V.C. Summer Nuclear Station Annual Assessment Meeting, Reactor Oversight Process - CY2003
ML041050156
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/24/2004
From:
NRC/RGN-II
To:
References
Download: ML041050156 (18)


Text

V. C. Summer Nuclear Station V. C. Summer Nuclear Station Annual Assessment Meeting Annual Assessment Meeting Reactor Oversight Process - CY 2003 Reactor Oversight Process - CY 2003 Nuclear Regulatory Commission - Region II Nuclear Regulatory Commission - Region II Jenkinsville Jenkinsville, South Carolina

, South Carolina March 24, 2004 March 24, 2004

Purpose of Todays Meeting

 A public forum for discussion of the licensees performance

 NRC will address the licensee performance issues identified in the annual assessment letter

 Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda

 Introduction

 Review of Reactor Oversight Process

 National Summary of Plant Performance

 Discussion of Plant Performance Results

 Licensee Response and Remarks

 NRC Closing Remarks

 Break

 NRC available to address public questions

Region II Organization Luis Reyes Regional Administrator Loren Plisco Deputy Regional Administrator Victor McCree Director Division of Reactor Projects Len Wert Deputy Director Charles Casto Director Division of Reactor Safety Harold Christensen Deputy Director Kerry Landis Branch Chief V. C. Summer Resident Inspectors James Reece {Acting SRI}

Mark King Project Engineers Binoy Desai Larry Garner

NRC Performance Goals

 Maintain safety and protect the environment

 Enhance public confidence

 Improve effectiveness, efficiency, and realism of processes and decision making

 Reduce unnecessary regulatory burden

Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

Examples of Baseline Inspections

 Equipment Alignment

~92 hrs/yr

 Triennial Fire Protection

~200 hrs every 3 yrs

 Operator Response

~125 hrs/yr

 Emergency Preparedness

~80 hrs/yr

 Rad Release Controls

~100 hrs every 2 yrs

 Worker Radiation Protection ~100 hrs/yr

 Corrective Action Program

~200 hrs every 2 yrs

 Corrective Action Case Reviews ~60 hrs/yr

Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety significance White:

Low to moderate safety significance Yellow:

Substantial safety significance Red:

High safety significance

National Summary

 Performance Indicator Results (at end of CY 2003)

Green 1825 White 15 Yellow 0

Red 0

 Total Inspection Findings (at the end of CY 2003)

Green 748 White 19 Yellow 2

Red 4

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2003 Licensee Response 75 Regulatory Response 22 Degraded Cornerstone 2

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 102*

V. C. Summer Nuclear Station Inspection Activities (Jan 1 - Dec 31, 2003)

 3100 hours0.0359 days <br />0.861 hours <br />0.00513 weeks <br />0.00118 months <br /> of inspection related activities

 Engineering inspections (Heat Sink, Modifications)

 Emergency preparedness inspection

 Initial and Requalification exam inspection

 Fire protection followup inspection

 Radiation protection inspections

 License Renewal inspections

 Reactor pressure vessel lower head inspection

 Refueling outage inspections

V. C. Summer Nuclear Station Assessment Results (Jan 1 - Dec 31, 2003)

(Jan 1 - Dec 31, 2003)

Plant performance was within the Licensee Response Column of the NRCs Action Matrix

All inspection finding were classified as very low safety significance (Green)

All PIs were Green

V. C. Summer Nuclear Station Annual Assessment Summary January 1 - December 31, 2003

 South Carolina Gas & Electric (SCANA) operated V. C. Summer Nuclear Station in a manner that preserved public health and safety

 All cornerstone objectives were met

 NRC plans baseline inspections at V.C. Summer for calendar year 2004 assessment period

V. C. Summer Nuclear Station CY 2004 Inspection Activities

 Triennial Fire Protection inspection

 Spent fuel material control and accountability inspection

 Emergency preparedness inspection

 Problem Identification and Resolution (PI&R) inspection

 Safety System Design and Performance Capability (SSDPC) inspection

Licensee Response and Remarks Mr. Stephen Byrne Senior Vice President, V. C. Summer Nuclear Station SCANA

Contacting the NRC

 Report an emergency (301) 816-5100 (call collect)

 Report a safety concern:

(800) 695-7403 Allegation@nrc.gov

 General information or questions www.nrc.gov Select What We Do for Public Affairs

Reference Sources

 Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room http://www.nrc.gov/reading-rm.html

 Public Document Room 1-800-397-4209 (Toll Free)