Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
HNP-06-067, HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ Emails30 April 2006HNP-06-067, FAQs Requesting Additional Guidance or Clarification Regarding Transition to NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants. April 2007 FAQ EmailsFire Protection Program
HNP-06-101, Email to B. Mozafari from Harris Nuclear Plant Correcting LER 2005-04-00 to Licensee Event Report 2006-00-00.1 August 2006Email to B. Mozafari from Harris Nuclear Plant Correcting LER 2005-04-00 to Licensee Event Report 2006-00-00.
L-2019-014, NRR E-mail Capture - (External Sender) Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - State Response7 July 2020NRR E-mail Capture - (External_Sender) Request for State Comments - Regarding Proposed Amendment to Revise the Catawba, Unit 1, Technical Specification (TS) 3.4.3, RCS Pressure and Temperature (P/T) Limits - State Response
ML0203901337 February 2002Electronic Version of Technical Specifications
ML02122013013 March 2002Admin Error in TS
ML0218906286 June 2002Attachment, E-Mail Dated June 6, 2002
ML02240077410 January 2002E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report
ML02240078118 January 2002E-mail from Jacob Zimmerman, Bulletin 2001-01 Status Report
ML0224007981 February 2002E-mail from Beth Wetzel Bulletin 2001-01 Status Report
ML0224601026 February 2002E-mail from J Chung, NRR to Fm Reinhart, NRR, PRA Perspective in Technical Assessment ReportBoric Acid
Non-Destructive Examination
Weld Overlay
Probabilistic Risk Assessment
VT-2
Large early release frequency
Stress corrosion cracking
Eddy Current Testing
Fuel cladding
Pressure Boundary Leakage
Through-Wall Leakage
ML02308011124 September 2002E-Mail Regarding Request for Additional Information Re Proposed Addition of Methodology References to Core Operating Limits for Shearon Harris Nuclear Power Plant
ML03071016710 March 2003G20030079/LTR-03-0091 - Mario V. Bonaca Ltr. Re McGuire Nuclear StationLicense Renewal
ML0310703436 March 2003/Data Cover SheetLicense Renewal
ML0310703516 March 2003FW: Robinson Gross Generation 01 02 (Table)
ML03107035711 March 2003F.W. Robinson Emailing: - Emailing: peedee2K1
ML03107036814 March 20032003 Federal Bird Permit, Dated 2/28/03, E-mail Date: 3/14/03 (Cvr. Sheet)
ML03107039719 March 2003Cost of Replacement of Yokes
ML03107041025 March 2003750 and 751 Cost Benefit Rev3.doc Dated 03/25/2003 (Data W/Table) (Robinson Nuclear Plant RHR Valves 750 and 751)Design basis earthquake
Earthquake
ML03107042125 March 2003750 and 751 Cost Benefit Rev 3.doc (Cvr. Sheet) March 25, 2003
ML03107045226 March 2003Document 2 Dated 03/26/2003
ML0310704633 April 2003Radiant Energy Shield SAMA, Dated 4/3/03
ML0310704728 April 2003IPEEE Fire Analysis, Dated 04/08/2003
ML03133078412 May 2003E-mail - Clarification of RAI Response and NRC RAI Question ResponseWeld Overlay
Coatings
Moisture barrier
License Renewal
ML03161101810 June 2003RNP Telecon Summary on 06/09/03
ML03182026419 May 2003Discussion Points for SG Tube Inspection Call
ML0318204416 March 2003Email Dated March 6, 2003, from Dr. Ed Siegel to A. Hiser, W. Bateman, and T. Chan, Fwd: Fyi: Questions? Comments?Boric Acid
Weld Overlay
Coatings
Earthquake
ML03197058825 June 2003CVR E-mail Note Dated, June 25, 2003 Dam Release and Carolina Power and Light Co. Robinson/Darlington County Fossil Generating Plant, Title: Robinson Impoundment Operation, Rev. 5, Dated: July 15, 1999
ML03216043625 June 2003E-Mail from L. England to Jan Kozyra Dam Releases
ML0324606758 February 2002E-mail FSARsLicense Renewal
ML0324606798 February 2002E-mail FSARsLicense Renewal
ML0324606888 February 2002E-mail FSARsLicense Renewal
ML03246131029 March 2002E-mail Davis-Besse Head Degradation Review ItemsBoric Acid
ML03246144824 April 2002E-mail J. Medoff, NRR, to NRR Inforeview, Fwd NUREG-1759
ML03246145725 April 2002E-mail NRR Inforeview to Pubs, NUREG-1437, Supplement 8License Renewal
ML03247003430 April 2002E-mail NRR Inforeview to Pubs, NUREG-1437, Supplement 9License Renewal
ML03247006530 April 2002E-mail M. Katzalas, NRR, to J. Wilson, NRR, Sensitive Information Review for Catawba DseisLicense Renewal
ML0324700802 May 2002E-mail J. Wilson, NRR, to C. See, M. Kotzalas, W. Reckley, NRR, Fwd NUREG-1427, Suppl. 9
ML03301030225 July 2002E-mail from J. Lenahan to G Wiseman Regarding 95001 Inspection of Harris Fire Protection Finding (Rpt #400/02/08)Safe Shutdown
Fire Barrier
Significance Determination Process
Preliminary White Finding
Fire Protection Program
Manual Operator Action
ML03301034313 August 2002E-mail from C. Ogle to C. Casto and H. Christensen Regarding Resolution of Harris Thermolag Issue
ML03301034419 August 2002E-mail from C. Ogle to J. Isom Regarding Guidance on Dealing with Manual Actions in III.G.2 Fire Areas
ML03302003613 February 2003E-mail from C. Ogle to C Castro and H. Christensen Regarding Call from HarrisHot Short
Safe Shutdown
Boric Acid
Loop seal
Fire Barrier
Operator Manual Action
Emergency Lighting
Significance Determination Process
Fire Protection Program
Fire Watch
Downpower
Manual Operator Action
ML0330200407 July 2003E-mail from C. Payne to C. Ogle Regarding McGuire 2003-08 Tfpi Report DraftHot Short
Safe Shutdown
Unanalyzed Condition
High Radiation Area
Offsite Dose Calculation Manual
Fire Barrier
Enforcement Discretion
Temporary Modification
Emergency Lighting
Locked High Radiation Area
Significance Determination Process
Fire Protection Program
Fire Watch
Backfit
Manual Operator Action
ML0330200418 July 2003E-mail from C. Ogle to P. Fillion and T. Mckenzie Regarding Comments on McGuire IR-03-07Hot Short
Safe Shutdown
Unanalyzed Condition
Fire Barrier
Hydrostatic
Emergency Lighting
Significance Determination Process
Job Performance Measure
Fire Protection Program
Fire Watch
Backfit
Manual Operator Action
ML0332503887 August 2002E-mail from L. Whitney to C. Ogle, Manual Actions at Harris
ML03325039214 August 2002E-mail from E. Weiss to C. Ogle, Manual Actions Speech
ML0332503959 September 2002E-Mail from E. Connell to C. Ogle & P. Koltay Sh IIIG2 ComplianceEnforcement Discretion
ML0332503979 September 2002E-mail from P. Koltay to C. Ogle, Sh IIIG2 ComplianceEnforcement Discretion
ML03345039311 December 2003Draft Letter Requesting Additional Information on MOX LTA Fuel at Catawba
ML0335604173 February 2003E-Mail from Charles Ogle to Charlie Payne Re Harris FP Inspection SummaryHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Emergency Lighting
Hemyc
Manual Operator Action
ML03356042031 January 2003E-Mail from Charles Ogle to George Macdonald Re Revised Fire Protection Writeup to Reflect Latest Change to Harris ReportEmergency Lighting
Fire Protection Program