Annua I Assessment Meeting Vogtle Electric Generating Plant Nuclear Regulatory Commission April 1, 2003

Annual Licensee Assessment Meeting

  • A public forum for discussion of the Iicensee' s performance as outlined in the NRC's Annual Assessment Letter
  • Provide licensee with an opportunity to respond to the information In the Assessment Letter

NRC Performance Goals

  • Maintain safety and protect the environment
  • Enhance public confidence Iimprove effectiveness, effici e ncy, and realism of processes and decision making
  • Reduce unnecessary regulatory burden

Regulatory Framework Strategic Performance Cornerstones


HUMAN H ------------------ SAFETY CONSCIOUS WORK --------------------- PROBLEM -------------------

PERFORMANCE ENVIRONMENT IDENTIFICATION AND RESOLUTION Cross-Cutting Areas

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones l inspection2 o_

Significance Threshold Regulatoy Response

Action Matrix Licensee l Regulatory Degraded l Multiple/ Repetitive Unacceptable.

Response l Response Cornerstone Degraded Cornerstone Performance Column lColumn Column Column Column All Assessment inputs One or Two White Inputs (in One Degraded Comerstone Repebtive Degraded Overall Unacceptable (Performance indicators different cornerstones) in a (2White Inputs or 1 Yellow Cornerstone, Multiple Performance; Plants (Pis) and Inspection Strategic Performance Area; Input) or any 3 White Inputs Degraded Cornerstones, Not Permitted to J Findings) Green; Cornerstone Objectives Fully in a Strategic Performance Multiple Yellow inputs, or Operate Within this

Cornerstone Objectives Met Area; Cornerstone I Red Input; Cornerstone Band, Unacceptable CO Fully Met Objectives Met with Moderate Objectives Met with Margin to Safety i Degradation in Safety Longstanding Issues or Performance Significant Degradation in

= Safety Performance None Branch Chief (BC) or RA (or EDO) Meet with Commission meeting Regulatory Performance Division Director (DD) Meet DD or Regional Administrator Senior Licensee with Senior Licensee t Meeting with Licensee (RA) Meet with Licensee Management Management Licensee cumulative root Z cause evaluation with Lic Licensee root cause Licensee cumulative root consideration of a I L ic Action Licensee Corrective Action evaluation and corrective cause evaluation with NRC Performance V action with NRC Oversight Oversight Improvement Plan with i__ _ _ ZNRC Oversight Baseline and Risk-Informed Baseline Baseline and supplemental Baseline and supplemental supplemental inspection NRC Inspection Inspection Program inspection procedure 95001 inspection procedure 95002 procedure 95003

-10 CFR 2.204 DFI Order to Modify, Supplemental inspection only Supplemental inspection only -10 CFR 50.54(f) Letter Suspend, or Revoke

Regulatory Actions None - CAL/Order Licensed Activities z BC or DD review/sign RA review/sign o Assessment Letters assessment report (w/ DO review/sign assessment RA review/sign assessment assessment report (w/

i inspection plan) report (w/ inspection plan) report (w/ inspection plan) Inspection plan)

C) . SRI or BC Meet with BC or DD Meet with Licensee RA (or DD) Discuss RA or EDO Discuss j Annual Public Meeting Licensee Performance with Licensee Performance with Senior

_ __ _ _ __ _ _ __ __ _ __ __ _ _ __ __ _ _ __ _ _ _ __ _ _ __ _ _ _ _ __ _ _ _ _ __ ___ ___ ____ ___ ___ __ ice see Manaa_ e metMant_ __e__en Commission Meeting o Comnission Involvement None None None Plant discussed at AARM with Senior Licensee

°o l ____.Management INCREASING SAFElY SIGNIFICANCE ------- 0 Note 1: The regulatory actions for plants inthe MulipletRepetitive Degraded Comerstone column are not mandatory agency actions. However, the regional office should consider each of these regulatory actions when significant new information regarding licensee performance becomes available.

Key Aspects of the Assessment Program

  • Objective review of licensee performance
  • "Action Matrix" identifies agency response commensurate with safety signifi cance
  • Increasing safety significance results in:

- Increased levels of inspection

- Involvement of higher levels of NRC and Licensee management

- Increased regulatory action

  • Plant specific assessment information on NRC public web site:

actionmatrixsummary.html

NRC Inspection Activities in 2002

  • Routine Resident Baseline Inspection s
  • Security Inspections
  • Reactor Vessel Head Inspection S
  • Problem Identification and Resolution Inspection
  • Emergency Exercise Inspection

Plant Performance Summary

  • All Performance Indicators and Inspection Findings were Green
  • All corn e rston e objectives fully met El1n Licensee Response Column for all four quarters
  • Preserved public health and safety
  • Baselin e inspection program to be performed

Fourth Quarter 2002 Performance Summary Performance Indicators Vogtle Unit 1: Licensee Response Column Performance Indicators

Year-2002 Performance S ummary Inspection Findings Vogtle Unit 1 Licensee Response Column Most Significant Inspection Findings 4QW202 3Q02002

=20i202 10Q2002

Fourth Quarter 2002 Performance Summary Performance Indicators --- -= I 11- - I I -I .

Vogtle Unit 2: Licensee Response Column Performance Indicators

Year 2002 Performance Summary Inspection Findings Vogtle Unit 2: Licensee Response Col umn Most Significant Inspection Findings 40/2002 3Q0002 2Q02002 1Q002

ROP Action Matrix Summary for 2002

  • Column 1 - Licensee Response
  • Column 2 - Regulatory Response
  • Column 3 - Degraded Cornerstone
  • Column 4 - Multiple/ Repetitive Degraded Cornerstone
  • Column 5 - Unacceptable Performance (Nationwide number does not contain Davis Besse)

Security & Safeguards Update I reation of Office of Nuclear Security and C

Iricide nt Response

  • Top-to-Bottom Review of Security Program Initiated ElIssuance of Orders/ Interim Compensatory Measures (ICM)
  • Verification of Licensee Actions on ICM

Security & Safeguards Update

  • Proposed Revisions to Design Basis Threat
  • Pending Orders on Fatigue/Guard Training
  • Initiation of Pilot Force-on-Force Exercise Program

Contacts for additional information for:

Vogtle Electric Generating Plant

  • Regional Public Affairs Officer:
  • Name: Kenneth M. Clark
  • Phone: 404-562-4416
  • E-mail: kmc2@nrc.gov
  • State Liaison Officer:
  • Name: Robert E. Trojanowski
  • Phone: 404-562-4427
  • E-mail: retgnrc.gov
  • Branch Chief:
  • Name: Brian R. Bonser
  • Phone: 404-562-4540
  • E-mail: brblgnrc.gov
  • Senior Resident Inspector:
  • Phone: 706-554-9901
  • E-mail: jxzunrc.gov

Contacting the NRC

  • Report an emergency
  • (3 01) 816-5 100 (call collect)
  • Report a safety concern:

(800) 695-7403

  • Allegationgnrc.gov
  • General information or questions
  • www.nrc.gov
  • Select "What We Do" for Public Affairs

Regional Organization Regional Organization