Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML021340458 | 16 May 2002 | Training Managers Conference Handouts | Significance Determination Process Job Performance Measure Fuel cladding |
ML022520025 | 5 September 2002 | Meeting Handout Materials Discussion of Upgrade to Existing Sequencers | |
ML022690267 | 25 September 2002 | Meeting Handouts to Discuss Kaowool Issues | Ultimate heat sink Fire Barrier |
ML030990055 | 1 April 2003 | Annual Assessment Meeting - Vogtle Electric Generation Plant | |
ML030990060 | 27 March 2003 | Annual Assessment Meeting Farley Nuclear Power Plant | |
ML032260315 | 25 July 2003 | Meeting Handout Materials for 07/25/03 for Farley Plant, Units 1 and 2, Regarding Reliance on Kaowool for Service Water Intake Structure | Safe Shutdown Fire Barrier Exemption Request |
ML032720611 | 22 September 2003 | Exam Process | |
ML032720621 | 24 September 2003 | Examiner - Vendor Matrix with Phone Number | |
ML040130083 | 8 January 2004 | Transmittal of Meeting Handout Materials for 01/08/04 Meeting to Discuss the Environmental Scoping Process for the LRA for Farley Nuclear Plant | |
ML040290388 | 29 January 2004 | Meeting Handouts - Enclosure 2 - Joseph M. Farley Plant Reactor Vessel Head Penetration Nozzle Inspection Relaxation Unit 2 Spring 2004- 2R16 | |
ML052350343 | 25 August 2005 | Southern Nuclear/Westinghouse Proposed Test Plan to Demonstrate Benefits of Zinc Additions to Mitigate PWSCC | |
ML060170638 | 17 January 2006 | Pjm Slides, Voltage Control for Nuclear Power Plants in Pjm | |
ML060170644 | 9 January 2006 | Naruc Statement, Remarks on Grid Stability and Offsite Power Issues | |
ML061020062 | 29 March 2006 | Annual Assessment Meeting Attendance List & Slides | |
ML061520410 | 1 June 2006 | Meeting Slides, Bop/Fp/Hvac System Health Reports | Through-Wall Leak |
ML061520412 | 23 May 2006 | Meeting Slides, Vogtle Unit 2, RHR Bypass Line Leaks | |
ML061520415 | 23 May 2006 | Meeting Slides Meeting with NRC | Power change |
ML061920330 | 14 April 2006 | Attachment 2 - SNC Slides for April 14, 2006 Public Meeting to Discuss Vogtle Early Site Permit Seismic Activities | Earthquake |
ML070670333 | 1 March 2007 | AP1000 Seismic Assessment Status | |
ML071590121 | 30 May 2007 | Mrp/Prwog Mitigation Briefing, Industry Update PWROG Farley Zinc Program. | |
ML071590209 | 31 May 2007 | Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML071700452 | 30 May 2007 | Meeting Slides/Handouts, Transmission Planning for New Generation at Plant Vogtle Site. | |
ML071700466 | 31 May 2007 | 05/2007 Generation Planning Overview. | |
ML072750261 | 1 October 2007 | Scoping Fleeting Handouts; Presentation | |
ML072750263 | 1 October 2007 | Scoping Meeting Handouts; Welcome Letter | Open House |
ML072750264 | 1 October 2007 | Scoping Meeting Handouts; Agenda | |
ML072980670 | 24 October 2007 | Meeting Presentation on GEH Chemical Effects Testing Update | |
ML081190196 | 24 April 2008 | Voglte End of Cycle Public Meeting Assessment Slides | |
ML081490090 | 22 May 2008 | List of Attendees - Joseph M. Farley Nuclear Plant, Annual Public Assessment Meeting | |
ML081610563 | 3 June 2008 | 06/03/2008 Meeting Hand-outs,Preliminary Results of the Vogtle Electric Generating Plant, Units 1 & 2 License Renewal Environmental Review, Draft SEIS Public Meeting | |
ML090921035 | 19 March 2009 | Annual Assessment Meeting Presentation | B.5.b |
ML091390631 | 4 June 2009 | ACRS Meeting with the U.S. Nuclear Regulatory Commission, - June 4, 2009, Slides | Probabilistic Risk Assessment Nondestructive Examination Cyber Security Fuel cladding |
ML093280281 | 5 November 2009 | Trip Report - Watts Bar Unit 2 and Vogtle Site - Enclosure 3 | |
ML093520459 | 16 December 2009 | Meeting Presentation, U.S. Nuclear Regulatory Commission - Center for Construction Inspection | Fitness for Duty |
ML100980592 | 8 April 2010 | Summary of Public Meeting to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2009 - December 31, 2009 - Joseph M. Farley Nuclear Plant | |
ML101090451 | 19 April 2010 | Summary of Public Meeting with Vogtle to Discuss Annual Assessment | |
ML101670548 | 8 June 2010 | Farley Nuclear Plant, NRC Screening Criteria Response | Safe Shutdown Fire Protection Program |
ML102950430 | 14 January 2011 | October 21, 2010 Summary of Meeting with Southern Nuclear Operating Company, Inc. (SNC) and Westinghouse, on Submittal Schedule for Steam Generator Interim Repair Criteria | |
ML103620570 | 22 December 2010 | Summary of Meeting with Vogtle Electric Generating Plant to Discuss Plans to Construct and Operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant | |
ML111180738 | 28 April 2011 | Summary of Public Meeting with Southern Nuclear Operating Company, Inc. to Discuss the Annual Assessment of Vogtle Electric Generating Plant for the Period of January 1, 2010 - December 31, 2010 | Aging Management |
ML12094A203 | 2 April 2012 | Public Meeting Licensee Slides - Vogtle Initial License Exam High Failure Rate | |
ML12096A163 | 5 April 2012 | 3/29/2012 Public Meeting Summary - Vogtle Electric Generating Plant | Aging Management |
ML12101A018 | 11 April 2012 | Meeting Slides - Meeting with Southern Nuclear Operating Company, Inc. to Discuss Risk-Informed Technical Specification Changes | Ultimate heat sink |
ML12117A324 | 2 May 2012 | 4/11/12 Meeting Summary - Summary of Meeting with Southern Nuclear Operating Company, Inc, on Technical Specifications Risk-Informed Initiative 4B | Probabilistic Risk Assessment |
ML13078A245 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 1 (3/19) | Safe Shutdown Multiple Spurious Operation |
ML13078A246 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/19) | Fire Protection Program |
ML13078A247 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/20) | Large early release frequency Very Early Warning Fire Detection |
ML13078A248 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 3 (3/19) | Hot Short |
ML13078A250 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 4 | |
ML13078A251 | 19 March 2013 | 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19) | Fire Protection Program |