 Issue dateTitleTopic
ML19210E69223 November 1979Second Interim Deficiency Rept Re Crack in Partially Embedded Rebar.Const Procedures at Sites Revised.Plans to Submit Next Rept by 800208
ML19256F20026 November 1979First Interim Deficiency Rept Re Nonconformance in Metal Conduits.Damaged Threads,Burrs & Flaked Galvanized Coating Detected.Defective Parts Will Be Returned to Triangle Pwc & All Conduits Inspected
ML19256F63323 November 1979Second Interim Deficiency Rept Re Rebar Bending Not in Accordance W/Specs.Div of Const Procedures for Bending Partially Embedded Rebar Did Not Implement Const Spec G-2 Requirements.Const Procedures Revised
ML19256F64526 November 1979First Interim Deficiency Rept Re Defective Electrical Conduit.Defects Identified as Damaged Threads,Burrs,Out of Round & Flaking of Galvanized Coating.All Conduits Being Inspected & Defective Conduit Returned to Triangle Pwc
ML19261D53525 May 1979Deficiency Rept on 790525:piping Elbows Constructed from Unspecified Matl.Elbows W/Heat Code W6719 Were Identified, Tested & Returned to Manufacturer
ML19296D15122 February 1980Final Deficiency Rept:Received Defective Intermediate Metal Conduit from Triangle Pwc.Portion Embedded in Concrete Before Discovery.Caused by Damaged Threads & Flaking. Defective Conduits Will Be Inspected &/Or Returned
ML19309H4975 May 1980Second Interim Deficiency Rept Re Incorrect Use of Inertia Resulting in shear-related cross-sectional Property Calculations for Control Bldg.Investigation in Progress
ML19312E48727 May 1980First Interim Deficiency Rept Re Placement & Compaction of Concrete Pour A2-D1.Concrete Placement Is Being Evaluated for Acceptability w/G-2 Requirements.Honeycomb Increase Determined Not Excessive
ML19316B08127 May 1980First Interim Deficiency Rept Re Const QA Audit YC-C-80-05. on 800422,pour Not Placed & Compacted Per Const Specs.No QA Insp Performed.Inspectors Instructed in Requirements of General Const Spec G-2
ML19318A37713 June 1980Final Deficiency Rept Re Failure of Concrete Pour A1-P3 to Obtain Initial Set in Normal Time.Apparently Caused by Abnormal Amount of Air Voids.Defective Concrete Replaced. Outline drawings,4RE0417-5R Series,Will Be RevisedSafe Shutdown
ML19320C02911 July 1980Revised Final Deficiency Rept Re Placement of Earthfill in Essential Raw Cooling Water Spray Pond.Insufficiently Compacted Matl Was Removed & Replacement Fill Recompacted. Util Will Use Penetrometer Tests for Fill Operations
ML19320C54010 July 1980Final Deficiency Rept Re Placement of Earthfill in ERCW Spray Pond.Qa Audit Revealed Eight Items of Noncompliance Re Placement & Insp of Earthfill.Laborers Will Be Assigned to Remove All Visible Unsuitable Matl During Fill Placement
ML19320C55110 July 1980Final Deficiency Rept Re Const QA Audit.Concrete Placement Evaluated & Found Acceptable.Inspectors Instructed in Requirements of General Const Spec
ML19321A3779 July 1980Part 21 Rept Re Bristol Structural Steel Framing for Control Bldg.Rework of Fillet Welds Is Being Performed.Next Rept Will Be Submitted by 800815
ML19323F13921 May 1980First Interim Deficiency Rept Re Const QA Audits for Sampling Gradation & Tests of Cylindrical Concrete Specimens.Items Under Evaluation.Next Rept Will Be Forwarded by 800709
ML19330C7481 August 1980Third Interim Deficiency Rept Re Improper Documentation & Utilization of Computer Program Inertia.Documentation Revised to Restrict Use to Closed Sections.New Structural Responses Supplied & Verified
ML19338G10223 October 1980First Interim Deficiency Rept Re QA Audit M80-7,Deficiencies 2,3 & 5.Deficiencies Under Evaluation.Next Rept Will Be Submitted by 801125
ML19340D58624 December 1980Revised Final Deficiency Rept,Initially Reported 801113,re Nonconservative Application of Tpipe Computer Program.Piping Analyses Affected by Incapability to Meet Design Criteria to Be Resubmitted for Reanalysis
ML19340D60123 December 1980Deficiency Repts 50-566/80-17-01 & 50-567/80-17-05.Div of Power Production Operational QA Manual Found Not Clearly Applicable for Preservice Insp in Vendor Shops.Manual Rewritten by Util.Changes to Be Incorporated by 810228
ML19343A19111 September 1980Final Deficiency Rept Re 84 Reinforcing Bars Left Out of Wall Pour C1-F1 Located in Control Bldg.Caused by Inspector Error &/Or Rebar Removed for Other Installations.Missing Rebar Replaced.Detail Checkoff List Initiated to Aid Insp
ML19343A7005 November 1980Part 21 Rept Re Structural Steel Framing for Control Bldg. Rework of Fillet Welds Has Been Performed by Vendor Representatives & Items Now Comply W/Contract Spec Requirements.Audit Will Be Completed by 801201
ML19343B5018 December 1980Part 21 Rept Re Reactor Protection Sys Flexible Conduit Defect Causing Hot Shorts If Improperly Grounded.Caused by Paint on Panel Surfaces or High Resistance Connection to Panel Survaces Where Termination Modules Are MountedHot Short
ML19344D64221 April 1980First Interim Deficiency Rept Re Improper Documentation & Utilization of Computer Program Inertia.Program Documentation Being Revised to Restrict Use to Closed Sections Only
ML19344D67121 April 1980First Interim Deficiency Rept Re Defective Concrete Pour in Auxiliary Bldg.Concrete Samples Have Been Sent to Singleton Lab for Testing
ML19344D97215 August 1980Second Interim Deficiency Rept Re Structural Steel Framing for Control Bldg.Deficiency Considered Reportable Under 10CFR21.Rework of Fillet Weld Has Been Performed by Vendor. Next Rept Will Be Submitted by 801106
ML19344D99420 August 1980Third Interim Deficiency Rept Re Const QA Audit.Util Is in Final Stages of Evaluating Resolution for Item 2.Next Rept Will Be Provided by 801020
ML19345C29725 November 1980Second Interim Deficiency Rept Re QA Audit M80-7 Deficiencies 2,3,5 & 14 Initially Reported on 800923.Some Conditions Adverse to Quality Are Being Reported on Procedure Revision Request FormsCondition Adverse to Quality
ML19345G7407 April 1981Part 21 Rept Re Welds on Joseph Oat Co Component Cooling Water Heat Exchangers,Initially Reported on 810306.Vendor Insp Revealed That Defects Appear Confined to Surface W/Possible Removal by Grinding
ML19347E0768 April 1981Second Interim Deficiency Rept Re Fillet Weld Misspec, Initially Submitted 801210.Design Review Reveals Deficiency Exists in Some Form at Every TVA Plant.Next Rept Scheduled for 810812
ML19350C91631 March 1981Final Part 21 Rept Initially Reported 801008 Re Deficient Welds on Gas Stripper Pump Module.Norwalk Fabricators Will Supervise Removal of Deficient Piping.Work to Be Completed by 810515
ML19350D80314 May 1981Final Deficiency Rept,Initially Reported 810414,re Nonconforming Concrete,Rebar & Bolt Coupler Placement in Fuel Bldg.Caused by Personnel Error & Misinterpreting Drawings.Slab Will Be Repoured by 810529
ML19351G54719 February 1981First Interim Deficiency Rept Re Defects Revealed by Source Insp of Welds,Initially Submitted 810120.Investigation Initiated
ML19352A1725 March 1981First Interim Deficiency Rept Re Lamination of Soil in ERCW Spray Pond,Initially Reported 810204.Laminations Possibly Caused by Overcompaction of Liner &/Or Excessive Speed of Hauling Equipment.Block Samples Will Be Evaluated
ML19352A98028 May 1981Revised Final Deficiency Rept,Originaly Reported on 800321, Re Improper Documentation & Utilization of Computer Program Inertia.Inertia & Bigdyna Properly Utilized & Only Seismic Analysis for Control Bldg AffectedEarthquake
ML20002B0321 December 1980Final Significant Deficiency Rept Initially Reported on 800421 Re Const QA Audit.Qc Employees Have Been Instructed to Obtain Matl Correctly.Oci C-204 Revised & Retest Required.Qc Reminded of New Requirements
ML20002D1179 January 1981First Interim Deficiency Rept Re Fillet Weld Misspecification Initially Reported 801210.American Inst of Steel Const Stds & Affected Welds Under Review.Next Rept Will Be Submitted by 810408
ML20003C0335 February 1981Part 21 Rept Re Deficient Undersized Welds in Gas Stripper Module,Mfg by Norwalk Fabricators,Initially Reported 801008. Util Will Perform Repair If C-E Accepts Responsibility for Repair Procedures
ML20003C91213 March 1981First Interim Deficiency Rept,Originally Reported 810212 Re Unverified Seismic Analysis of Final Design for Essential Raw Cooling Water Pumping Station,Hatch Access Platform & Waste Mgt Bldg.Verification Incomplete.Next Rept by 810729
ML20003D59020 March 1981Final Deficiency Rept,Originally Reported on 810220,re Bent, Shifting & Dislocated Rebar/Anchor Bolts.Caused by Drawing Interpretation Errors & Improper Handling & Rigging Practices.Rebars Straightened & New Bolts Grouted in
ML20003D62020 March 1981Third Interim Deficiency Rept,Originally Reported on 800923,re QA Audit M80-7 Deficiencies 2,3,5 & 14.Review of Deficiencies & Proposed Corrective Action Continuing.Next Rept Will Be Submitted by 810922Condition Adverse to Quality
ML20003G49423 April 1981Final Rept Re Error in Tpipe Program,Initially Reported on 810327.Corrected Version of Tpipe Program Verified & Put Into Production.Poll Showed No Incorrect Design Info Issued from Using Error
ML20004C08126 May 1981First Interim Deficiency Rept Re Cooling Tower Makeup Control,Initially Submitted 810423.Analysis of safety-related Requirements Imposed by Design Criteria Is in Progress
ML20005A41023 June 1981Second Interim Deficiency Rept Re Source Insp,Initially Reported on 810120.Generic Implications Re Breakdown in Quality Sys at Source Insp Level Are Being Studied.Next Rept Will Be Submitted by 810904
ML20008F8531 May 1981Part 21 Rept Re C-E Failure to Implement Design Criteria for Seal Welding to Anchor Bolt,Initially Reported 810401. Channel Will Be Machined Between Bolt Locations & Liner Seal Weld.Next Rept by 810804
ML20008F9844 May 1981First Interim Deficiency Rept,Initially Reported 810402,re Tornado Depressurization Design Deficiencies.Ventilation Analysis for Intake & Essential Raw Cooling Water Pumping Stations Performed.Next Rept Will Be Submitted by 810909
ML20009F47617 July 1981Second Interim Deficiency Rept,Initially Reported on 810212, Re Unverified Seismic Analysis for Final Design.Final Seismic Structural Analysis Has Been Checked & Verified.Next Rept Will Be Submitted by 811028
ML20009F55922 April 1981Revised Final Deficiency Rept Re Welds on Gas Stripper Module,Initially Reported 801008.Piping Which Failed to Meet ASME Code Requirements Will Be Returned to Supplier for Repairs.Deficiency Also Reported Per Part 21
ML20009F5788 July 1981Second Interim Deficiency Rept Re Cooling Tower Makeup Control,Initially Reported 810423.No Addl Info to Rept at Present.Next Rept Will Be Submitted by 810819
ML20009F63321 April 1981Final Deficiency Rept Re Fl Steel Corp Undersized Fillet Welds W/Craters,Excessive Undercut,Lack of Fusion & Porosity Initially Reported 801121.Welds Repaired by Fl Steel Following Insp
ML20009G12624 July 1981Second Revised Final Deficiency Rept Re Welds on Gas Stripper Module,Initially Reported 801008.Norwalk Fabricators Will Remove Nonconforming Piping.Work Will Be Completed by 820301.Part 21 Applicable to Deficiency