ML040130083
From kanterella
Jump to navigation
Jump to search
Letter Sequence Meeting | |
---|---|
Initiation
Administration | |
MONTHYEARNL-03-2256, NRC Environmental Scouting Trip Requested Additional Information in Support of NRC TAC Nos. MC0768, MC07692003-11-0303 November 2003
[Table View]NRC Environmental Scouting Trip Requested Additional Information in Support of NRC TAC Nos. MC0768, MC0769 Project stage: Other ML0335203282003-12-17017 December 2003 Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives for Joseph M. Farley Nuclear Plant, Units 1 and 2 Project stage: RAI ML0401300832004-01-0808 January 2004 Transmittal of Meeting Handout Materials for 01/08/04 Meeting to Discuss the Environmental Scoping Process for the LRA for Farley Nuclear Plant Project stage: Meeting ML0430903022004-09-30030 September 2004 Preliminary Results of Environmental Review Joseph M. Farley Nuclear Plant, Units 1 and 2, September 30, 2004 Project stage: Other 2003-12-17 |
ML040130083 | |
Person / Time | |
---|---|
Site: | Farley ![]() |
Issue date: | 01/08/2004 |
From: | Jack Cushing NRC/NRR/DRIP/RLEP |
To: | Document Control Desk |
References | |
TAC MC0768, TAC MC0769 | |
Download: ML040130083 (15) | |
Similar Documents at Farley | |
---|---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML23361A0812024-01-0808 January 2024
[Table view]SNC Slides - Pre-Submittal Public Meeting on January 8, 2024 Related to Fleet QATR ML23139A2462023-05-19019 May 2023 Annual Assessment Public Meeting Slides (May 23, 2023) ML22080A0192022-03-18018 March 2022 Annual Assessment Meeting Presentation ML21306A0242021-11-30030 November 2021 SNC Pre-Submittal Meeting for LAR to Relocate Augmented Piping Inspection Program Details from TSs to a Licensee Controlled Document for Farley Nuclear Plant, Units 1 & 2; and Vogtle Electric Generating Plant, Units 1 & 2 (EPID L-2021-LRM-0 ML21280A0012021-10-31031 October 2021 Pre-Submittal Meeting Presentation from SNC to Discuss a Future LAR Regarding Change TS to Increase Containment Peak Pressure to Address Several NSALs ML21173A0632021-06-24024 June 2021 Pre-Application SNC Presentation Slides - Removal of Encapsulations from Recirculation Suction Valves ML21057A0182021-02-26026 February 2021 Pre-Submittal Meeting Revise Technical Specification 3.2.1 Heat Flux Hot Channel Factor (Fq(Z)) (EPID L-2021-LRM-0023) (Slides) ML21036A1172021-02-0505 February 2021 SNC Slides - Pre-Submittal Meeting on February 16, 2021 - Beacon LAR ML20318A1032020-11-12012 November 2020 SNC ERO Staffing LAR RAI Responses ML20217L4312020-08-13013 August 2020 Edwin I Hatch, Units 1 and 2; and Vogtle Electric Plant, Units 1, 2, 3, and 4 - Meeting Slides a License Amendment Request for the Emergency Plan (EPID Nos L-2020-LLA-0150 and L-2020-LLA-051 ML20101K6582020-04-10010 April 2020 Annual Assessment ML20022A0262020-01-22022 January 2020 NEI Presentation Status Update for Ropte Short Term Action Plan: Removed Planned Unavailability for Mitigating Systems Performance Index ML19149A4222019-05-29029 May 2019 Summary of Public Meeting Concerning Annual Assessment of the Farley Nuclear Plant, Units 1 and 2, Docket Nos. 05000348 and 05000361 ML19057A4762019-03-0707 March 2019 Presentation Slides Related to Pre-Application Public Meeting Regarding to Technical Specification 3.3.1 and 3.3.2 (L-2019-LRM-0010) ML19025A0242019-01-25025 January 2019 SNC License Amendment Request for Proposed Changes to Emergency Response Organization Staffing and Augmentation NL-18-1412, Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting2018-11-0808 November 2018 Presentation Material for the Measurement Uncertainty Recovery and Spent Fuel Pool Criticality Analysis Pre-Submittal Meeting ML18311A1822018-11-0707 November 2018 November 13, 2018, Joseph M. Farley Nuclear Power Plant, Public Meeting Slides Regarding Spent Fuel Pool Criticality Analyses and Measurement Uncertainty Recovery (Mur) Pre-Application Meeting ML18290B0942018-10-16016 October 2018 October 16, 2018, Public Meeting Presentation Slides Related to July 27, 2018, License Amendment Request to Implement NEI 06-09, Revision 0-A, Risk-Informed Technical Specifications Initiative 4b. ML18234A4712018-08-23023 August 2018 NRC-Pre Submittal Meeting TSTF-51 for Hatch and TSTF-51 and -471 for Farley - August 23, 2018 ML18136A8902018-05-16016 May 2018 May 21, 2018 Slides for Public Teleconference Regarding Changes to Hatch, Farley, and Vogtle TS 5.2.2.g ML18065A0202018-03-12012 March 2018 March 12, 2018, Public Meeting Presentation ML18065A0222018-03-0606 March 2018 March 12, 2018, Public Meeting - Draft 4b Application ML18065A0252018-03-0606 March 2018 Joseph M Farley March 12, 2018, Public Meeting - Draft 4b Application Enclosures NL-16-0388, September 22, 2016, Public Meeting Presentation Slides2016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides ML16260A1162016-09-22022 September 2016 September 22, 2016, Public Meeting Presentation Slides ML15106A2042015-04-22022 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation ML14115A4052014-04-25025 April 2014 2013 End of Cycle Farley Public Meeting Summary Memo ML14108A0052014-04-23023 April 2014 April 23, 2014, Public Meeting Presentation Slides, Southern Nuclear Company, SNC Degraded Grid Design Criteria. ML14120A2252014-04-23023 April 2014 April 23, 2014, Category 1 Public Meeting, J.M. Farley Presentation Slides, Residual Heat Removal Autoclosure Interlock Deletion. ML14135A1732014-02-26026 February 2014 May 16, 2014, J.M. Farley Category 1 Meeting Handout, Duration for Completion of the Flood Hazard Re-evaluation. ML13079A1502013-03-20020 March 2013 Summary of Public Meeting with Joseph M. Farley ML13078A2472013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/20) ML13078A2502013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 4 ML13078A2512013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 5 (3/19) ML13078A2522013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 6 ML13078A2532013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 8 ML13078A2542013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 9 ML13078A2552013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 10 ML13078A2482013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 3 (3/19) ML13078A2462013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 2 (3/19) ML13078A2452013-03-19019 March 2013 03/21/2013 Licensee Meeting Slides Re Joseph M. Farley Nuclear Plant NFPA 805 Fire Modeling LAR Submittal - Session 1 (3/19) ML1016705482010-06-0808 June 2010 Farley Nuclear Plant, NRC Screening Criteria Response ML1009805922010-04-0808 April 2010 Summary of Public Meeting to Discuss Nrc'S Reactor Oversight Process and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2009 - December 31, 2009 - Joseph M. Farley Nuclear Plant ML0909210352009-03-19019 March 2009 Annual Assessment Meeting Presentation ML0814900902008-05-22022 May 2008 List of Attendees - Joseph M. Farley Nuclear Plant, Annual Public Assessment Meeting ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0715902092007-05-31031 May 2007 Enclosure 7 - Definitions: SSE (Safe Shutdown Earthquake) & OBE (Operating Basis Earthquake) ML0717004662007-05-31031 May 2007 05/2007 Generation Planning Overview. ML0715901212007-05-30030 May 2007 Mrp/Prwog Mitigation Briefing, Industry Update PWROG Farley Zinc Program. ML0523503432005-08-25025 August 2005 Southern Nuclear/Westinghouse Proposed Test Plan to Demonstrate Benefits of Zinc Additions to Mitigate PWSCC 2024-01-08 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML040130083&oldid=2633978"