ML021340458 | 16 May 2002 | Training Managers Conference Handouts | Significance Determination Process Job Performance Measure Fuel cladding |
ML022520025 | 5 September 2002 | Meeting Handout Materials Discussion of Upgrade to Existing Sequencers | |
ML030990055 | 1 April 2003 | Annual Assessment Meeting - Vogtle Electric Generation Plant | |
ML032720611 | 22 September 2003 | Exam Process | |
ML032720621 | 24 September 2003 | Examiner - Vendor Matrix with Phone Number | |
ML060170638 | 17 January 2006 | Pjm Slides, Voltage Control for Nuclear Power Plants in Pjm | |
ML060170644 | 9 January 2006 | Naruc Statement, Remarks on Grid Stability and Offsite Power Issues | |
ML061020062 | 29 March 2006 | Annual Assessment Meeting Attendance List & Slides | |
ML061520410 | 1 June 2006 | Meeting Slides, Bop/Fp/Hvac System Health Reports | Through-Wall Leak |
ML061520412 | 23 May 2006 | Meeting Slides, Vogtle Unit 2, RHR Bypass Line Leaks | |
ML061520415 | 23 May 2006 | Meeting Slides Meeting with NRC | Power change |
ML061920330 | 14 April 2006 | Attachment 2 - SNC Slides for April 14, 2006 Public Meeting to Discuss Vogtle Early Site Permit Seismic Activities | Earthquake |
ML070670333 | 1 March 2007 | AP1000 Seismic Assessment Status | |
ML070860552 | 22 March 2006 | Industry CLIIP Fee Status 2007A - Updated | |
ML071590209 | 31 May 2007 | Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML071700452 | 30 May 2007 | Meeting Slides/Handouts, Transmission Planning for New Generation at Plant Vogtle Site. | |
ML071700466 | 31 May 2007 | 05/2007 Generation Planning Overview. | |
ML072000459 | 19 July 2007 | Industry CLIIP Status 2007 | |
ML072750261 | 1 October 2007 | Scoping Fleeting Handouts; Presentation | |
ML072750263 | 1 October 2007 | Scoping Meeting Handouts; Welcome Letter | Open House |
ML072750264 | 1 October 2007 | Scoping Meeting Handouts; Agenda | |
ML072980670 | 24 October 2007 | Meeting Presentation on GEH Chemical Effects Testing Update | |
ML081190196 | 24 April 2008 | Voglte End of Cycle Public Meeting Assessment Slides | |
ML081610563 | 3 June 2008 | 06/03/2008 Meeting Hand-outs,Preliminary Results of the Vogtle Electric Generating Plant, Units 1 & 2 License Renewal Environmental Review, Draft SEIS Public Meeting | |
ML083240825 | 24 November 2008 | Enclosure 2 - Handout - TSTF Presentation Discussions on Industry Concerns Regarding Technical Specification Branch Positions and TSTF-493, Rev. 3, Clarify Application of Setpoint Methodology for LSSS Functions. | Ultimate heat sink Backfit |
ML091390378 | 19 May 2009 | Proposed Technical Specification Approach in Response to Generic Letter 2008-01 | |
ML091390631 | 4 June 2009 | ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides | Probabilistic Risk Assessment Nondestructive Examination Cyber Security Fuel cladding |
ML091630177 | 4 June 2009 | Technical Specification Task Force Presentation for Meeting to Discuss Status of Current and Planned TSTF Travelers, and Process and Administrative Issues of Mutual Interest | Surveillance Frequency Control Program Exemption Request |
ML093280281 | 5 November 2009 | Trip Report - Watts Bar Unit 2 and Vogtle Site - Enclosure 3 | |
ML093520459 | 16 December 2009 | Meeting Presentation, U.S. Nuclear Regulatory Commission - Center for Construction Inspection | Fitness for Duty |
ML101090451 | 19 April 2010 | Summary of Public Meeting with Vogtle to Discuss Annual Assessment | |
ML102950430 | 14 January 2011 | October 21, 2010 Summary of Meeting with Southern Nuclear Operating Company, Inc. (SNC) and Westinghouse, on Submittal Schedule for Steam Generator Interim Repair Criteria | |
ML103620570 | 22 December 2010 | Summary of Meeting with Vogtle Electric Generating Plant to Discuss Plans to Construct and Operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant | |
ML110140055 | 12 January 2010 | TSTF-523 Meeting Presentation | Condition Adverse to Quality |
ML111180738 | 28 April 2011 | Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Annual Assessment of Vogtle Electric Generating Plant for the Period of January 1, 2010 - December 31, 2010 | Aging Management |
ML11157A045 | 12 May 2011 | Handout from May 12, 2011, Meeting with TSTF: Traveler Review Process Data | |
ML112200077 | 31 August 2011 | 8/4/2011 - Presentation for Meeting with the Technical Specifications Task Force and the Nuclear Energy Institute Regarding Gas Accumulation Issues and TSTF-523 | |
ML11223A061 | 3 August 2011 | NEI Gat Presentation at 8/4/11 Meeting - Purpose of NEI 09-10, Guidelines for Effective Prevention and Management of System Gas Accumulation. | |
ML11223A062 | 3 August 2011 | 8/4/11 -TSTF Presentation at Meeting with NRC and NEI Regarding Gas Accumulation Issues and TSTF-523, TSTF Response to NRC Letter Dated May 25, 2011. | Functionality Assessment Surveillance Frequency Control Program |
ML11224A117 | 3 August 2011 | Meeting Handout - DAEC Proposal to Consolidate Identical SRs After SFCP Adoption | |
ML11224A119 | 3 August 2011 | Meeting Handout - TSTF Concerns with the Proposed NFPA-805 License Conditions | Backfit |
ML11224A120 | 3 August 2011 | Meeting Handout - Compliance and Safety Concerns with Required Actions 3.8.1.B.3.1 and B.3.2 | |
ML113040026 | 10 November 2011 | NRC Handout from Public Call on October 27, 2011, Administrative Controls TS IST Program SR 3.0 Egm | Offsite Dose Calculation Manual Incorporated by reference |
ML113220164 | 17 November 2011 | TSTF Presentation Revision to TSTF-523 | Surveillance Frequency Control Program |
ML12094A203 | 2 April 2012 | Public Meeting Licensee Slides - Vogtle Initial License Exam High Failure Rate | |
ML12096A163 | 5 April 2012 | 3/29/2012 Public Meeting Summary - Vogtle Electric Generating Plant | Aging Management |
ML12101A018 | 11 April 2012 | Meeting Slides - Meeting with Southern Nuclear Operating Company, Inc. to Discuss Risk-Informed Technical Specification Changes | Ultimate heat sink |
ML12117A324 | 2 May 2012 | 4/11/12 Meeting Summary - Summary of Meeting with Southern Nuclear Operating Company, Inc, on Technical Specifications Risk-Informed Initiative 4B | Probabilistic Risk Assessment |
ML121210725 | 25 May 2012 | Active Traveler Status Report (Item Iv.A) | Shutdown Margin Pressure Boundary Leakage |
ML121210726 | 14 February 2012 | Traveler Review Priority(Item Iv.B) | Shutdown Margin Pressure Boundary Leakage |