller control panels. RER received for a cost estimate to replace the control system preparing a DCR
1553 Aux Building Normal Exhaust.
GREEN
- All three of the unit 2 carbon beds will require replacement in the next 5 years.
This is intensive manpower and large quantity of charcoal to purchase (~30,000 lbs/bed), the Unit 2 carbon beds are likely to be the biggest system health issue in the next 5 years.
1531 Control Room HVAC GREEN
- Initial tracer gas testing to measure unfiltered in-leakage for the Main Control Room was completed in December 2003.
Corporate Licensing currently has the action to update UFSAR and Tech Specifications. Corporate is waiting for NRC guidance.
1532 Control Building ESF HVAC 1539 Control Building Cable Spreading Room HVAC GREEN
- The material condition is average.
Engineering continues monitor degradation of aging air handler cooling units.
1561 Piping Penetration System White GREEN
- Unit 1 white due to relay failure and TS entry. This has been corrected and should return to green next quarter.
- Complete flow balance activities for Unit 1.
The current schedule is to complete activities by 6/1/06.
1531 Control Room HVAC GREEN
- Initial tracer gas testing to measure unfiltered in-leakage for the Main Control Room was completed in December 2003.
Corporate Licensing currently has the action to update UFSAR and Tech Specifications. Corporate is waiting for NRC guidance.
1532 Control Building ESF HVAC 1539 Control Building Cable Spreading Room HVAC GREEN
- The material condition is average.
Engineering continues monitor degradation of aging air handler cooling units.
1561 Piping Penetration System White GREEN
- Unit 1 white due to relay failure and TS entry. This has been corrected and should return to green next quarter.
- Complete flow balance activities for Unit 1.
The current schedule is to complete activities by 6/1/06.