MONTHYEARML24029A1132024-01-16016 January 2024 Notification of Inspection and Request for Information (Email) ML23271A1792023-09-28028 September 2023 Request for Confirmation License Amendment Application to Revise Control Room Cooling TS 3.7.11 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23192A0552023-07-11011 July 2023 Relief Request Later Edition of ASME Code for ISI ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications ML23172A0132023-06-20020 June 2023 Duke Fleet - Correction to June 2, 2023, Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23153A1892023-06-0202 June 2023 Duke Fleet - Request for Additional Information Proposed License Amendment Request to Revise Restrictive Surveillance Requirement Frequencies ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23124A1212023-05-0404 May 2023 Acceptance of Requested Licensing Action Duke Fleet Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23087A0282023-03-27027 March 2023 Acceptance of Requested Licensing Action Amendment TSTF-505 ML23087A2492023-03-27027 March 2023 50.69 Acceptance Email ML23080A1892023-03-20020 March 2023 RP Inspection Document Request ML23073A2282023-03-13013 March 2023 Duke Fleet- Adoption of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements - Acceptance Review ML23058A0562023-02-27027 February 2023 Acceptance of Amendment to Revise Surveillance Frequencies for RCS Pressure Isolation Valve Operational Leakage Testing and Reactor Trip System Instrumentation ML23048A1512023-02-16016 February 2023 Acceptance Review - Proposed Alternative for Steam Generator Welds (L-2023-LLR-0003) ML23030B9032023-01-30030 January 2023 Formal Release of RAIs for McGuire Unit 1, Relief Request Impractical RPV Rx Coolant System Welds, Due March 1, 2023 (Email) ML23017A2232023-01-13013 January 2023 Request for Additional Information (RAI) Issuance for McGuire Unit 1 Steam Generator Tube Inspection Report (Email) ML22336A0692022-11-28028 November 2022 Final 2023 Catawba Nuclear Station (CNS) Commercial Grade Dedication (CGD) Inspection Information Request ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22291A4602022-10-17017 October 2022 Relief Request Impractical RPV and Rx Coolant Sys. Welds NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) ML22242A1602022-08-30030 August 2022 Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results ML22213A0472022-08-0101 August 2022 Document Request for Catawba Nuclear Station - Radiation Protection Inspection - Inspection Report 2022-03 NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22154A1312022-06-0303 June 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2 - Request for Additional Information Environmentally-Assisted Fatigue License Renewal Commitment ML22174A0802022-06-0101 June 2022 Transmittal External Distribution Notification TR-NUC-CN-014344 - SLC Manual Revision to Loes and SLC 16.7-5 ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML22083A0702022-03-24024 March 2022 NRR E-mail Capture - Catawba Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, and McGuire Nuclear Station, Units 1 and 2 - Acceptance Review for TSTF-569 LAR ML22049B0152022-02-17017 February 2022 NRC RP Inspection Document Request Letter ML22041A5312022-02-10010 February 2022 NRR E-mail Capture - Catawba Nuclear Station Unit 2 - Acceptance of Requested Licensing Action Use of Alternative Requirements of ASME Code for Embedded Flaw Repair Method on Reactor Vessel Closure Head Penetration 74 EPID L-2022-LLR-0010 ML22038A1572022-02-0707 February 2022 NRR E-mail Capture - Duke Energy Fleet - Acceptance of License Amendment Request Regarding Adoption of TSTF-541, Revision 2 ML22024A3952022-01-24024 January 2022 Acceptance of Requested Licensing Action Amendment McGuire RCS PT Limits Change TS 3.4.3 and EFPY Changes ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22024A1112022-01-0707 January 2022 E-mail Capture- Catawba POV Inspection Information Request (1) ML21361A0122021-12-23023 December 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Relocate Emergency Operations Facility ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21335A2252021-12-0101 December 2021 NRR E-mail Capture - Catawba Nuclear Station, Unit 2 - Request for Additional Information Spring 2021 Steam Generator Tube Inspection Report (L-2021-LRO-0043) ML21286A7812021-11-22022 November 2021 Acceptance of Requested Licensing Action Revision to the End of Cycle Moderator Temperature Coefficient Measurement Methodology ML21295A0372021-10-0505 October 2021 NRR E-mail Capture - Accepted for Review - Duke Energy Fleet License Amendment Request to Adopt TSTF-577 Revised Frequencies for Steam Generator Tube Inspections ML21252A0532021-09-0808 September 2021 NRR E-mail Capture - Formal Release of Rais, 30 Day Response, Mcguire Relief Request, Ref: Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21195A2022021-07-14014 July 2021 NRR E-mail Capture - McGuire Relief Request Acceptance Review Results; McGuire Unit 1 RR, Later Edition Addenda ASME Code, Section XI, 50.55a(g)(4)(iv) ML21189A2502021-07-0202 July 2021 NRR E-mail Capture - Acceptance Review: Duke Energy - Proposed Alternative to Use ASME Code Case N-885 for Catawba Nuclear Station Unit 2 - EPID: L-2021-LLR-0043 ML21117A1292021-04-26026 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request RA-21-0145 ML21117A1232021-04-23023 April 2021 NRR E-mail Capture - Catawba Verbal Relief Request Request for Additional Information ML21117A1222021-04-23023 April 2021 NRR E-mail Capture - (External_Sender) Catawba Nuclear Station Relief Request RA-21-0133 ML21103A0542021-04-13013 April 2021 NRR E-mail Capture - Extension to Request for Additional Information AMS Topical Report AMS-TR-0720R1 ML21099A0742021-04-0909 April 2021 CAT_2021-02 Document Request for Upcoming RP Inspection ML21096A3002021-04-0606 April 2021 E-mail for Approval of Proprietary Withholding for Duke Energy Exemptions for the Magnastor Storage Cask 2024-01-16
[Table view] |
Text
From: Isabelle Schoenfeld To: Rani Franovich; Sam Duraiswamy Date: 3/10/03 9:26AM
Subject:
Re: Action Item 20030079 (McGuire and Catawba license renewal ACRS letter)
Hi Rani, Confirmed.
Isabelle
>>> Rani Franovich 03/10/03 08:55AM >>>
Hi Isabelle, Since no formal response to the subject ACRS Letter is needed, we consider Action Item 20030079 closed. Please confirm this resolution.
- Thanks, Rani
>>> Sam Duraiswamy 03/05/03 08:04AM >>>
Isabllle:
The ACRS Chairman has decided that there is no formal EDO response is needed for the ACRS report on Catawba and McGuire license renewal application. However he would like the staff to keep the Committee informed of the following:
.Whether Duke plans to implement the Program to manage PWSCC in the current license term ,as encouraged by the Committee.
.Status of obtaining resources for the staffs inspection of commitments and other activities to be conducted before the plants enter the extende period of operation..
CC: Barbara Whitaker; Beverly Sweeney; Cathy Jaegers; Howard Larson; John Larkins; Pao-Tsin Kuo; Ramin Assa; Samson Lee; Sher Bahadur; Timothy Kobetz