ML072750264
ML072750264 | |
Person / Time | |
---|---|
Site: | Vogtle |
Issue date: | 10/01/2007 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
Download: ML072750264 (1) | |
Similar Documents at Vogtle | |
---|---|
Category:Meeting Agenda
MONTHYEARPMNS20241406, Pre-Submittal Meeting Regarding a Proposed License Amendment Request to Revise Various Technical Specification Shutdown Actions Mode Change Restrictions2024-11-0707 November 2024
[Table view]Pre-Submittal Meeting Regarding a Proposed License Amendment Request to Revise Various Technical Specification Shutdown Actions Mode Change Restrictions PMNS20241263, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints2024-10-0202 October 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Increase Flexibility in Mode Restraints PMNS20241255, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes2024-10-0101 October 2024 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Add a New Tcold High Function to Technical Specification (TS) Table 3.3.8-1 for Passive Residual Heat Removal Actuation Logic Changes PMNS20240906, Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions2024-07-11011 July 2024 Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions PMNS20240744, Pre-submittal Meeting with Southern Nuclear Operating Company to Discuss a Proposed License Amandement Request to Revise TS 3.3.8 Engineered Safety Feature Actuation System Instrumentation, for Vogtle Units 3 and 42024-06-13013 June 2024 Pre-submittal Meeting with Southern Nuclear Operating Company to Discuss a Proposed License Amandement Request to Revise TS 3.3.8 Engineered Safety Feature Actuation System Instrumentation, for Vogtle Units 3 and 4 PMNS20240750, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Technical Specification (TS) 3.8.2, DC (Direct Current) Sources - Shutdown, for Vogtle Electric Generating Plant (Vogtle), Units 3 and 42024-06-0404 June 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Technical Specification (TS) 3.8.2, DC (Direct Current) Sources - Shutdown, for Vogtle Electric Generating Plant (Vogtle), Units 3 and 4 PMNS20240691, Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions2024-05-21021 May 2024 Southern Nuclear Operating Company (SNC) Fleet Physical Barrier Exemptions PMNS20240662, Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 12024-05-13013 May 2024 Notice of Meeting with Southern Nuclear Operating Company (SNC) Regarding the Steam Generator (SG) Tube Inspection Report for Vogtle, Unit 1 PMNS20240471, Annual Assessment Meeting2024-04-17017 April 2024 Annual Assessment Meeting PMNS20240400, Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Revise Condition a (One Valve or Damper Inoperable) of Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), for Vogtle, Units 3 and2024-04-0404 April 2024 Pre-Submittal Meeting for a Proposed License Amendment Request (LAR) to Revise Condition a (One Valve or Damper Inoperable) of Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), for Vogtle, Units 3 and 4 PMNS20240397, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240399, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240398, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240396, Notice of Meeting with Southern Nuclear Operating Company2024-03-19019 March 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240379, Pre-Submittal Meeting Regarding Proposed Alternative Requests to Extend Exam Interval for Specific Components at Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 22024-03-15015 March 2024 Pre-Submittal Meeting Regarding Proposed Alternative Requests to Extend Exam Interval for Specific Components at Joseph M. Farley Nuclear Plant, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1 and 2 ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR PMNS20240263, Pre-Submittal Meeting Between NRC and Southern Nuclear Operating Company (SNC) for a Proposed License Amendment Request Related to TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections, at Vogtle, Units 3 and 42024-02-22022 February 2024 Pre-Submittal Meeting Between NRC and Southern Nuclear Operating Company (SNC) for a Proposed License Amendment Request Related to TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections, at Vogtle, Units 3 and 4 PMNS20240142, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240140, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240143, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20240141, Notice of Meeting with Southern Nuclear Operating Company2024-02-0101 February 2024 Notice of Meeting with Southern Nuclear Operating Company PMNS20231396, Pre-Submittal Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Relief Request for Explosively Actuated Valves at Vogtle Electric Generating Plant (Vogtle), Units 3 and 42023-12-15015 December 2023 Pre-Submittal Meeting with Southern Nuclear Operating Company (SNC) Regarding a Proposed Relief Request for Explosively Actuated Valves at Vogtle Electric Generating Plant (Vogtle), Units 3 and 4 PMNS20231383, Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR2023-12-11011 December 2023 Pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) Regarding the Proposed Transition of the Vogtle Electric Generating Plant, Units 3 and 4 Ndqam Into the SNC Fleet QATR PMNS20231359, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231363, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231364, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231360, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231357, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231355, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231365, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231358, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231356, Notice of Meeting with Southern Nuclear Operating Company2023-11-30030 November 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231347, Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle2023-11-29029 November 2023 Notice of Public, pre-submittal Meeting with Southern Nuclear Operating Company, Inc. (SNC) to Discuss a Proposed Fleet License Amendment Request (LAR) for Farley, Hatch, and Vogtle PMNS20231198, Closed Meeting - Security-Related - SNC Fleet Physical Barriers Exemptions.The Basis for the Closed Meeting Is the Discussion of Official Use Only - Security-Related Information2023-10-25025 October 2023 Closed Meeting - Security-Related - SNC Fleet Physical Barriers Exemptions.The Basis for the Closed Meeting Is the Discussion of Official Use Only - Security-Related Information PMNS20231197, Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times2023-10-24024 October 2023 Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times PMNS20231111, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231114, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231116, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231118, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231112, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231115, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231117, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231119, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231113, Notice of Meeting with Southern Nuclear Operating Company2023-10-0303 October 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230993, Pre-Submittal Meeting for a Proposed License Amendment Request to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves)2023-09-14014 September 2023 Pre-Submittal Meeting for a Proposed License Amendment Request to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) PMNS20231003, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231001, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231002, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20231004, Notice of Meeting with Southern Nuclear Operating Company2023-09-0707 September 2023 Notice of Meeting with Southern Nuclear Operating Company PMNS20230909, Notice of Meeting with Southern Nuclear Operating Company2023-08-29029 August 2023 Notice of Meeting with Southern Nuclear Operating Company 2024-07-11 Category:Meeting Briefing Package/Handouts MONTHYEARML24289A2352024-10-15015 October 2024
[Table view]Supplemental Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 PRHR LAR ML24283A2022024-10-0909 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 16, 2024 - Proposed Vogtle 3 and 4 Flexibility Modes LAR ML24282A9822024-10-0808 October 2024 Slides - SNC Presentation - Pre-Submittal Meeting on October 15, 2024 - Proposed Vogtle 3 and 4 Passive Residual Heat Removal Actuation Logic Changes License Amendment Request ML24164A2942024-06-17017 June 2024 Licensee Slides for Pre-submittal Meeting for VEGP Units 3 and 4 for a Proposed License Amendment Request Regarding TS 3.3.8 ML24158A3832024-06-0606 June 2024 SNC Slides - Vogtle 3 and 4 - TS 3-8-2 - Pre-Submittal Meeting - 06-27-2024 ML24120A2202024-04-30030 April 2024 Annual Assessment Meeting Presentation Slides - April 30, 2024 ML24089A1492024-04-0404 April 2024 Slides - SNC Presentation - Pre-Submittal Meeting on April 4, 2024 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML24060A2732024-03-0707 March 2024 SNC Slides - Pre-Submittal Meeting on March 7, 2024 - Vogtle 3 & 4 TSTF-577 LAR ML24022A1192024-01-24024 January 2024 Slides - SNC Slides - Pre-Submittal Meeting on January 24, 2024 - Vogtle 3 & 4 Explosively Actuated Valves Relief Request ML23361A0812024-01-0808 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML24004A1852024-01-0404 January 2024 SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR Revised ML23257A2322023-09-28028 September 2023 SNC Presentation - Pre-Submittal Meeting on September 28, 2023 - Proposed Vogtle 3 and 4 TS 3.7.6 LAR ML23137A1162023-06-0202 June 2023 Draft Slides for Advisory Committee on Reactor Safeguards Subcommittee Meeting Regarding Use of Accident Tolerant Fuel Lead Test Assemblies ML23094A1402023-04-0404 April 2023 4 -- 2022 Aam Slides ML23055A0402023-02-24024 February 2023 VEGP, Unit 4, Potential License Amendment Request for Prior to Initial Criticality Overview Presentation ML23033A0232023-02-0202 February 2023 Dashboard Report 2-2-2023 ML22335A0372022-12-0101 December 2022 Dashboard Report 12-1-2022 ML22329A0192022-12-0101 December 2022 Southern Nuclear Company Slides - Pre-Submittal Meeting on December 1, 2022 - Vogtle SR 3.4.14.1 LAR and Alternative Relief Request 1 ML22332A5372022-11-28028 November 2022 Draft LAR 23-001 for 12-8-22 Public Meeting ML22332A0012022-11-28028 November 2022 SNC Slides - Pre-Submittal Meeting on November 30, 2022 - Vogtle TS 5.5.11 License Amendment Request ML22319A1242022-11-15015 November 2022 NRC Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22319A0052022-11-15015 November 2022 NEI Slides for November 15 2022 Public Meeting on Part 52 Lessons Learned ML22319A1232022-11-15015 November 2022 Kozak Slides for November 15, 2022 Public Meeting on Part 52 Lessons Learned ML22251A0002022-09-30030 September 2022 Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML22265A0972022-09-22022 September 2022 Southern Nuclear Company Slides on Lessons Learned from Part 52 Implementation for Public Meeting on 9/27/2022 ML22265A0982022-09-22022 September 2022 NRC Slides on Part 52 Lessons Learned Construction Initiative for Public Meeting on 9/27/2022 ML22138A3952022-05-24024 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 24, 2022 - Vogtle RR RWST Suction Check Valves ML22137A2812022-05-23023 May 2022 Slides - SNC Slides - Pre-Submittal Meeting on May 23, 2022 - Vogtle TS 3.8.1 and TSTF-163 LAR ML22126A0102022-05-11011 May 2022 Pre-Submittal Meeting on May 11, 2022 - Vogtle ATF LTAs LAR and Exemption Requests - Licensing Questions ML22123A3332022-05-10010 May 2022 Pre-Submittal Meeting 2: TSTF-51, TSTF-471, TSTF-490, and Alternative Source Term License Amendment Request - May 10, 2022 (EPID L-2022-LRM-0033)(slides) ML22110A1702022-04-20020 April 2022 4 2022 Annual Assessment Meeting.Final ML22021B6472022-01-27027 January 2022 Pre-Submittal for Westinghouse Increased Enrichment Accident Tolerant Fuel Lead Test Assemblies (EPID L-2022-LRM-0003) (Slides) ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21333A2172021-11-29029 November 2021 Readiness Group Presentation During 12-2-21 Public Meeting ML21230A2842021-08-18018 August 2021 SNC Slides - Vogtle MSIV Elimination LAR - Pre-submittal Meeting Part 2 - 08-25-2021 ML21193A0762021-07-0808 July 2021 ITAAC Related to Incore Instrument Thimble Assembly (Iita) ML21187A0972021-07-0808 July 2021 Late Filed Allegations (Lfa) Process ML21172A1312021-07-0101 July 2021 Pre-Submittal Meeting Alternate Source Term and TSTF-490 ML21193A0772021-06-24024 June 2021 Exemption from Operator Written Examination and Operating Test for Unit 4 Licenses, 6-24-21 Pre-submittal Meeting ML21085A4902021-05-19019 May 2021 Risk-informed Resolution of Generic Letter 2004-02 ML21064A3652021-03-0101 March 2021 Dashboard Report 3-1-2021 ML21027A2062021-02-28028 February 2021 Fixed 8-Hour Emergency Light Deviation Pre-Submittal Meeting, February 2021 (Slides) ML21057A0182021-02-26026 February 2021 Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides) ML21036A1172021-02-0505 February 2021 SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR ML20343A0742020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20314A0962020-11-0202 November 2020 Dashboard Report 11/02/2020 ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20136A2832020-05-15015 May 2020 4 EOC Slides ML20114E3032020-04-23023 April 2020 Risk-Informed GL 2004--02 Pre-Submittal NRC Meeting - May 2020 2024-06-06 |
Text
NUCLEAR REGULATORY COMMISSION ENVIRONMENTAL SCOPING MEETING VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION Augusta Technical College, Waynesboro Campus Waynesboro, GA AGENDA September 27, 2007 Two Identical Meetings*
(1:30 p.m. - 4:30 p.m. and 7:00 p.m. - 10:00 p.m.)
I. Welcome and Purpose of Meeting 10 minutes **
II. Overview of the Environmental Review Process 15 minutes Ill. Public Comments As Needed IV. Closing/Availability of Transcript 5 minutes The NRC staff will host informal discussions one hour prior to each meeting session. No formal comments on the proposed scope of the environmental impact statement will be accepted during the informal discussions. To be considered, comments must be provided either at the transcribed public meetings or in writing, as described in the enclosed FederalRegister notice.
- Times in this agenda are approximates.