Text
f I
i g'
e4 400 Chestnut Street Tower II
' ' /[
June 23, 1981 4
4 e
s'. i('
%g\\
YCRD-50-566/81-02 r M'9 h
jd YCHD-50-567/81-02 f
&e
%X J'
Mr. James P 0'Reilly, Director Office of I tion and Enforcement U.S. Nuclear R latory Commission Region II - Sui 3100 101 Marietta Stre i
Atlanta, Georgia 03 i
Dear Mr. O'Reilly:
YELLOW CREEK NUCLEAR PLANT UNITS 1 AND 2 - SOURCE INSPECTION -
YCRD-50-566/81-02, YCRD-50-567/81 SECOND IlffERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector M. Thomas on January 20, 1981 in accordance with 10 CFR Part 50.55(e) as NCR YCN QAB 8101. This was followed by our first interim report dated February 19, 1981. Enclosed is our second interim report. We expect to submit our next report by September 4,1981.
If you have ::ny questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure cc: Mr. Victor Stello, Jr., Director (Enclosure)
Office of Inspectian and Enforoenent U.S. Nuclear Regulatory Commission Washington, DC 20555 h
S I\\
1 P00R ORIGINAL 8 1 0 0 3 0 0.:2?g 3
1 ENCLOSURE YELLOW CREEK UUCLEAR PLANT UNITS 1 AND 2 SOURCE INSPECTION YCRD-50-566/81-02, YCRD-50-567/81-02 10 CFR 50.55(e)
SECOND INTERIM REPORT Description of Deficiency On four separate-occasions between June and December 1980, employees of TVA's Division of Construction discovered defects in welds by visual examination after the subject material had been released from the vendor shop by TVA's source inspectors.
All of the four occasions were handled as individual nonconformance reports (NCR's). The specific safety implication of each NCR will be addressed in that manner. However, this NCR was written to address the generic implication associated with a breakdown in the quality system at the source inspection level.
Interim Progress TVA is finalizing the study to determine the generic implications of the condition and develop corrective action.
e e
a la