IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR28 August 1984Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl26 April 1982Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines15 February 1984Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines
ML19289D15610 January 1979Environ Rept (3 Vols) & FSAR (24 Vols) Will Be Sent to Wh Marshall, If Desired
ML20054E7618 June 1982Discusses ACRS Interim Rept Re CP Application.Addl QA Info Requested.Recommendation Re full-power Operation Deferred Pending Review of Audit PlanSafe Shutdown
Systematic Assessment of Licensee Performance
Earthquake
Turbine Missile
ML20054F56715 June 1982Informs That Time for Commission to Act to Review ALAB-674 Expired.Commission Declined Review.Decision Became Final Agency Action on 820614
ML20054G04211 June 1982Notification of 820616 Meeting W/Util in Bethesda,Md to Discuss Addl Info Needed for Equipment Environ Qualification Audit
ML20054H1298 June 1982Forwards Util to Bechtel Transmitting Quality Plan for Underpinning Activities,Relevant to Amend 3 to CPs
ML20054H3959 June 1982Notification of 820615 Meeting W/Util in Bethesda,Md to Discuss Elements of Staff Review Schedule Being Developed for Soils Remedial Activities
ML20054H3979 June 1982Notification of 820611 Meeting W/Util & Bechtel in Bethesda, MD to Resolve SER Open Item 3 on Tornado Missile ProtectionTornado Missile Protection
ML20054H4249 June 1982Notification of 820611 Meeting W/Util in Bethesda,Md to Clarify Encl 8 from NRC Re Soils Remedial Work
ML20054J03122 June 1982Notification of 820628-30 Meetings W/Util & Bechtel in Bethesda,Md to Discuss Fire Protection & Safe ShutdownSafe Shutdown
ML20054J83529 June 1982Advises That Previous Testimony by Region 3 Needs to Be Supplemented
ML20058F33416 July 1982Notification of 820727 & 30 Meetings W/Util & Bechtel in Ann Arbor,Mi to Audit Design Calculations & Applicants Preparations for Remedial Activities Due to Soil Compaction Problems
ML20079R08515 March 1978Forwards Feb Project Status Repts
ML20081M1807 November 1983Requests to Be Informed of Status of QA Requests RT-0005, RT-0006 & RT-0007.Completion Date for QA Requests Is 831104
ML20086Q10615 February 1984Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview
ML20087N33516 March 1984Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities
ML20090F36329 March 1979Forwards Evaluation of Items Transmitted 790228 Re B&W Designed Nuclear Plants
ML20090F7268 January 1979Submits Info on Possible Generic Safety Implications Re Difficulty of B&W Plants in Maintaining Pressurizer Level Indications During Transients
ML20125B3178 June 1982Requests Svcs of L Abramson & D Lurie to Provide Technical Assistance in Assessment of CPC Statistical Approach to Testing Potentially Defective Protective Coating in Reactor Bldg
ML20125B5197 December 1983Expresses Appreciation for Technical Assistance Offered by L Abramsom & D Lurie Re Containment Protective Coating DeficiencyCoatings
ML20126L7998 June 1981Forwards NRC Testimony for 810707 Evidentiary Hearing
ML20126L8593 April 1979Requests That Items of Noncompliance Re Diesel Generator Bldg Settlement Be Given Technical & Legal Review & Determination Made on Materiality of FSAR Discrepancies
ML20126L8649 August 1979Forwards Summary of Ofc of Nuclear Reactor Regulation Comments on Keppler 790403 Memo Re Backfill Deficiency
ML20127F76424 September 1982Discusses Gap 820906 Comments on Interview W/Ee Kent, Former Welding Inspector at Plant.Errors in Ltr Noted. Handling of Allegations Described.Transcript of 820812 Interview Being Prepared
ML20127F7983 March 1982Documents 820302 Telcon W/Ee Kent Re Allegations Concerning Welding Deficiencies at Plant.Details of Allegations Stated.Region III Committed to Insp of Welds
ML20127F8214 March 1982Documents 820302 Telcon W/Ee Kent to Gather Addl Info Re Allegations of Weld Deficiencies at Plant.Allegedly Unacceptable Welds Identified.Disagreements W/Welding Specs Noted.Info Given to R Cook,Resident Inspector
ML20127F8425 March 1982Documents Info Developed Concerning Ee Kent Allegations Re Weld Deficiencies at Plant.Kent Not Qualified to Inspect Welds.Deficiencies in Welds Inspected by Morris Discussed. Welds Described by Kent AcceptableNondestructive Examination
ML20127F88122 March 1985Documents 820317 Telcons W/B Stamaris & Ee Kent Re Allegations of Welding Deficiencies at Plant.Region III Insps Described,Indicating Welds Acceptable.Kent Disagreed. ASME Code Re Socket Weld Engagement Discussed
ML20127F90922 March 1982Documents 820317 Contact W/R Vandenbosch Re Ee Kent Allegations Concerning Weld Deficiencies at Plant.Past Problems W/Welding Program Identified & Corrected. Vandenbosch Confident in Present Program
ML20127F92830 September 1982Documents 820922 Telcon W/B Garde Re Ee Kent Allegations. Inspector Identified W/New Info on Welding Deficiencies Will Be Contacted.B Garde Will Request Independent Audit of Welding Activities.Related Info EnclEarthquake
ML20127F97020 February 1985Forwards BNL Insp Rept Re Allegations 19 & 20 of Employment Discrimination by Bechtel at Plant,For Info.Ch Weil 850327 Handwritten Note Included.W/O Rept
ML20127F99520 February 1985Forwards BNL Rept Re Ee Kent Allegations at Midland Plant. Info Re San Onofre Discovered in Course of Review
ML20128G76228 June 1985Staff Requirements Memo Re 850620 Affirmation/Discussion & Vote in Washington,Dc.Edo & RES Should Forward Fr Notice Re Approved Final Rule on Pressurized Thermal Shock for Signature & Publication
ML20132C95512 April 1985Forwards B Garde Requesting Commissioners to Appoint ASLB Member to Review,Investigate & Issue Findings Re NRC Handling of E Kent Allegations.Info Supplemental to Previous Board Notifications 82-117 & 83-102
ML20133C4058 December 1977Forwards NRR Evaluation & Position Re Moisture Controls of Low Hydrogen Covered arc-welding Electrodes.Position Can Be Applied as Acceptable Method for Moisture Control.W/O Evaluation & Position.Supporting Documentation Encl
ML20133D1094 February 1977Forwards 770128 Request for Addl Info Re ACRS 761201 Supplemental Rept on Midland.Supplemental Rept Encl. Discussion in 770210-12 Meeting & Possible Action During Mar 1977 Full Committee Meeting Planned
ML20133F3957 October 1985Board Notification 85-086:suppls Board Notifications 82-117, 83-102 & 85-045 Re welding-related Allegations at Midland 1 & 2.H Wahl (Bechtel) 850916 Summary of Developments in Suit Filed Re E Kent Allegations & Encl
ML20133G1283 May 1985Advises of ASLB Support of All Seismic Conclusions Except Definition of Tectonic Province.Board Found Staff Placed Too Much Reliance Upon Seismicity in Definition of Tectonic Province within Which Site LiesEarthquake
ML20137E1481 September 1982Submits Background Info on Seismic Issues Re Facility. Changes in Seismic Analyses & SSE Discussed.Description of Changes in NRC Analytical Appproach & Criteria Affecting Facility SSE EnclSafe Shutdown
Safe Shutdown Earthquake
Operating Basis Earthquake
Design basis earthquake
Earthquake
Backfit
ML20138L2324 April 1985Forwards BNL Insp Rept Re Gap Allegations Concerning Region III Conduct During Plant Insps.Based on Review of BNL Recommendations,Two Allegations of Improper Conduct Valid. Technical Divs Will Reemphasize Insp Policy.W/O Encl
ML20140B6848 September 1981Notification of 811006 Meeting W/Util,Bechtel & Energy Technology Engineering Ctr in Bethesda,Md to Discuss Util Info Re Underground Piping at Facilities
ML20140B6908 September 1981Notification of 810925 Meeting W/Util,Bechtel,Corps of Engineers & Naval Surface Weapons Ctr in Bethesda,Md to Discuss Dynamic Model Used for Svc Water Intake Pump Structure
ML20140B7416 April 1982Forwards Branch SER Input.Sections 2.5.5 Re Stability of Slopes & 2.5.6 Re Embankment & Dams,Essentially Complete. Section 2.5.4 Re Stability of Subsurface Matls & Foundations,Remains Open & Impacted by ASLB HearingsUltimate heat sink
ML20140B7465 April 1982Forwards Structural Engineering Branch SER Input Re FSAR Chapter 3 on Design of Category I Structures.Evaluation Will Be Completed Upon Submittal of Info Re Soil Remedial Actions & New site-specific Response SpectraSafe Shutdown Earthquake
Operating Basis Earthquake
ML20140B7516 April 1982Forwards Geological & Seismological Input to SER for OLSafe Shutdown Earthquake
Earthquake
ML20140G82628 May 1982Forwards Project Status Rept for ACRS Subcommittee on Midland Plan 820602 Meeting in Washington,Dc to Review Application for Ol.Related Info Encl
ML20140G83515 April 1970Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Chicago,Il to Discuss Radioactive Matl in Process Steam,Potential for Subsidence,Seismic Design Criteria, Emergency Plans & Flood Protection Level
ML20140G84019 March 1970Forwards Summary of 700312 Meeting W/Util & Jt Wilson in Bethesda,Md Re Subsidence Problem Under Site.General Subsidence Could Occur,But Not Abrupt Offset.Abrupt Offset or Scarping Could Not Be Tolerated