Vogtle Electric Generating Plant Annual Assessment Meeting Reactor Oversight Program - CY 2007 Nuclear Regulatory Commission - Region II Waynesboro, GA April 24, 2008

Purpose of Todays Meeting A public forum for discussion of the licensees performance NRC will address the licensee performance issues identified in the annual assessment letter Licensee will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance

Agenda Introduction Review of Reactor Oversight Process National Summary of Plant Performance Discussion of Plant Performance Results Licensee Response and Remarks NRC Closing Remarks Break NRC available to address public questions

Region II Organization Victor McCree Acting Regional Administrator Charles Casto Acting Deputy Regional Administrator Division of Reactor Projects Division of Reactor Safety Joseph Shea, Acting Director Kriss Kennedy, Director Harold Christensen, Deputy Director David Ayres, Acting Deputy Director Projects Branch 2 Scott Shaeffer, Chief Regional Specialist Inspectors (404)562-4521 Resident Inspectors (RI)

Project Engineers (PE)

Gerald McCoy, Senior RI Curt Rapp, Senior PE Tim Chandler, RI Tonya Lighty, PE RI Office: (706)554-9901

NRC Strategic Goals Safety: Ensure adequate protection of public health and safety and the environment Security: Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Performance Indicator Results Results Results Significance Significance Significance Threshold Threshold Threshold Action Matrix Action Matrix Regulatory Response

Examples of Baseline Inspections Equipment Alignment ~80 hrs/yr Fire Protection ~200 hrs Triennially Operator Response ~125 hrs/yr Emergency Preparedness ~80 hrs/yr Rad Release Controls ~110 hrs Biennially Worker Radiation Protection ~90 hrs/yr Corrective Action Program ~250 hrs Biennially Corrective Action Case Reviews ~60 hrs/yr

Performance Thresholds Performance Indicators Green: Only Baseline Inspection White: May increase NRC oversight Yellow: Requires more NRC oversight Red: Requires more NRC oversight Inspection Findings Green: Very Low safety significance White: Low to Moderate safety significance Yellow: Substantial safety significance Red: High safety significance

Action Matrix Concept Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

National Summary of Plant Performance Status at End of CY 2007 Licensee Response 87 Regulatory Response 8 Degraded Cornerstone 8 Multiple/Repetitive Degraded Cornerstone 1 Unacceptable 0 Total 104*

  • Includes Browns Ferry Unit 1 which was restarted in 2007

National Summary Performance Indicator Results (end of CY 2007)

  • Green 1942
  • White 8
  • Yellow 2
  • Red 0 Total Inspection Findings (CY 2007)
  • Green 759
  • White 9
  • Yellow 5
  • Red 0

2007 Inspection Activities 6200 hours0.0718 days <br />1.722 hours <br />0.0103 weeks <br />0.00236 months <br /> of inspection-related activities In-service Inspection Radiation Protection Maintenance Effectiveness Heat Sink Emergency Preparedness Exercise Plant Modifications Biennial Corrective Actions Program Reactor Operator Licensing Examinations Supplementals for White performance indicator and White finding Security Triennial Fire Protection Triennial Component Design Basis

2007 Assessment Results - Unit 1 Regulatory Response Column White finding in the Emergency Preparedness cornerstone Supplemental inspection completed with satisfactory results White Mitigating Systems Performance Index (MSPI), Cooling Water Systems Performance Indicator in 4th quarter 2007 Supplemental inspection planned for Summer 2008 All other findings very low safety significance (Green)

All other Performance Indicators were Green

2007 Assessment Results - Unit 2 Regulatory Response Column White finding in the Emergency Preparedness cornerstone Supplemental inspection completed with satisfactory results White MSPI, Cooling Water Systems PI Supplemental inspection completed June 2007 Additional Failure in the 3rd quarter 2007 Supplemental inspection scheduled for Summer 2008 All other findings very low safety significance (Green)

All other Performance Indicators were Green

2007 Assessment Summary Southern Nuclear operated Vogtle in a manner that preserved public health and safety All cornerstone objectives were met NRC plans baseline inspections and a supplemental inspection for Unit 1 and Unit 2 for the remainder of 2008

Contacting the NRC Report an emergency (301) 816-5100 (call collect)

Report a safety concern (800) 695-7403 Allegation@nrc.gov General information or questions Public Web site: www.nrc.gov Select What We Do for Public Affairs

Reference Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html Public Document Room 1-800-397-4209