ML20079R085
From kanterella
Jump to navigation
Jump to search
ML20079R085 | |
Person / Time | |
---|---|
Site: | Midland, 05000000 |
Issue date: | 03/15/1978 |
From: | Martinex P BECHTEL GROUP, INC. |
To: | Cooke T, Keeley G, Newgen J BECHTEL GROUP, INC. |
Shared Package | |
ML20079E080 | List: |
References | |
FOIA-83-579 NUDOCS 8402020046 | |
Download: ML20079R085 (1) | |
Category:ANY EXTERNAL MEMORANDUM ROUTED TO NRC & NOTES
MONTHYEARML20237K1901987-08-17017 August 1987
[Table view]Forwards Rev 10 to Northeast Utilities QA Program (Nuqap) Topical Rept. Wv Johnston Ack Receipt & Accepting Rev to Rept & Ej Mroczka Forwarding Rev Encl ML20087N3351984-03-16016 March 1984 Summarizes 840305 Meeting in Glen Ellyn,Il Re Approval of Const Completion Program Phase I Activities to Support Turbine Roll Milestone.Meeting Provided Addl Info to Suppl 840215 Request for Release of Phase I Activities ML20086Q1061984-02-15015 February 1984 Forwards New Index for Const Implementation Overview Procedures & Instructions & Rev 3 to Third-Party Cost Implementation Overview ML20081M1801983-11-0707 November 1983 Requests to Be Informed of Status of QA Requests RT-0005, RT-0006 & RT-0007.Completion Date for QA Requests Is 831104 ML20081L7081983-03-22022 March 1983 Forwards Complete List of Snubbers in Drywell Reviewed for Removability & Accessiblity.Total of 100 Snubbers Reviewed ML20072L6991982-09-27027 September 1982 Discusses March Analysis of Hydrogen Burn During Degraded Core Accidents for Facilities.Detailed Comparisons of Facility Design Parameters W/Gessar & Grand Gulf Encl ML20072T3501982-06-0303 June 1982 Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117).Proposed Resolutions Listed.Notice of Violation & Excavation Plan Encl ML20072T3601982-04-16016 April 1982 Discusses Results of ASME Code Review of Questions on Containment Penetration/Plate Welds (Pullman-Higgins Nonconformance Rept 2117),per 820415 Meeting.Proposed Resolutions Listed.Related Info Encl ML18046B2891982-02-0404 February 1982 Advises That Encl Cover Sheets Should Be Placed in Appropriate Binders of Security Plans,Safeguards Contingency Plans & Suitability,Training & Qualification Plans.Encl Withheld (Ref 10CFR73.21) ML20058B6691981-10-22022 October 1981 Responds to Concerns Re Inst of Transportation Engineers Journal Article Examining Various Approaches to Emergency Evacuation Planning & Analyzing PRC Voorhees Methodology Utilized for Facilities ML20071F1921981-06-0909 June 1981 Forwards 810602 Rept Re Feedwater Pump Trip Compiled by F Witkowsky & J Daugherty.Handwritten Notes on Various Subjs Encl ML20062P0441980-01-10010 January 1980 Discusses B&W Overfeed Transient Analysis Using IRT Deck Simulating Facilities.Figures 1-9 Re Computed Transient Results Encl ML20094H6591979-04-0909 April 1979 Submits Const QC Response to 790329 Questions Re Diesel Generator Bldg.No Variance Exists from QA Program Requirements ML20093N7371978-12-12012 December 1978 Provides Trip Rept for 781107 Meeting in Urbana,Il Re Settlement of Far East Bay of Diesel Generator Bldg.List of Correction Action Options Provided ML20024C5751978-05-0505 May 1978 Notification of B&W Users Group 780509 Meeting to Discuss once-through Steam Generator Tube Program & Secondary Side Water Chemistry ML20079R0851978-03-15015 March 1978 Forwards Feb Project Status Repts ML20077S3401978-02-0606 February 1978 Discusses Continued Use of Furmanite in DHV-1 at Facility. Continued Use of Furmanite for Addl Yr Supported ML20077S3271977-03-11011 March 1977 Discusses Generation Engineering Decision Not to Disassemble Decay Heat Valve DHV-1 During 1977 Refueling Outage. Recommends That Visual Surveillance of Valve Be Reduced to Once Per Month After 1977 Refueling Outage ML20094H6721974-09-13013 September 1974 Comments on Recommendations Given in Soils Repts Prepared by Dames & Moore as Compared to Bechtel Earthwork Specs. Plant Area Fill Supporting Surrounding Structures,Category I Slopes & Berm Fill Discussed ML20054C9861974-06-0404 June 1974 Summary of 740604 Meeting W/Aec in Bethesda,Md Re Application for OL.Hoskins-Griffith Fault Discussed 1987-08-17 Category:INTERNAL OR EXTERNAL MEMORANDUM MONTHYEARML20033E2411990-03-0505 March 1990
[Table view]Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20011F7171990-03-0202 March 1990 Notification of 900313 Meeting W/Util in Rockville,Md to Discuss Plans by Util to Request Tech Spec Change to Increase Allowable Unidentified RCS Leakage Rate from 1 Gpm to 3 Gpm ML20012A9351990-02-28028 February 1990 Advises That Ja Hammer Sucessfully Completed All Requirements for Certification as Operator License Examiner & Is Qualified to Perform Operator Licensing Exams at GE BWR Facilities ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20006D7831990-02-0808 February 1990 Advises That Board Concluded That Holding Prehearing Telcon Re Scheduling Considered Premature Due to Lack of Record,Per .Request for Future Scheduling Suggested to Be Submitted.W/Certificate of Svc.Served on 900209 ML20006C4491990-02-0101 February 1990 Requests Telephone Conference Be Set Up at Board Convenience Due to Author Not Being Able to Reach Licensee Counsel ML20006C7501990-02-0101 February 1990 Notification of Significant Licensee Meeting 90-13 on 900208 W/Licensee in Region I Ofc to Discuss Nuclear Safety Concerns Program Enhancements ML20006C4621990-01-26026 January 1990 Responds to 900117 Joint Request on How NRC & Applicant Counsel Expect to Move Proceeding on Hearing Calendar in New Yr.Applicant Has Expressed Desire to Have Proceeding Held in Abeyance Indefinitely Although NRC Does Not Agree ML20006A0231990-01-17017 January 1990 Requests Info,Within 10 Days,On How to Move Proceeding on Hearing Calendar in New Yr.Certificate of Svc Encl.Served on 900118 ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246C9811989-05-0303 May 1989 Provides Update of 881122 Low Power License Recommendation for Plant,Reporting Closure of Technical Issue Associated W/ Agastat 7000 Series Relays.Advises of Plant Readiness to Conduct Initial Criticality & Low Power Testing Operations ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20117P9051988-12-15015 December 1988 Forwards Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, for Region I Plants for Semiannual Status Rept ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20246C9601988-11-22022 November 1988 Provides Update to Original Region I Assessment & Recommendation for Issuance of Low Power OL for Plant. Advises That Region I Continues to Recommend Low Power OL Issuance for Plant W/Special Note of Items Listed ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20246C9761988-11-17017 November 1988 Discusses Team Insp at Plant to Review Licensee Assessment of Readiness to Achieve Initial Criticality & to Complete Low Power Testing.Licensee Conclusions Re Facility Overall Readiness to Conduct Power Operation Confirmed ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC ML20206J5571988-11-0909 November 1988 Forwards NRC Review & Evaluation of Facilities Security Plans Discussing Equipment & Procedures Used by Applicant to Meet Requirements in 10CFR95.W/o Encl ML20195G2581988-11-0808 November 1988 Partially Deleted Memo Re Commissioner Carr 880113-15 Visit to Plant,Meeting W/State of Mo Officials & Visit to Mallinckrodt,Inc ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule 1990-03-05 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20033E2411990-03-0505 March 1990
[Table view]Notification of 900307 Meeting W/Ge in Rockville,Md to Discuss Potential Power Reactor Upgrades ML20011F7171990-03-0202 March 1990 Notification of 900313 Meeting W/Util in Rockville,Md to Discuss Plans by Util to Request Tech Spec Change to Increase Allowable Unidentified RCS Leakage Rate from 1 Gpm to 3 Gpm ML20012A9351990-02-28028 February 1990 Advises That Ja Hammer Sucessfully Completed All Requirements for Certification as Operator License Examiner & Is Qualified to Perform Operator Licensing Exams at GE BWR Facilities ML20055C3521990-02-26026 February 1990 Notification of 900305 Meeting W/Util in Rockville,Md to Discuss Status of Licensing Activities for Facility ML20006D7831990-02-0808 February 1990 Advises That Board Concluded That Holding Prehearing Telcon Re Scheduling Considered Premature Due to Lack of Record,Per .Request for Future Scheduling Suggested to Be Submitted.W/Certificate of Svc.Served on 900209 ML20006C4491990-02-0101 February 1990 Requests Telephone Conference Be Set Up at Board Convenience Due to Author Not Being Able to Reach Licensee Counsel ML20006C7501990-02-0101 February 1990 Notification of Significant Licensee Meeting 90-13 on 900208 W/Licensee in Region I Ofc to Discuss Nuclear Safety Concerns Program Enhancements ML20006C4621990-01-26026 January 1990 Responds to 900117 Joint Request on How NRC & Applicant Counsel Expect to Move Proceeding on Hearing Calendar in New Yr.Applicant Has Expressed Desire to Have Proceeding Held in Abeyance Indefinitely Although NRC Does Not Agree ML20006A0231990-01-17017 January 1990 Requests Info,Within 10 Days,On How to Move Proceeding on Hearing Calendar in New Yr.Certificate of Svc Encl.Served on 900118 ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20248C8311989-09-20020 September 1989 Request for Hearing by Alchemie.* Forwards Response & Request for Hearing,In Response to NRC 890818 Order Modifying License & Order to Show Cause Why Licenses Should Not Be Revoked,For Appropriate Action ML20247H9261989-09-0909 September 1989 Advises That SALP Meeting for Facilities Scheduled for 891115.Assessment Input Should Be Submitted by 891016 ML20245E8501989-08-0707 August 1989 Advises of Reassignments in Project Mgt Duties Due to Recent Reorganization of Standardization & Life Extension Project Directorate ML20245H6451989-08-0404 August 1989 Requests Closure of Outstanding Action Item 87-0198,per 870617 Request Re Review & Evaluation of Acceptability of Fairbanks-Morse Diesel Generator Bearings.Action Completed W/Submittal of Transfer of Lead Responsibility to NRR ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247B7541989-07-19019 July 1989 Confirms That Licensee 880711,890221 & 0630 Responses to NRC Bulletin 88-004, Potential Safety-Related Pump Loss, Acceptable.Licensing Action for TACs 69886,69887,69893 & 69894 Considered Complete ML20247E6721989-07-17017 July 1989 Proposes Closeout of Plant Correspondence Control Ticket Re Environ Conservation Organization Request for Notification Whenever License Amend Requests Result in Impairment of Plant Operability.Intervenor Will Be Placed on Svc List ML20246K5991989-07-12012 July 1989 Notification of 890725 Meeting W/Util in Birmingham,Al to Discuss Status of Current Licensing Activities & Corporate Initiatives for Plants.Meeting Agenda Encl ML20246L6801989-07-10010 July 1989 Notification of Significant Licensee Meeting 89-101 W/Util on 890718 in King of Prussia,Pa to Discuss Util Engineering Reorganization ML20247A9561989-07-0606 July 1989 Notification of 890717 Meeting W/Lead Plant Utils in Rockville,Md to Discuss Implementation of Revised STS ML20246D8841989-06-19019 June 1989 Staff Requirements Memo Re 890601 Briefing on Operating Reactors & Fuel Facilities in Rockville,Md.Commission Expressed Disappointment in Long Term Operating Performance of Turkey Point Nuclear Power Plant ML20042D1901989-06-0808 June 1989 Memorandum Forwarding Partially Deleted Summary of Discussions During NRC 890517-18 Mgt Meeting Re Problem Plants & Addl Topics.Task Assignments & List of Attendees Also Encl ML20246H3771989-05-12012 May 1989 ALAB-913.* Advises That Time Provided within Which Commission May Act to Review Aslab Decision ALAB-913 Expired.Commission Declined Review.Decision Became Final on 890501.W/Certificate of Svc.Served on 890512 ML20246P9601989-05-10010 May 1989 Discusses 890413 Meeting W/Rosemount & Industry Re Malfunctions of Rosemount Transmitters.List of Attendess, Agenda,Nrc Info Notice 89-042 & Viewgraphs Encl ML20246C9811989-05-0303 May 1989 Provides Update of 881122 Low Power License Recommendation for Plant,Reporting Closure of Technical Issue Associated W/ Agastat 7000 Series Relays.Advises of Plant Readiness to Conduct Initial Criticality & Low Power Testing Operations NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 ML20245E9781989-04-17017 April 1989 Forwards Regulatory History AC83-2 Re Licensee Action During Natl Security emergency,10CFR50 (54FR7178) ML20245B7501989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6531989-04-15015 April 1989 Forwards Evaluation Rept on BWR Overfill Events Resulting in Flooding of Steam Lines.Events Determined to Involve Deficiencies in Control Sys ML20245B6421989-04-15015 April 1989 Forwards Engineering Evaluation Rept on BWR Overfill Events Resulting in Steam Line Flooding.Though Little Actual Damage Experienced,Potential for Equipment Damage Believed to Exist & Any Damage Occurring Should Be Fixed Prior to Restart ML20245B6191989-04-15015 April 1989 Forwards Evaluation Rept Re BWR Overfill Events Resulting in Steam Line Flooding.All Events Included Reactor Depressurization Followed by Uncontrolled Condensate or Condensate Booster Pumps Injection or Both ML20244E2681989-04-12012 April 1989 Summary of Operating Reactors Events Meeting 89-015 on 890412.Discussion of Events,List of Attendees & Three Significant Items Identified for Input Into NRC Performance Indicator Program & Summary of Reactor Scrams Also Encl ML20244A5571989-04-10010 April 1989 Notification of 890502 Meeting W/Util in Rockville,Md to Discuss Nonlinear Piping Analysis to Remove Snubbers & Pipe Supports ML20244A5461989-04-10010 April 1989 Notification of 890503 Meeting W/Util in Rockville,Md to Discuss Using Leak Before Break Methodology on Lines Connected to RCS ML20247B7351989-03-24024 March 1989 Notification of 890503 Meeting W/B&W,Inel & Util in Rockville,Md to Discuss Licensing Submittals for Plants ML20236A9721989-03-0707 March 1989 Forwards Feb 1989 Status Rept Re Current Review Milestones for Each Std Plant Project ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20246N3171989-02-23023 February 1989 Notification of 890313 Meeting w/C-E in Rockville,Md to Discuss Results of Salem Project & Licensing of Future C-E Projects NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20245E9441989-01-31031 January 1989 Forwards Proposed plant-specific Backfit for Improved Auxiliary Feedwater Sys Reliability Analyses for Required Improvement in Secondary DHR Capability at Plant ML20117P9051988-12-15015 December 1988 Forwards Info Re IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings, for Region I Plants for Semiannual Status Rept ML20196C2701988-12-0202 December 1988 Notification of 881207 Meeting W/Util in Rockville,Md to Discuss Dcrdr Submittal of 880825 ML20196B6081988-11-29029 November 1988 Forwards Status Rept for Nov 1988 Re Std Plant Design Technical Reviews ML20206M9231988-11-23023 November 1988 Lists Questions Raised by Board Study of Licensee Environ Repts on Facilities,For Responses & Comments.Served on 881125 ML20246C9601988-11-22022 November 1988 Provides Update to Original Region I Assessment & Recommendation for Issuance of Low Power OL for Plant. Advises That Region I Continues to Recommend Low Power OL Issuance for Plant W/Special Note of Items Listed ML20195J0141988-11-22022 November 1988 Notification of 881214 Meeting W/Util in Rockville,Md to Discuss Licensing Actions at Plants ML20246C9761988-11-17017 November 1988 Discusses Team Insp at Plant to Review Licensee Assessment of Readiness to Achieve Initial Criticality & to Complete Low Power Testing.Licensee Conclusions Re Facility Overall Readiness to Conduct Power Operation Confirmed ML20206J6441988-11-16016 November 1988 Requests Responses to Listed Questions Re Proceeding, Including Explanation of Environ Consequences Caused by Movement of Centrifuges from State of Oh to State of Tn. Served on 881117 ML20206E6361988-11-14014 November 1988 Forwards Fr Notice Re Applications for Amends to Licenses DPR-51,NPF-6 & NPF-38,authorizing Addition of Sys Energy Resources,Inc as Licensee & Requests Comments on Antitrust Issues ML20206J5741988-11-10010 November 1988 Forwards H Thompson as Balance of NRC Response to State of Tn Re Enrichment of Naturally Occurring Radionuclides in Proposed Facilities,Per NRC 1990-03-05 |
Text
.
/
/
/
I MEMO FROM P, A. MARTINEZ 4,...
r TO:
DATE T. C. Cooke (4) j G. S. Keeley (4) 1 J. F. Newgen (2)
These are advance copies
(
of the February Project Status reports for the Status meeting on Friday.
P. A. Martinez /pp March 15, 1978.
- l} f. Jc>t24 7
/,/ !//!-(
Q. C /I'(M ' ~
l' t ' ' l Cl ' 'I - (
rp i
/ sit kI r? b (,
/
8402020046 831104 PDR FOIA ZACK83-579 PDR
\\
Retrieved from "https://kanterella.com/w/index.php?title=ML20079R085&oldid=4384685"