Issue date | Title | Topic | |
---|---|---|---|
IA-85-213, Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR | 28 August 1984 | Comments on BNL Re Proposed Review of Concerns Expressed by Ee Kent.Nrc May Expand on Insp Previously Performed at Plant But Should Not Duplicate Work Already Performed by Region V & NRR | |
IA-85-602, Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | 26 April 1982 | Forwards Revised Schedule for ACRS Subcommittee on Midland Plant 820429 Meeting in Washington,Dc to Discuss Util Remedial Action Re Soils & Structural Settlement Issues. Related Info Encl | |
IA-87-778, Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | 15 February 1984 | Board Notification 84-024:forwards SECY-84-34 Re Emergency Diesel Generators Mfg by Transamerica Delaval,Inc.Staff Continuing Overall Assessment of Reliability of Diesel Engines | |
ML19289D156 | 10 January 1979 | Environ Rept (3 Vols) & FSAR (24 Vols) Will Be Sent to Wh Marshall, If Desired | |
ML20054E761 | 8 June 1982 | Discusses ACRS Interim Rept Re CP Application.Addl QA Info Requested.Recommendation Re full-power Operation Deferred Pending Review of Audit Plan | Safe Shutdown Systematic Assessment of Licensee Performance Earthquake Turbine Missile |
ML20054F567 | 15 June 1982 | Informs That Time for Commission to Act to Review ALAB-674 Expired.Commission Declined Review.Decision Became Final Agency Action on 820614 | |
ML20054G042 | 11 June 1982 | Notification of 820616 Meeting W/Util in Bethesda,Md to Discuss Addl Info Needed for Equipment Environ Qualification Audit | |
ML20054H129 | 8 June 1982 | Forwards Util to Bechtel Transmitting Quality Plan for Underpinning Activities,Relevant to Amend 3 to CPs | |
ML20054H395 | 9 June 1982 | Notification of 820615 Meeting W/Util in Bethesda,Md to Discuss Elements of Staff Review Schedule Being Developed for Soils Remedial Activities | |
ML20054H397 | 9 June 1982 | Notification of 820611 Meeting W/Util & Bechtel in Bethesda, MD to Resolve SER Open Item 3 on Tornado Missile Protection | Tornado Missile Protection |
ML20054H424 | 9 June 1982 | Notification of 820611 Meeting W/Util in Bethesda,Md to Clarify Encl 8 from NRC Re Soils Remedial Work | |
ML20054J031 | 22 June 1982 | Notification of 820628-30 Meetings W/Util & Bechtel in Bethesda,Md to Discuss Fire Protection & Safe Shutdown | Safe Shutdown |
ML20054J835 | 29 June 1982 | Advises That Previous Testimony by Region 3 Needs to Be Supplemented | |
ML20058F334 | 16 July 1982 | Notification of 820727 & 30 Meetings W/Util & Bechtel in Ann Arbor,Mi to Audit Design Calculations & Applicants Preparations for Remedial Activities Due to Soil Compaction Problems | |
ML20079R085 | 15 March 1978 | Forwards Feb Project Status Repts | |
ML20081M180 | 7 November 1983 | Requests to Be Informed of Status of QA Requests RT-0005, RT-0006 & RT-0007.Completion Date for QA Requests Is 831104 | |
ML20086Q106 | 15 February 1984 | Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview | |
ML20087N335 | 16 March 1984 | Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities | |
ML20090F363 | 29 March 1979 | Forwards Evaluation of Items Transmitted 790228 Re B&W Designed Nuclear Plants | |
ML20090F726 | 8 January 1979 | Submits Info on Possible Generic Safety Implications Re Difficulty of B&W Plants in Maintaining Pressurizer Level Indications During Transients | |
ML20125B317 | 8 June 1982 | Requests Svcs of L Abramson & D Lurie to Provide Technical Assistance in Assessment of CPC Statistical Approach to Testing Potentially Defective Protective Coating in Reactor Bldg | |
ML20125B519 | 7 December 1983 | Expresses Appreciation for Technical Assistance Offered by L Abramsom & D Lurie Re Containment Protective Coating Deficiency | Coatings |
ML20126L799 | 8 June 1981 | Forwards NRC Testimony for 810707 Evidentiary Hearing | |
ML20126L859 | 3 April 1979 | Requests That Items of Noncompliance Re Diesel Generator Bldg Settlement Be Given Technical & Legal Review & Determination Made on Materiality of FSAR Discrepancies | |
ML20126L864 | 9 August 1979 | Forwards Summary of Ofc of Nuclear Reactor Regulation Comments on Keppler 790403 Memo Re Backfill Deficiency | |
ML20127F764 | 24 September 1982 | Discusses Gap 820906 Comments on Interview W/Ee Kent, Former Welding Inspector at Plant.Errors in Ltr Noted. Handling of Allegations Described.Transcript of 820812 Interview Being Prepared | |
ML20127F798 | 3 March 1982 | Documents 820302 Telcon W/Ee Kent Re Allegations Concerning Welding Deficiencies at Plant.Details of Allegations Stated.Region III Committed to Insp of Welds | |
ML20127F821 | 4 March 1982 | Documents 820302 Telcon W/Ee Kent to Gather Addl Info Re Allegations of Weld Deficiencies at Plant.Allegedly Unacceptable Welds Identified.Disagreements W/Welding Specs Noted.Info Given to R Cook,Resident Inspector | |
ML20127F842 | 5 March 1982 | Documents Info Developed Concerning Ee Kent Allegations Re Weld Deficiencies at Plant.Kent Not Qualified to Inspect Welds.Deficiencies in Welds Inspected by Morris Discussed. Welds Described by Kent Acceptable | Nondestructive Examination |
ML20127F881 | 22 March 1985 | Documents 820317 Telcons W/B Stamaris & Ee Kent Re Allegations of Welding Deficiencies at Plant.Region III Insps Described,Indicating Welds Acceptable.Kent Disagreed. ASME Code Re Socket Weld Engagement Discussed | |
ML20127F909 | 22 March 1982 | Documents 820317 Contact W/R Vandenbosch Re Ee Kent Allegations Concerning Weld Deficiencies at Plant.Past Problems W/Welding Program Identified & Corrected. Vandenbosch Confident in Present Program | |
ML20127F928 | 30 September 1982 | Documents 820922 Telcon W/B Garde Re Ee Kent Allegations. Inspector Identified W/New Info on Welding Deficiencies Will Be Contacted.B Garde Will Request Independent Audit of Welding Activities.Related Info Encl | Earthquake |
ML20127F970 | 20 February 1985 | Forwards BNL Insp Rept Re Allegations 19 & 20 of Employment Discrimination by Bechtel at Plant,For Info.Ch Weil 850327 Handwritten Note Included.W/O Rept | |
ML20127F995 | 20 February 1985 | Forwards BNL Rept Re Ee Kent Allegations at Midland Plant. Info Re San Onofre Discovered in Course of Review | |
ML20128G762 | 28 June 1985 | Staff Requirements Memo Re 850620 Affirmation/Discussion & Vote in Washington,Dc.Edo & RES Should Forward Fr Notice Re Approved Final Rule on Pressurized Thermal Shock for Signature & Publication | |
ML20132C955 | 12 April 1985 | Forwards B Garde Requesting Commissioners to Appoint ASLB Member to Review,Investigate & Issue Findings Re NRC Handling of E Kent Allegations.Info Supplemental to Previous Board Notifications 82-117 & 83-102 | |
ML20133C405 | 8 December 1977 | Forwards NRR Evaluation & Position Re Moisture Controls of Low Hydrogen Covered arc-welding Electrodes.Position Can Be Applied as Acceptable Method for Moisture Control.W/O Evaluation & Position.Supporting Documentation Encl | |
ML20133D109 | 4 February 1977 | Forwards 770128 Request for Addl Info Re ACRS 761201 Supplemental Rept on Midland.Supplemental Rept Encl. Discussion in 770210-12 Meeting & Possible Action During Mar 1977 Full Committee Meeting Planned | |
ML20133F395 | 7 October 1985 | Board Notification 85-086:suppls Board Notifications 82-117, 83-102 & 85-045 Re welding-related Allegations at Midland 1 & 2.H Wahl (Bechtel) 850916 Summary of Developments in Suit Filed Re E Kent Allegations & Encl | |
ML20133G128 | 3 May 1985 | Advises of ASLB Support of All Seismic Conclusions Except Definition of Tectonic Province.Board Found Staff Placed Too Much Reliance Upon Seismicity in Definition of Tectonic Province within Which Site Lies | Earthquake |
ML20137E148 | 1 September 1982 | Submits Background Info on Seismic Issues Re Facility. Changes in Seismic Analyses & SSE Discussed.Description of Changes in NRC Analytical Appproach & Criteria Affecting Facility SSE Encl | Safe Shutdown Safe Shutdown Earthquake Operating Basis Earthquake Design basis earthquake Earthquake Backfit |
ML20138L232 | 4 April 1985 | Forwards BNL Insp Rept Re Gap Allegations Concerning Region III Conduct During Plant Insps.Based on Review of BNL Recommendations,Two Allegations of Improper Conduct Valid. Technical Divs Will Reemphasize Insp Policy.W/O Encl | |
ML20140B684 | 8 September 1981 | Notification of 811006 Meeting W/Util,Bechtel & Energy Technology Engineering Ctr in Bethesda,Md to Discuss Util Info Re Underground Piping at Facilities | |
ML20140B690 | 8 September 1981 | Notification of 810925 Meeting W/Util,Bechtel,Corps of Engineers & Naval Surface Weapons Ctr in Bethesda,Md to Discuss Dynamic Model Used for Svc Water Intake Pump Structure | |
ML20140B741 | 6 April 1982 | Forwards Branch SER Input.Sections 2.5.5 Re Stability of Slopes & 2.5.6 Re Embankment & Dams,Essentially Complete. Section 2.5.4 Re Stability of Subsurface Matls & Foundations,Remains Open & Impacted by ASLB Hearings | Ultimate heat sink |
ML20140B746 | 5 April 1982 | Forwards Structural Engineering Branch SER Input Re FSAR Chapter 3 on Design of Category I Structures.Evaluation Will Be Completed Upon Submittal of Info Re Soil Remedial Actions & New site-specific Response Spectra | Safe Shutdown Earthquake Operating Basis Earthquake |
ML20140B751 | 6 April 1982 | Forwards Geological & Seismological Input to SER for OL | Safe Shutdown Earthquake Earthquake |
ML20140G826 | 28 May 1982 | Forwards Project Status Rept for ACRS Subcommittee on Midland Plan 820602 Meeting in Washington,Dc to Review Application for Ol.Related Info Encl | |
ML20140G835 | 15 April 1970 | Submits Agenda for ACRS Subcommittee on Midland Plant 700424 Meeting in Chicago,Il to Discuss Radioactive Matl in Process Steam,Potential for Subsidence,Seismic Design Criteria, Emergency Plans & Flood Protection Level | |
ML20140G840 | 19 March 1970 | Forwards Summary of 700312 Meeting W/Util & Jt Wilson in Bethesda,Md Re Subsidence Problem Under Site.General Subsidence Could Occur,But Not Abrupt Offset.Abrupt Offset or Scarping Could Not Be Tolerated |