From:

Kenneth Chang To:

Skm1 Date:

6/10/03 12:43PM

Subject:

RNP Telecon Summary on 6/9/03 S.K.,

The following summarizes our telephone conference with Roger Steward of RNP:

1. The staff is concerned regarding when we will be able to receive Robinsons responses to metal fatigue TLAA and AMP questions on the fw-aux.fw tee and the pressurizer surge line/nozzle discussed in the audit conducted on 5/28 and 5/29 at the Robinson site. Roger responded that the write-up is currently in the review and approval process and will be submitted on 6/13 as promised. He can send a draft copy within the day, which was accepted by the staff.
2. Roger also clarified that the spent fuel (7110) system referred inthe AMP Table for structural/components requiring one-time inspection is the "spent fuel cooling system" described in LRA section 2.3.3.9. There is only one system describing "spent fuel".

Ken Chang CC:

Yueh-Li Li Accession Number: ML031611018