Text

ROCHESTER GASANDELECTRICCORPORATION R.E.GINNANUCLEARPOWERPLANTQualityAssurance ProgramforStationOperation Revision21DOCKETNO.50-244December21,199494i2290262 941221lPDRADOCK05000244' PDR',

~~~/QUALITYASSURANCE PROGRAMFORSTATIONOPERATION TABLEOFCONTENTSSectionTitlePa<ac17.1MANAGEMENT 17.1.117.1.217.1.317.1.417.1.517.1.617.1.7Methodology Organization Responsibility Authority Personnel TrainingandQualification Corrective ActionRegulatory Commitments 1291010111117.2PERFORMANCE VERIFICATION 17.2.117.2.217.2.317.2.417.2.517.2.617.2.717.2.817.2.917.2.1017.2.1117.2.1217.2.1317.2.1417.2.15Methodology DesignControlDesignVerification Procurement ControlProcurement Verification Identification andControlofItemsHandling, Storage,andShippingTestControlMeasuring andTestEquipment ControlInspection, Test,andOperating StatusSpecialProcessControlInspection Corrective ActionDocumentControlRecords24242627292930313233343435363817.3ASSESSMENT 17.3.117.3.2Methodology Assessment 3939 LISTOFTABLESTableNumberTitlePacae17~11117.1.1-217.1.7-117.3.2-1QualityAssurance PolicyStatement Supplementary GlossaryConformance ofGinnaStationProgramtoQualityAssurance Standards, Requirements, andGuidesAuditList121318LISTOFFIGURESFiureNumberTitlePacae17~121Organization, Chart23 QUALITYASSURANCE PROGRAMFORSTATIONOPERATION 17.1MANAGEMENT 17.1.1Methodology TheRochester GasandElectricCorporation qualityassurance policyisestablished bytheChairmanoftheBoard,President, andChiefExecutive Officer.ThispolicyissetforthintheRochester GasandElectricCorporation GinnaStationCorporate Statement ofQualityAssurance Policy,showninTable17.1.1-1, andisbindingonallorganizations andindividuals performing GinnaStationqualityaffecting activities.

Thepolicyisimplemented undertheoveralldirection oftheVicePresident, NuclearOperations throughtheDepartment Manager,NuclearAssessment; thePlantManager,GinnaStation;DivisionManager,SupportServices; andheadsofothersupporting departments.

TheQualityAssurance Programhasbeendeveloped bytheRochester GasandElectricCorporation toassuresafeandreliableoperation oftheR.E.GinnaNuclearPowerPlant.TheprogramcoversallexistingSeismicCategoryIandClass1Estructures, systems,andcomponents (SSCs)including theirfoundations andsupports.

Itappliestoallactivities affecting thesafetyrelatedfunctions ofthesestructures, systems,andcomponents thatpreventormitigatetheconsequences ofpostulated accidents thatcouldcauseunduerisktothehealthandsafetyofthepublic.Theseactivities includedesigning, operating, maintaining, repairing, fabricating,

handling, shipping, storing,procuring, refueling, modifying,
cleaning, erecting, installing, testing,inspecting, andinservice inspection.

Qualityaffecting activities arecontrolled toanextentconsistent withtheirsafetysignificance.

Inaddition, theQualityAssurance Programappliestotheactivities associated withthepackaging oflicensedradioactive materials tobeshippedinaccordance with10CFRPart71,excluding fabrication anddesignofshippingcasks.Aclassification processisestablished toidentifySSCsthataresafetyrelated(SR),safetysignificant (SS),orhavenosafetyimpact(NNS)~Criteriaarebasedoninformation contained intheUpdatedFinalSafetyAnalysisReport(UFSAR),licensing commitments, guidelines contained inNRCregulatory guides,andfunctional guidancederivedfromANSI/ANS51.1-1983 andANSIN18.2-1973.

ForchangestoGinnaStation,safetyclassification andcorresponding QAprogramapplicability aredetermined usingapprovedprocedures.

RG&EQAPSO,Revision21December21,1994 RG&E'sQualityA'ssurance ProgramprovidesamethodofapplyingagradedQAProgramtocertainnon-safety relatedsystems,components, items,andservices.

Thisprogramappliestoallnuclearrelatedportionsoftheplant,butalsomaybeoptionally applied,intotalorinpart,tootherselecteditemsnecessary forreliableoperation.

TheNuclearPolicyManualspecifies theextenttowhichtheQualityAssurance Programappliestonon-safetyrelateditemsandservices.

SpecialtermsusedinthisdocumentwhicharenotfoundinANSIN45.2.10"QualityAssurance TermsandDefinitions" aredefinedinTable17.1.1-2, Supplementary Glossary.

17.1.2Organization Themajororganizations participating intheQualityAssurance ProgramfallwithintheCustomerOperations unit,undertheleadership oftheSeniorVicePresident, CustomerOperations.

Theyare:~Nuclear0erations-including GinnaStation,NuclearEngineering

Services, NuclearAssessment, NuclearDivisionTraining, andthePlantOperations ReviewCommittee

~NuclearSafetAuditandReviewBoardNSARB~SuortServices-functional groupsincluding purchasing, materials engineering, inspection

services, physicalservices, andlaboratory services~Information Services~EnerDeliverFigure17.1.2-lisanorganization chartshowingtheseorganizations andtheirrelationship tothecorporate organization.

Chapter13oftheUFSARaugmentstheFigurewithorganization chartsforthevariousdepartments.

Positions responsible fortheprincipal elementsofthequalityassurance programare:~ChairmanoftheBoard,President, andChiefExecutive Officer~SeniorVicePresident, CustomerOperations RG&EQAPSO,Revision21December21,1994 VicePresident, NuclearOperations

~PlantManager,GinnaStation~Department Manager,NuclearEngineering Services~Department Manager,NuclearAssessment

~Manager,QualityAssurance

~Manager,NuclearAssurance

~Department Manager,NuclearDivisionTrainingDivisionManager,SupportServicesDivisionManager,EnergyDeliveryDivisionManager,Information ServicesSENIORMANAGEMENT ChairmanoftheBoardPresident andChiefExecutive OfficerTheChairmanoftheBoard,President, andChiefExecutive OfficeroftheRochester GasandElectricCorporation directedtheestablishment oftheQualityAssurance Programandissuedthegoverning policystatement.

Heestablished theNuclearSafetyAuditandReviewBoardtoreviewandauditplantoperations.

TheChairmanoftheNSARBisresponsible totheChairmanoftheBoard,President, andChiefExecutive Officeronallactivities oftheNSARB.SeniorVicePresident Customer0erationsTheSeniorVicePresident, CustomerOperations reportstotheExecutive VicePresident andoverseesallorganizations involvedintheoperation andsupportofGinnaStation,including theQualityAssurance Program.Heisalsoresponsible forthoseitemsdelineated intheAdministrative ControlssectionoftheTechnical Specifications.

NUCLEAROPERATIONS VicePresident Nuclear0erationsTheVicePresident, NuclearOperations isresponsible totheSeniorVicePresident, CustomerOperations andhascorporate responsibility foroperation ofGinnaStationinaccordance withapplicable regulatory requirements.

Inaddition, hehasoverallresponsibility andauthority fordirecting theQualityAssurance Programandisresponsible fortheapprovaloftheNuclearPolicyManual.Heisresponsible forestablishing thepoliciesandrequirements necessary toassuresafeandreliableoperation ofGinnaStationandforoversight ofGinnaStationandthosesupportactivities associated withNuclearEngineering

Services, NuclearAssessment, NuclearDivisionTraining, andSteamGenerator Replacement.

RG&EQAPSO,Revision21December21,1994

~~-1 PlantManaerGinnaStationThePlantManager,GinnaStationisresponsible totheVicePresident, NuclearOperations fortheoverallon-sitesafeoperation ofGinnaStation.Heisresponsible for:~theperformance ofallGinnaStationqualityaffecting activities inaccordance withtherequirements oftheQualityAssurance Program~providing qualified personnel toperformqualityaffecting activities inaccordance withapproveddrawings, specifications, andprocedures

~implementation ofthoseitemsdelineated intheAdministrative ControlsSectionofTechnical Specifications

~timelyreferralofappropriate matterstomanagement andtheNSARB~assuringthatsignificant conditions adversetoqualityareidentified andcorrected.

ThePlantManager,GinnaStationassignsresponsibility toSuperintendents anddesignated staffmembersforthecontrolofallactivities involving operation, maintenance, repair,refueling, implementation ofmodifications, fireprotection, radiation protection, chemistry, andplantsecurity.

Responsibility isdelegated fortheimplementation ofQualityAssurance Programrequirements attheplantfortesting,procurement, storageofmaterialandequipment, operation andteststatuscontrol,calibration andcontrolofmeasuring andtestequipment, andmaintenance ofmaterialhandlingequipment.

DeartmentManaerNuclearEnineerinServicesTheDepartment Manager,NuclearEngineering Servicesisresponsible totheVicePresident, NuclearOperations for:designofmodifications tothefacilityinaccordance withapplicable designbases,regulatory requirements, codes,andstandards implementation ofthelicensing/compliance programmaintenance ofGinnaStationdesignandlicensing basisnuclearfuelmanagement technical supportforGinnacorrective actionRG&EQAPSO,Revision21December21,1994

~reviewofuniquemaintenance andrepairprocedures formajorequipment andprovision oftechnical support,asrequested byGinnaStation.DeartmentManaerNuclearAssessment TheDepartment Manager,NuclearAssessment isresponsible totheVicePresident, NuclearOperations forestablishing theoverallQualityAssurance Program.Heisresponsible forassuringthatallplannedandsystematic actionsnecessary toprovideadequateconfidence thatGinnaStationwilloperatesafelyandreliablyareestablished andfollowed.

Heprovidesmanagement withobjective information concerning quality,independent oftheindividual orgroupdirectlyresponsible forperforming thespecificactivity.

Hehastheauthority andorganizational freedomtoassureallnecessary qualityactivities areperformed.

Heisresponsible fordirecting theactivities ofQualityAssurance, NuclearAssurance, andOperational Assessment.

Inaddition, heisresponsible forNuclearEmergency Preparedness.

ManaerualitAssurance TheManager,QualityAssurance reportstotheDepartment Manager,NuclearAssessment.

HeandtheQualityAssurance staffareresponsible forinterpreting corporate qualityassurance policyandforassuringitsimplementation.

Thisincludesassuringthattheprogramsatisfies therequirements of10CFR50,AppendixBandkeepingthetotalprogramcurrent.Heisresponsible forestablishing andimplementing anindependent assessment programthatencompasses allorganizations andfunctions relatedtothesafeoperation ofGinnaincluding thequalified suppliers ofsafetyrelatedmaterials andservices.

Inaddition, heisresponsible forSteamGenerator Replacement qualityassurance.

ManaerNuclearAssurance TheManager,NuclearAssurance reportstotheDepartment Manager,NuclearAssessment andisresponsible forassuringthatstationactivities affecting qualityareprescribed andcarriedoutinaccordance withapproveddrawings, specifications, andprocedures.

Heisalsoresponsible forthecontrolandmaintenance ofdocuments andrecords.NuclearAssurance isresponsible forassuringperformance ofverification inspection andreceiptinspection activities andassuringthatinspection requirements areincludedinapprovedprocedures, procurement documents, andworkpackages.

Inaddition, NuclearAssurance hasresponsibility forcoordinating rootcauseinvestigation andcorrective actionforsignificant conditions adversetoquality,andforevaluating anddisseminating industryexperience information.

RG&EQAPSO,Revision21December21,1994 DeartmentManaerNuclearDivisionTraininTheDepartment Manager,NuclearDivisionTrainingisresponsible totheVicePresident, NuclearOperations formaintaining andimplementing aNationalAcademyforNuclearTrainingaccredited trainingprogramand,inconjunction withSupportServices, forproviding trainedandqualified riggersandcraneoperators tosupportnuclearrelatedactivities.

SUPPORTSERVICESDivisionManaerSuortServicesTheDivisionManager,SupportServicesisresponsible totheSeniorVicePresident, CustomerOperations fordirecting certainactivities insupportofGinnaStation.Theseactivities include:procurement ofmaterials,

services, andcomponents fromqualified suppliers inaccordance withapplicable commercial, technical, andqualityrequirements specialprocesses inservice inspection maintenance ofliftingandhandlingequipment trainingandqualification ofweldersandNDEpersonnel and,inconjunction withNuclearDivisionTraining, trainingandqualification ofriggersandcraneoperators provision ofpersonnel supportforGinnaStationmaintenance activities chemistry serviceslaboratory testingandcalibration ofsomeelectrical equipment anddevices.INFORMATION SERVICESDivisionManaerInformation ServicesTheDivisionManager,Information Servicesisresponsible forcalibrating electricmetersusedatGinnaStation.RG&EQAPSO,Revision21December21,1994 ENERGYDELIVERYDivisionManaerEnerDeliverTheDivisionManager,EnergyDeliveryisresponsible forproviding astafftoperformrelayengineering servicesandconductroutinemaintenance andtestingofGinnaStationmetersandrelays.Heisresponsible fordesign,modification, andconstruction activities atStation13Aandforsupporting NuclearEngineering Servicesdesignandconstruction activities atGinna.Heisalsoresponsible forcoordinating andproviding supportdocumentation fordesignofmodifications initiated withintheEnergyDeliveryDivision.

REVIEWANDAUDITORGANIZATIONS Threeseparateorganizational unitsareestablished forthepurposeofreviewandauditofplantoperations andsafety-relatedmatters.Theyare:Plant0erationsReviewCommittee PORC,theon-siteoperations reviewgroupresponsible forreviewing thoseactivities thataffectnuclearsafety.ualitAssurance, thegroupresponsible fortheauditofsafetyrelatedactivities associated withplantoperations.

NuclearSafetAuditandReviewBoardNSARB,theindependent auditandreviewgroupresponsible fortheperiodicreviewoftheactivities ofthePlantOperations ReviewCommittee, fordirecting auditsandevaluating theirresults,andforthemanagement evaluation ofthestatusandadequacyoftheQualityAssurance Program.Anadjunctgroup,theQA/QCSubcommittee, reportstotheNSARBonauditandqualityrelatedmatters.PORCReviewactivities ofthePORCprovide,aspartofthenormaldutiesofplantsupervisory personnel, timelyandcontinuing monitoring ofoperating activities toassistthePlantManagerinkeepingabreastofgeneralplantconditions andtoverifythattheday-to-day operating activities areconducted safelyandinaccordance withapplicable administrative controls.

PORCalsoreviewsfacilityoperations todetectpotential safetyhazards.Thesecontinuing monitoring activities areconsidered tobeanintegralpartoftheroutinesupervisory functionandareimportant tothesafetyofplantoperation.

RG&EQAPSO,Revision21December21,1994 Theon-siteoperating organization (PORC)performsreviews,periodically andassituations demand,toevaluateplantoperations andtoplanfutureactivities.

Theimportant elementsofthereviewsaredocumented.

ThePORCscreenssubjectsofpotential concerntotheNSARBandperformspreliminary investigations.

ThePORCscopeofreview,organization, quorum,andrecordsmeettherequirements ofANSI/ANS-3.2-1988, Section4.3.PORCiscomprised ofpersonnel whocollectively havetheexperience andcompetence inthefollowing areas:NuclearOperations Mechanical Maintenance Electrical Maintenance PlantEngineering ReactorEngineering Radiation SafetyChemistry QualityAssurance/Quality ControlThePORCchairmanmeetsthequalifications ofANSIStandardN18.1-1971, Section4.2.2,andholds,orhasheld,aSeniorReactorOperating LicenseorSROcertification.

PORCmembersmeetthequalifications ofsection4.3.1or4'asapplicable.

ThePORCiscomprised ofaminimumoffive(5)andmaximumofnine(9)regularmembers,asdesignated bythePlantManager.Alternates aredesignated inwritingbythechairman.

Thenumberofattending alternates willnotexceedaminorityofthenumberrepresenting aquorum.ThePORCmeetsatleastoncepercalendarmonthandasconvenedbythePORCChairman.

ThePORCalsoreviewsproposedtestsandexperiments andchangestoprocedures thatmayaffectnuclearsafety.ThePORCrecommends inwritingtothePlantManagerapprovalofitemssubmitted forreview,documents whetheranychangeconstitutes anunreviewed safetyquestionunder10CFR50.59, andprovidesimmediate notification totheVicePresident, NuclearOperations andtheChairman, NSARBofdisagreement betweenthePORCandthePlantManager.ThePORCprovideswrittenmeetingminutestotheChairman, NSARB.RG6EQAPSO,Revision21December21,1994 c'SARBTheNSARBscopeofreviewmeetstherequirements ofANSIStandardN18.7-1976, Section4.3.4.TheNSARBcomposition, meetingfrequency, quorum,andrecordrequirements meetANSIStandardN18.7-1976, Section4.3.2.Qualifications ofmembersarecommensurate withtheirfunctional responsibilities asdefinedinANSI/ANS-3.1-1987, Section4.7,withtheexception thatthefunctional areasofnuclearpowerplantoperations andnuclearengineering haveovereight(8)yearsexperience intheirfieldwithoverfour(4)yearsresponsible engineering management.

ThemembersoftheNSARBareappointed bytheChairmanoftheBoard,President, andChiefExecutive Officer.RecordsofNSARBactivities areprepared,

approved, anddistributed within14daystotheSeniorVicePresident, CustomerOperations; andtheVicePresident, NuclearOperations.

Reportsofreviewsintheareasencompassed bySections4.3.4(4)and4.3.4(5)ofANSIStandardN18.7-1976 areprepared,

approved, andforwarded totheVicePresident, NuclearOperations within14daysofcompletion ofthereview.Auditreportsencompassed byTable17.3.2-1areforwarded totheVicePresident, NuclearOperations andthemanagement positions responsible fortheareasauditedwithin30daysaftercompletion oftheaudit.DELEGATION OFWORKQualityaffecting activities maybedelegated tocontractor organizations andequipment vendors.Delegated activities aresubjecttoQualityAssurance Programrequirements throughconformance withtheexternalorganization's QAProgramasapprovedbyRGRE,RG&E'sQualityAssurance Program,oranapprovedcombination ofthetwo.RGEEretainsoverallresponsibility fortheQualityAssurance Programandmanagement oversight ofdelegated activities.

Thescopeofdelegated activities andapplicable QualityAssurance Programrequirements aredefinedinprocurement documents.

17.1.3Responsibility Allemployees ofRochester GasandElectricinvolvedintheoperation ofGinnaStationandassociated supportactivities havefullpersonalandcorporate responsibility toassurethattheplantisoperated, maintained, tested,inspected, andmodifiedinasafeandreliablemanner.Thisresponsibility includesassuringthataneffective QualityAssurance Programisimplemented.

RG&EQAPSO,Revision21December21,1994 Theoperation ofGinnaStationisgovernedbytheNuclearPolicyManual,aportionofwhichgovernstheQualityAssurance Program.Itcontainstherequirements andassignment ofresponsibilities forimplementation oftheprogram.Themanualisprepared,

reviewed, andmaintained byGinnaStationandapprovedbytheVicePresident, NuclearOperations.

TheNuclearSafetyAuditandReviewBoardisdirectedbytheChairmanoftheBoard,President, andChiefExecutive OfficertoreviewthestatusandadequacyoftheQualityAssurance Programatleastonceeverytwoyearstoassurethatitismeaningful andeffectively complieswithcorporate policyand10CFR50,AppendixB.Thisreviewconsistsofanaudit,orareviewequivalent toanaudit,performed bycompanypersonnel oroutsideorganizations.

TheQualityAssurance Programisimplemented throughprocedures preparedandmaintained bytheresponsible organization andapprovedforusebytheirdesignated manager.Qualityaffecting activities areperformed inaccordance withtheseprocedures, utilizing sufficient trainedpersonnel andnecessary resources toaccomplish thework.17.1.4Authority Personsororganizations whoaredelegated responsibility forplanning, establishing, orimplementing anypartoftheRGEEQualityAssurance Programalsohavetheauthority tocarryoutthoseresponsibilities.

NuclearOperations andnuclearsupportorganization personnel areempowered totakestopworkactionontheirownactivities iftheydetermine thatcontinuing theactivitywouldprecludeidentifying andcorrecting acondition adversetoqualityorleadtoanunsafecondition.

Designated independent QA/QCpersonnel havetheauthority tostopworkwithintheNuclearOperations

Division, nuclearsupportorganizations, andatsupplierlocations.

ThePlantManager,GinnaStationhasstopworkauthority forallactivities performed inoperating thestation.17.1.5Personnel TrainingandQualification RGEEiscommitted tomaintaining NationalAcademyforNuclearTrainingaccredited trainingprogramsthatproducequalified, competent personnel tooperateandmaintainGinnaStation.NuclearDivisionTrainingisassignedtheresponsibility forsupporting NuclearOperations Divisionlinemanagement withthedevelopment, monitoring, andevaluation ofanadequatestaffofexperienced, trained,andqualified personnel toensurethesafeandefficient operation, modification, andmaintenance oftheplant.RG6EQAPSO,Revision21December21,1994 Supervisory personnel areindoctrinated inqualityassurance

policies, manuals,andprocedures toassuretheyunderstand thatthesearemandatory requirements whichmustbeimplemented andenforced.

Personnel responsible forperforming activities affecting qualityaretrainedandindoctrinated intherequirements, purpose,scope,andimplementation ofapplicable qualityrelatedprogrammanualsandprocedures.

Refresher sessionsareheldperiodically.

Trainingofpersonnel istheresponsibility ofeachdepartment performing anactivityaffecting quality.TheVicePresident, NuclearOperations isresponsible fortheformaltraining, qualification, licensing, andre-qualification ofoperators, asnecessary.

Asappropriate, personnel grantedunescorted accesstoGinnaStationaretrainedinradiation protection, plantsafety,andsecurity.

Trainingandqualification recordsaremaintained foreachemployeewhenrequired.

Documentation offormaltrainingincludesobjectives, contentoftheprogram,attendees, anddateofattendance.

17.1.6Corrective ActionRochester GasandElectrichasestablished acorrective actionprocesswherebyallpersonnel areresponsible forassuringthatconditions adversetoqualityarepromptlyidentified,

reported, controlled, andcorrected.

Theprocessisfocusedoncorrecting theproblemanditsrootcauseratherthanassigning blameorfault.Trendsinqualityperformance areidentified, monitored, andreportedtomanagement.

Corrective actionandnonconformance controlprocesses arediscussed inSection17.2.13.17.1.7Regulatory Commitments TheQualityAssurance Programisdesignedtomeettherequirements of10CFRSO,AppendixB,"QualityAssurance CriteriaforNuclearPowerPlants."AlistingofRegulatory Guides,requirements, andstandards withtheconformance statusofeachiscontained inTable17.1.7-1.

RGEEQAPSO,Revision21December21,1994 TABLE17.1.1-1Rochester GasandElectricCorporation GinnaStationCorporate Statement ofQualityAssurance PolicyTheRochester GasandElectricCorporation hasalwaysandcontinues tobeanadvocateofqualityperformance inourdailyactivities.

TheQualityAssurance Programdescribed intheNuclearPolicy.Manualhasbeendeveloped toassurethatactivities, asdefinedwithintheprogramscope,arebeingperformed correctly andinconformance withapplicable requirements.

Thisprogramisdesignedtoassurethesafeoperation ofGinnaStationandtomeettherequirements ofTitle10,CodeofFederalRegulations, Part50(10CFR50),

AppendixB,"QualityAssurance CriteriaforNuclearPowerPlants."TheQualityAssurance Programappliestoallactivities affecting thesafetyrelatedfunctions ofthoseSeismicCategory1orClass1Estructures, systems,andcomponents thatpreventormitigatetheconsequences oformonitorthecourseofpostulated accidents, events,orphenomena thatcouldcauseunduerisktothehealthandsafetyofthepublic.Theseactivities includeoperating, maintaining, modifying, re'fueling, testing,andinspecting.

Inaddition, thisprogramappliesto10CFR50concernsassociated with:a.maintaining thehighdegreeofintegrity ofprimaryandsecondary barriersofsystemsorstructures containing radioactive materials b.providing firedetection, suppression, andconsequence mitigation itemsutilizedbothtoprotectthesafetyrelatedstructures, systems,andcomponents andtoassuresafeoperation intheeventofpostulated firec.providing assurance thatinstrumentation andcontrolswhichmonitoraccidents, orprovideasecondary roleinaccidentmonitoring, functioncorrectly andaccurately.

Thisprogramalsoappliestotheshippingoflicensedradioactive materialunder10CFR71,exceptfordesignandfabrication ofshippingcasks.TheDepartment Manager,NuclearAssessment isresponsible forcoordinating theformulation oftheQualityAssurance Program.TheManager,QualityAssurance isresponsible forassuringthattheprogramisimplemented.

GinnaStation,NuclearEngineering

Services, NuclearAssessment, NuclearDivisionTraining, SupportServices, Information Services; andEnergyDeliveryareresponsible for.implementing theQualityAssurance Programinaccordance withtherequirements oftheNuclearPolicyManual.oW.KoberChairmanoftheBoard,President, andChiefExecutive OfficerDate///5RG&EAPSO,Revision21 TABLE17.1.1-2Supplementary GlossaryTermswithspecialmeaningsusedinthisdocumentthatarenotdefinedinANSIN45.2.10, "QualityAssurance TermsandDefinitions,"

aredefinedbelow.AdoptedRGREhasendorsed, whollyorinpart,anindustrycode,standard, orNRCRegulatory Guideforwhichnoformalcommitment hasbeenmade.Alternative Relatestoexistingandproposedindustrycode,standard, orNRCRegulatory GuideforwhichRGSEprovidesothermeanstoassurequality.ApprovalTheformalactofendorsing oraddingpositiveauthorization, orboth,toanactionordocument.

Approvalmaybegivenonlybyanauthorized individual.

As-builtdrawingsDrawingssuchasflowprints,electrical elementary

diagrams, instrumentation andcontrolschematics, andpipinglayoutdrawingsthatreflecttheactualcurrentplantfieldconfiguration.

AuditAdocumented activitytodetermine, throughinvestigation, theadequacyofandadherence toestablished procedures, instructions, specifications, codesandstandards, orotherapplicable contractual andlicensing requirements andtheeffectiveness ofimplementation.

Audit(internal)

AuditofthoseportionsoftheRG6ECorporation's QualityAssurance Programretainedunderitsdirectcontrolandwithinitsorganizational structure.

RG&EQAPSO,Revision21December21,1994 TABLE17.1.1-2(cont'd)Certification Theaction,byanauthorized person,ofdetermining, verifying, andattesting, inwriting,tothequalifications ofpersonnel ormaterial.

CommitmentAformalendorsement providedbyRG&Etoaregulatory orexternalagencyregarding aregulatory position(Reg.Guide,NUREG,etc.)deemedapplicable.

ConformsRG&Ehascommitted fullytotherequirements withoutexception.

Deviation Adeparture ofacharacteristic fromspecified requirements.

HandlingAnactofphysically movingitemsbyhandorbymechanical means,butnotincluding transport onaconveyance, suchasmotorvehicles, ships,railroadcars,oraircraft.

HeavyloadAnyload,carriedinagivenareaafteraplantbecomesoperational, thatweighsmorethanthecombinedweightofasinglespentfuelass'embly anditsassociated handlingtoolforthespecificplantinquestion(1500N).Inservice Inspection Aplanned,periodicevaluation ofthecontinued structural integrity ofinstalled plantsystemsandcomponents bynondestructive methods,conducted inaccordance withtherulesofSectionXIoftheASMEBoiler&PressureVesselCode.Inspector Anindividual whohasbeenqualified toperformqualityverification inspections.

RGREQAPSO,Revision21December21,1994 TABLE17.1.1-2(cont')Measuring andtestequipment Devicesorsystemsusedtocalibrate, measure,gage,test,inspect,orcontrolinordertocontroldataortoacquiredatatoverifyconformance tospecified requirements."

Measuring andtestequipment doesnotincludepermanently installed plantinstrumentation ortestequipment usedforpreliminary checkswheredataobtainedwillnotbeusedtodetermine acceptability orbethebasisfordesignorengineering evaluation.

Nonconformance disposition Designated resolution toanonconforming itembycognizant personnel (e.g.,rework,repair,use-as-isorreject)."Off-the-shelf" Performance-based Anitemthatmeetsasupplier's standarddesignandtypically isavailable throughthecatalog.Anapproach, thatfocusesontheend*resultsthatdirectlycontribute tosafeandreliableplantoperation.

Meetingapredetermined setofgoals,limits,orperformance criteriabaseduponthedesignbasissafetyfunctionandthepastperformance ofstructures, systems,components, andorganizations, allowingthelicenseeflexibility todetermine howtheresultswillbeachievedandadjustqualitypractices, asnecessary.

Procedure Adocumentthatspecifies ordescribes howanactivityistobeperformed.

Itmayincludemethodstobeemployed, adescription ofequipment ormaterials tobeused,andsequenceofoperations.

RGREQAPSO,Revision21December21,1994 TABLE17.1.1-2(cont'd)Procurement documentPurchaserequisitions, purchaseorders,drawings, contracts, specifications, documents referenced bypurchaseorders,billsofmaterial, orotherinstructions usedtodefinerequirements forpurchase.

QAsurveillance Atechnique whichusesobservation ormonitoring toprovideconfidence thatongoingprocesses andactivities areadequately andeffectively performed (PerNQA-1App.2A-X).Qualified procedure Aprocedure whichincorporates allapplicable codesandstandards, manufacturer's parameters, andengineering specifications andhasbeenprovenadequateforitsintendedpurpose.SectionXXoftheASMECodedefinesprocedure qualifications forweldingactivities.

Qualityaffecting activities Activities forwhichtheQualityAssurance Programapplies.Safetyrelatedstructures, systems,andcomponents Safetysignificant structures, systems,andcomponents Thoseappurtenances thataredesignedtoSeismicCategoryIstandards (UFSARand/orReg.Guide1.29)andcapableoffunctioning topreventormitigatetheconsequences ofpostulated accidents thatcouldcauseunduerisktothehealthandsafetyofthepublic.Subsetofequipment notrequiredtoperformasafetyfunctionbutwhicharesubjecttoadditional controlsestablished byRG6E.RG&EQAPSO,Revision21-16-December21,1994 TABLE17.1.1-2(cont'd)Suppliersurveillance Areview,observation, orinspection forthepurposeofverifying thatanactionhasbeenaccomplished asspecified atthelocationofmaterialprocurement ormanufacture.

Traceability Acharacteristic giventomaterial, adocument, agroupofdocuments, ormaterialanditsrelateddocuments whichpermitstheretrieval orreassociation oftheitems,ifnecessary, atalatertime.Thetermisalsousedtodenoteadocumentwhichrecordsachronological historyofallprocesses oroperations whichhavebeenperformed onanitem.Verification inspection Aphaseofqualitycontrolwhichbymeansofexamination, observation, ormeasurement determines theconformance ofmaterials,

supplies, components, parts,appurtenances, systems,processes, orstructures topredetermined qualityrequirements.

RG&EQAPSO,Revision21-17-December21,1994 JJ~~'

TABLE17~1~7-1Conformance ofGinnaStationProgramtoQualityAssurance Standards, Requirements, andGuidesStandardRuirementoGuideConformance StatusemarksRegulatory Guide1.8Rev.(1)-Personnel Selection andTrainingRegulatory Guide1.26Rev.(3)-Quality GroupClassifications

&,Standards forWater,Steam,andRadioactive-Waste Containing Components ofNuclearPowerPlantsConformsAlternative RG1.8Rev.(1)incorporates ANSIN18.1.Aclassification processisestablished toidentifySSCsthataresafetyrelated(SR),safetysignificant (SS),orhavenosafetyimpact(NNS).Criteriaarebasedoninformation contained~

intheUpdatedFinalSafetyAnalysisReport(UFSAR),licensing commitments, guidelines contained inNRCregulatory guides,andfunctional guidancederivedfromANSI/ANS51.1-1983andANSIN18.2-1973.

Regulatory Guide1,28Rev.(2)-Quality Assurance ProgramRequirements (DesignandConstruction)

ConformsRG1.28Rev.(2)incorporates ANSIN45.2-1977.

Regulatory Guide1.29Rev.(3)-Seismic DesignClassification Alternative Seismicdesignrequirements forexistingstructures, systems,andcomponents performing functions listedinpositions C.1andC.3oftheRegulatory Guidearespecified intheUFSAR.Newstructures, systems,andcomponents, andconfiguration changesmeettheseismicdesignrequirements ofthisregulatory guideortheUFSAR.Thepertinent qualityassurance requirements of10CFRSO,AppendixBareappliedasrequiredbypositions C.1andC.4ofthisRegulatory Guide,irrespective ofanitem'sseismicdesign.Portionsofexistingstructures, systems,andcomponents withfailureconsequences described inpositionC.2ofthisguidearedesignedandconstructed toseismicrequirements specified intheUFSAR.Newstructures, systems,andcomponents, andconfiguration changesmeetthedesignandconstruction seismicrequirements oftheUFSARorthisRegulatory Guide.Aqualityassurance programsimilarto10CFR50,AppendixBisappliedtotheSSEfailureprevention functionoftheseitems.Theseitemsarenotconsidered basiccomponents pursuantto10CFR21.RQ&EQAPSO,Revision21 TABLE17.1.7-1(cont'd)StandarduireentorGuideCgnnfornanceP~earksRegulatory Guide1.30Rev.(0)-Quality Assurance Requirements fortheInstallation,.Inspection, andTestingofInstrumentation andElectricEquipment Regulatory Guide1.33Rev.(2)-Quality Assurance ProgramRequirements (Operations)

ConformsAlternative RG1.30Rev.(0)ANSIN.45.2.4-1972.

RG1.33Rev.(2)incorporates ANSIN18.7-1976/ANS-3.2.

GinnaStationconformstoRegulatory Positions 1,3,andSainRG1.33Rev.(2)andtoANSIN18.7-1976, sections4.3.2and4.3.4.GinnaconformstoRG1.33Rev.(0)exceptforAppendixAandANSIN18.7-1972, sections4.2.2,4.2.3,4.2,4,4.2.5,4.3,and4.5.Ginnaalsoconformstoregulatory staffcommentsandsupplementary guidancein"Guidelines onQualityAssurance Requirements DuringtheOperations PhaseofNuclearPowerPlants,"Revision0,October1973(OrangeBook-Revision 0).Requirements fortheonsitereviewfunctionmeettheguidelines ofANSI/ANS3.2-1988, section4.3inlieuofANSIN18.7-1976, section4.4andANSIN18.7-1972, section4.5.Regulatory Guide1.36Rev.(0)-Nonmetallic ThermalInsulation forAustentic Stainless SteelRegulatory Guide1.37Rev.(0)-Quality Assurance Requirements forCleaningofFluidSystemsandAssociated Components ofWater-Cooled NuclearPowerPlantsAdoptedConformsThisRegulatory Guideisadoptedforthetestingofinsulating materials installed onornearsafetyrelatedstainless steelpiping.Insulating materials arenotconsidered basiccomponents pursuantto10CFR21andthusthesupplierisnotrequiredtohaveaqualityassurance programtocoverthetesting,lotcontrol,andcontamination controlprovisions ofthisRegulatory Guide;Aqualityassurance programsimilarto10CFR50,AppendixBisappliedtothehandling, storage,andinstallation ofinsulating materials onornearGinnaStationsafetyrelatedstainless steelpipingandcomponents.

RG1.37Rev.(0)incorporates ANSIN45.2.1-1973.

Regulatory Guide1.38Rev.(2)-Quality Assurance Requirements forPackaging,

Shipping, Receiving, Storage,andHandlingofItemsforWater-Cooled NuclearPowerPlantsConformsRG1.38Rev.(2)incorporates ANSIN45.2.2-1972.

Regulatory Guide1.39Rev.(2)-Housekeeping Requirements forWater-Cooled NuclearPowerPlantsConformsRG1.39Rev.(2)incorporates ANSIN45.2.3-1973.

RGBAPSO,Revision21 0oE TABLE17.1.7-1(coat'd)StandardRuirementorGuideRegulatory Guide1.54Rev.(0)-Quality Assurance Requirements forProtective CoatingsAppliedtoWater-Cooled NuclearPowerPlantsCoaf~olace StatusAlternative fkeelmdts Qualityassurance requirements applyonlywhenacoatingperformsasafetyrelatedfimctioainsteadoftheprovisions statedinthisRegulatory Guideanditsreferenced

standard, ANSIN101A-1972.SootheUFSARforqualityassuraace requiremeats usedforexistiagcoatings.

Fornewcoatingsandconfiguration changestoexistingcoatings, eitherthequalityassurance requirements oftheUFSARorthoqualityassurance requirements of10CFR50,AppendixBareusedinsteadofthedetailedrequirements includedinthisRegulatory Guide.Regulatory Guide1.58Rev.(1)-Qualification ofNuclearPowerPlantInspection, Examiaation, andTestingPersonnel Regulatory Guide1.64Rev.(1)-Quality Assurance Requirements forDesignofNuclearPowerPlantsRegulatory Guide1.74Rev.(0)-Quality Assurance TermsandDefinitions Regulatory Guide1.88Rev.(2)-Collection, Storage,andMaintenance ofNuclearPowerPlantQualityAssurance RecordsConformsConformsConformsConformsRG1.58Rev.(1)incorporates ANSIN45.2.6-1978.

RG1.64Rev.(1)incorporates ANSIN45.2.11-1974.

RG1.74Rev.(0)incorporates ANSIN45.2.10-1973.

Somedefinitions usedbyGianaarewordeddifferently thanthoseinthisstandard; however,thogeneralmeaningsarethesame.RG1;88Rev.(2)incorporates ANSIN45.2.9-1974.

Regulatory Guide1.94Rev.(1)-Quality Assurance Installation, Inspections, andTestingofStructural ConcreteandStructural SteelDuringtheConstruction PhaseofNuclearPowerPlantsNotapplicable RG1.94Rev.(1)incorporates ANSIN45.2.5-1974.

Regulatory Guidoappliestoplantsinthoconstruction phaseandwasissuedafterGinnawasbuilt.Regulatory Guide1.116Rev.(O-R)-Quality Assurance Requirements forInstallation, Inspections, andTestingofMechanical Equipment andSystemsRegulatory Guide1.123Rev.(1)-Quality Assurance Requirements forControlofProcurement ofItemsandServicesforNuclearPlantsConformsConformsRG1.116Rev.(O-R) incorporates ANSIN45.2.8-1975.

RG1.123Rev.(1)incorporates ANSIN45.2.13-1976.

RGSEQAPSO,Revision21 TABLE17.1.7-1(cont'd)LStandardRuirementorGuideRegulatory Guide1.143Rev.(1)-Design GuidanceforRadioactive WasteManagement Systems,Structures, andComponents Installed inLight-Water-Cooled NuclearPowerPlantsRegulatory Guidel.144Rev.(1)-Auditing ofQualityAssurance ProgramsforNuclearPowerPlantsRegulatory Guide1.146Rev.(0)-Qualiflication ofQAProgramAuditPersonnel forNuclearPowerPlantsRegulatory Guide1.152Rev.(0)-Criteria forProgrammable DigitalComputerSystemSoftwareinSafety-Related SystemsofNuclearPowerPlantsRegulatory Guide4.15Rev.(1)-Quality Assurance forRadiological Monitoring Program(NormalOperations)-Effluent StreamsandtheEnvironment Regulatory Guide7.10Rev.(1)-Establishing QualityAssurance ProgramsforPackaging UsedintheTransport ofRadioactive Material10CFR2110CFR50,AppendixA-General DesignCriteria10CFR50,AppendixB-Quality Assurance CriteriaforNuclearPowerPlants10CFR50.55a-Licensing ofProduction andUtilization Facilities (ASMEBoilerandPressureVesselCode,SectionXI-RulesforInservice Inspection ofNuclearReactorCoolantSystems)Conformance StatusAlternative ConformsConformsNotapplicable AdoptedAdoptedConformsAlternative ConformsConformsRemarksSeetheUFSARfordesignandqualityassurance provisions appliedtoexistingradioactive wastemanagement systems,structures, andcomponents.

Newsystems,structures, andcomponents andconfiguration changestoexistingitemsmeetthedesignandqualityassurance provisions described intheUFSARorthosespecified bythisRegulatory Guide.RG1.144Rev.(1)incorporates ANSIN45.2.12-1977.RG1.146Rev.(0)incorporates ANSIN45.2.23-1978.

'Ginnadoesnotcurrently useprogrammable digitalcomputers insafetyrelatedapplications.

Noapplications foruseofsoftwarecoveredbythisRegulatory Guidearepending.GinnaconformstotheintentofthisRegulatory Guideasaddressed intheProcessControlProgramandapplicable toGinnaeffluentandenvironmental radioactivity measurements.

GinnaconformstotheintentofthisRegulatory Guideasaddressed intheProcessControlProgram.ThesecriteriawereindraftformornotwrittenatthetimeGinnawasdesignedandbuilt.Forexistingsystems,seeUFSARforcriteriaapplied.Newsystems,structures, andcomponents, andconfiguration changestoexistingitemsmeetthecriteriaasdescribed intheUFSARor10CFR50,AppendixA.10CFR50.55 Specifies ASMESectionXIcodedates.TheGinnaprogramconformsto10CFR50.55a withthespecificeditionsandaddendaofSectionXIspecified intheInservice Inspection Plan.RGEEQAPSO,Revision21 TABLE17.1.7-1(cont'd)SdaureedNahrmmmStatus10CFR50.55(e)-Conditions ofConstruction PermitsNotapplicable Regulatory Guideappliestoplantsintheconstruction phase.10CFR55-Operators Licenses10CFR55,AppendixA-Requalification ProgramsforLicensedOperators ofProduction andUtilization Facilities ConformsConformsRegulatory Positions 2and4ofBranchTechnical PositionCMEB9.5-1Alternative Fireprotection controlsareinaccordance withAPCSB9.5-1,regulatory positionIVb.6andIVb.7.GenericLetter89M,anditsendorsement ofEPRINP5652"Guideline fortheUtilization ofCommercial GradeItemsinSafety-Related Applications (NCIG%7).ANSI/ANS3.1-1987, Selection, Qualification andTrainingofPersonnel forNuclearPowerPlants,section4.7.ConformsConformsQualification requirements forNSARBmembersareaddressed bythisstandard.

RG&EQAPSO,Revision21 lO0tD0SENORVICEtltKSCDENT CORtOIIATK SBIVICE5~~ooLWESOFFINCTKHIAL ItKPORTINO UNKSOFSUPERVISION AMOADVWISTRATION CNANIMANOFTNKSOAltD,tMESOENT,ANDCISEFEXECUTIVE OFFICEREXECUTIVE VICEtltKSIDKNT SENORVICK tltESDENT, CU5TOMBtOPSMTOMS~oo~oot,~~+NSlllaDIVISIONMANAOEltNFORMATlOM 5KIWCKSDIVISIONMANAOStSVFPOItTSSLYCESOVISONMANAOBtENStOYDEUVERYIIDEPARTMENT MANAOEltHUMANItESOVltCK SERVICESEMPLOYEEItEIATIONS DEPAltTMENT MAMAOKltDISTRISUTIVK IHF0RMATlONSYSTEMSSVttOltTCONVVNICAllONS MANAOBttROOVCIION SVttOltT5BIVICESTECHNICAL WIORMATONCENTElt,WFORMATRN SBWCKS5NVISONSYSTEMSOftAIITMENTMANAOKltTECHNICAL SERVICESFACRIIIES, PROJECTMANAOSIBIT5StNCES.RE4HOWEERSKL EMVVIOMMENTAL SfltVICES ANDCOlttOIIATK SAFETYMANAOEltIASORATDRY SERVICESENVVIONMENTAL SCIENCE,LASORATORY CNSRSTRY5BIVICKSoMATBVALSENOINKERGO,ISI5MNENSPKCllON 5BtNCKSANDElfCTIUCIASORATORY 5SIVICESDEPARTMENT MANAOKRSYSTEMDEMONKNOWESWKIREIAYKMOWKBVHO SVSSTATXHI ENONKERNODKPAltTMENT MANAOEIIOVKIUIKAO CONSTltVCllOM AMDMANTBIANCK EASTCON5TltUCOON ItEIAYTESTDEPAltTMENT MANAOKRNUCLEARKHONKKltNO SSIVICESKNOWEERWO4COMtVTEIt

5VPtOltT, COMFIOVRATHHI MANAOEMEMT AN)TECHIDCAL tltOCE5555, NVCLfAltSAFETYAMOUCENSSKLELKCTIUCALSIONKBWO, MECHANICAL EHOWESINOAMDSTltUClVltAL ENONKERNO 5VtfRPITENDSIT OWNAPRODVCIlON ttANTMANAOKRONNASTAllONMANTSIANCK

~tLANNSIOOYSTKMS, MANTENANCK ItULKPROJECT,ILCAMDKLECITVCAL MAIHTSIANCE, ANDMECHANICAL MANTKHAHCE ILoooooo@PORCMAMAOSttROCVltEMENTAMO'VENTOtY CONTltOLMANAOSt~HYSCAL5SIVICESMATSVALPROCUREMEMT 4CONTROLANDKtfCDVC5OASMKTKItOPERATKNSOENKRALMASITKHANCK FIELD5SHOPFA5IVCATXNI SStVCKS.TRANSPORTATOHANDSUltVKTNO 5SWCKSNUCLEARA55INANCE, OUAUlYASSURAHCILtltOCKSSIMPROVEMENTo

~VSUCSAFEIYANDACCKtTANCK SUPPORT,OPStATWOEZPBVBICE, ANDNUCLEAREMEROENCY

~REPAREDNESSSUPBMSORSVDOSTANDCOOTPROJECTMANAOBI5TEAMOSISIATOIt ltfttACKMKNT 17.2PERFORMANCE VERIFICATION 17.2.1Methodology Allpersonnel performing qualityaffecting activities involvedintheoperation andsupportofGinnaStationaredirectlyresponsible forquality.Employees areempowered tomakedecisions intheirareasofresponsibility andareheldaccountable forthequalityoftheirownwork.Verification ofworkisperformed byeachorganization toassurethatqualityobjectives areachievedand.established performance standards aremet.TheNuclearOperations Divisionandsupporting organizations involvedinGinnaqualityrelatedactivities accomplish andverifytheirworkusinginstructions andprocedures.

Forqualityaffecting activities withintheirareaofresponsibility, eachorganization

develops, reviews,approves, andimplements suchdocuments.

Theactivities coveredincludeoperation, maintenance, repair,inservice inspection, refueling, procurement, modification, specialprocesses, inspection andtesting,documentcontrolandrecordsmanagement, trainingofpersonnel, andauditandsurveillance.

Inaddition, RG&Esuppliers andcontractors arerequiredtohaveappropriate instructions andprocedures asspecified inprocurement documents.

Personspreparing, reviewing, andapproving instructions andprocedures areresponsible forassuringthattheyincludeappropriate quantitative orqualitative acceptance criteriafordetermining thatimportant activities havebeensatisfactorily accomplished.

Inaddition, theyassurethatthesedocuments arekeptcurrent.17.2.2DesignControlPlantconfiguration changes,including temporary changes,areimplemented utilizing designcontrolmeasuresatleastcommensurate withthoseappliedtotheoriginaldesign.NuclearEngineering Servicesisthedesignauthority forGinnaStation.Otherorganizations areauthorized toperformdesignactivities asdesignated intheNuclearPolicyManualandsupported byapprovedprocedures andinstructions.

Designcontrolmeasuresaredefinedandimplemented bytrainedandqualified personnel throughapprovedprocedures andinstructions.

Theseprocedures andinstructions assurethat:~Designinputsareappropriately specified onatimelybasisandcorrectly translated intodesigndocuments.

RG&EQAPSO,Revision21-24-December21,1994

~Designinterfaces areidentified andcontrolled.

~Thedesignissuitableforitsintendedapplication.

Designadequacyisverifiedbypersonnel otherthanthosewhoperformed thedesign.~Designchanges,including fieldchanges,aregovernedbycontrolmeasures.

~Deviations andnonconformances arecontrolled.

~Designrecordsareidentified, controlled, andretrievable.

Designinputs(suchasdesignbases,performance requirements, regulatory requirements, codes,andstandards) andchangestodesigninputsareidentified, documented, reviewedandapproved, andcontrolled.

Designdocuments, including drawingsandspecifications, arepreparedandtechnically reviewedbyqualified personnel.

Thetechnical reviewerensuresthatthedesigndocumentisinaccordance withthedesignconcept,incorporates appropriate designinputs,andconformstoapprovedprocedures andinstructions.

Designchangepackagesareapprovedbyappropriate management orsupervision priortoreleaseforimplementation.

Designinterfaces, bothinternalandexternal, areformallyidentified',

anddesignactivities arecoordinated amongtheparticipating organizations toensurethatdesigninputsandoutputsareproperlydeveloped,

reviewed, approved, anddistributed.

Multi-discipline changesarereviewedtoensureintegration ofdesignoutputs.DesignchangesarereviewedtoensurethatthechangedoesnotresultinachangetoplantTechnical Specifications oranunreviewed safetyquestion, undertheprovisions of10CFR50.59 withoutNRCapproval.

Designdatabases,documents, andprocedures arerevisedtoreflectchangesinstalled intheplant.Designrecordsareidentified, indexed,andcontrolled toallowforretrievability ofdesignbasisinformation andtoprovideevidenceofappropriate designcontrols.

RGaEQAPSO,Revision21-25-December21,1994 r~~I~pi17.2.3DesignVerification Designverification istheprocessofreviewing, confirming, orsubstantiating thedesigntoassure:theacceptability ofthedesigninputsadherence tothedesignprocessthatthedesigninputsarereflected inthedesignoutputsthatdesignchangesareimplemented undercontrolscommensurate withthoseappliedtotheinitialdesign.Procedures defineacceptable verification methodsandcontrols, designparameters subjecttoverification, acceptance

criteria, andverification documentation andrecordsrequirements.

Adesignchangeisverifiedpriortoreleaseofthechangetoperformitsdesignfunction.

Adesignmaybereleasedforprefabrication orinstallation priortocompletion ofthedesignverification onlyifappropriate controlsareestablished.

Thescopeofworkthatcanbecompleted mustbedefinedandcontrolsimplemented toensurethatdesignverification iscompleted priortouseofthechange.Verification methodsinclude:~performance ofdesignreviews~useofalternate calculations

~performance ofqualification tests.Ifused,qualification testsshallverifytheadequacyofthespecificdesignordesignfeatureunderthemostadversedesignconditions, unlessthoseconditions cannotbegenerated withoutinitiating aplanttransient.

Inthosecases,simulated orextrapolated conditions areused.Designverification isperformed bytechnically qualified individuals otherthanthosewhodeveloped thedesign.Designverification bythedesigner's immediate supervisor isallowable ifotherqualified individuals arenotreadilyavailable.

Thedesigner's supervisor documents independence fromthedesigndevelopment whenrequiredtoperformaverification.

Thedesignorganization determines theextentofverification

required, baseduponsafetysignificance, thedegreeofstandardization, andthestate-of-the-art ofthechange.RG&EQAPSO,Revision21-26-December21,1994 17.2.4Procurement ControlPurchased
material, equipment, andservicesarecontrolled usingfivemajormeans:planningprocurement documentrequirements supplierselection controlofsupplierperformance acceptance ofitemsandservices.

Allprocurement isconducted inaccordance withprocurement documents andgoverning procedures.

Allreviews,inspections, surveillances, andauditsareconducted bypersonnel whoarecompetent todetermine whetherasupplieriscapableofproviding acceptable qualityproducts.

~PlannlnProcurement planningbyprocuring organizations consistsofdetermining thesupplierofchoice,methodstobeusedforacceptance oftheitemorservice,andrequirements forcontrolofsupplierperformance.

Sourceinspection (surveillance),

certificate ofconformance, receiptinspection, andpre-orpost-installation testingaremethodswhichareconsidered foritemacceptance.

Theextentoftheacceptance methodsandassociated verification activities willvarydepending upontherelativeimportance andcomplexity ofthepurchased itemorserviceandthesupplier's pastperformance.

Procurement DocumentReuirements Procurement documentcontrolfortheprocurement ofmaterials, parts,components, andservicesisinitiated bydepartment staffpersonnel.

Procurement procedures requirethatorganizations preparing procurement documents considerandinclude,asappropriate:

scopeofworktechnical requirements QualityAssurance Programrequirements rightofaccessdocumentation requirements reporting requirements (nonconformance and10CFRPart21)Changesorrevisions toprocurement documents aresubjecttothesamereviewandapprovalrequirements astheoriginaldocuments.

Originating department reviewofprocurement documents includesverification ofapplicable regulatory, code,anddesignrequirements andsuitability forintendedservice.Inaddition, averification ofproperinclusion ofthequalitystandards, qualityassurance programrequirements, methodofprocurement, RG&EQAPSO,Revision21-27-December21,1994 andtheapplicable acceptance criteriaisperformed.

Forspareorreplacement parts,procurement documents arereviewedtodetermine similarity to,compatibility with,andacceptance criteriacommensurate withtheoriginaldesign.SulierSelection Selection ofasupplierisbasedontheevaluation oftheircapability toprovidetheitemsorservicesinaccordance withprocurement documentrequirements.

Theevaluation, whichisaccomplished duringprocurement

planning, determines thenecessity forthesupplierselection tobemadefromtheapprovedsuppliers list.Foritemsandservicesprocuredfromsuppliers requiredtohaveaqualityassurance program,supplierselection ismadefromtheapprovedsuppliers listorfromthosewhoareintheprocessofbeingaddedtothelist.Additionofasuppliertotheapprovedsuppliers listisbasedonsatisfactory evaluation ofthesupplier's qualityassurance program.Theevaluation guidelines forsourceselection considers thecomplexity oftheitem,method(s) ofacceptance, and,forareplacement item,whetherthesourceistoberestricted totheoriginalsupplier.

Itemsorserviceswhichmeetindustrystandards andaretypically utilizedinapplications otherthannuclearmaybepurchased fromsuppliers notlistedontheapprovedsuppliers list,providedthatitemacceptance throughreceiptinspection canbebasedonacceptance ofstandardcommercial quality.Thisissupplemented, asnecessary, withsourcesurveillance, pre-orpost-installation tests,receipttests,commercial suppliersurveys,suppliertestreports,orcommercial suppliercertificates.

Forcommercial gradeitemsandservices, anevaluation ofintendeduseiscompleted todetermine criticalcharacteristics whichmustbeverifiedpriortoacceptance foruse.ControlofSulierPerformance Controlofsupplierperformance includesmonitoring andevaluation byrequesting submittal ofsupplierdocuments forreviewandbyidentifying necessary changesforwhichnonconformances aretobereported.

Controlisalsoexercised throughsurveillance ofsupplieractivities asnecessary.

AccetanceofItemsandServicesTheverification methodsfortheacceptance ofitemsandservicesarespecified duringprocurement planningandpurchaserequisition preparation.

Receiptinspection isaverification methodcommonfortheacceptance ofallitems.17.2.5Procurement Verification RG&EQAPSO,Revision21-28-December21,1994 I1f~

Thesupplier's overallqualityassurance organization andprogramisevaluated inaccordance withapplicable partsof10CFR50,AppendixB;codesandstandards; andRG&Erequirements.

Suppliers ontheapprovedsuppliers listarereviewedannuallyforperformance andprogramchanges,andauditedatleasteverythreeyears.Theprocuring department isresponsible fordetermining anddocumenting thedegreeofsuppliersurveillance (including review,inspection, oraudit)requiredduringdesign,fabrication, inspection, testing,andshipping.

Theobjectives ofsuppliersurveillance aretoprovideasamplingreviewofthesupplier's qualityassurance programimplementation andtoverifyproductconformance withrespecttothepurchaseorderrequirements.

Theextentofsuppliersurveillance willbeconsistent withthesafetysignificance, complexity,

quantity, andfrequency ofprocurement oftheitemorservice.Asnecessary, thismayrequireverification oftheactivities ofsuppliers belowthefirsttier.Theverification responsibilities forevaluation andsurveillance ofsupplieractivities areassignedtoQualityAssurance.

Department supervision isresponsible forreceiptandcontrolofitemspendingtheiracceptance.

Receiptinspection isperformed foritemsandassociated servicesformaintenance, repair,modification, andrefueling.

Inspections areperformed toverifyacceptability.

Tobeacceptable, theitemsandservicesmustconformtoprocurement documents, havesatisfied requiredinspection andtestrequirements, andhavedocumentary evidenceofconformance available attheplantpriortoinstallation oruse.Personnel performing receiptinspection andtestactivities aretrainedandqualified.

17.2.6Identification andControlofItemsTheidentification andcontrolofmaterials, parts,andcomponents (including consumable materials anditemswithlimitedshelflife)isaccomplished inaccordance withwrittenrequirements andappliesinanystageoffabrication, storage,orinstallation.

Identification andcontrolrequirements areestablished eitherbyanexistingprocedure orbyrequirement documents preparedduringtheplanningstagesofaproject.Theidentification andcontrolrequirements cover:~Traceability toassociated documents (suchasdrawings, specifications, purchaseorders,manufacturing testdataandinspection documents, andphysicalandchemicalmilltestreports).

RG&EQAPSO,Revision21-29-December21,1994

~Specification ofthedegreeofidentification toprecludeadegradation oftheitem'sfunctional capabi'lity orquality.~Properidentification ofmaterials, parts,andcomponents priortoreleaseformanufacturing,

shipping, construction, andinstallation.

NuclearEngineering Services's responsible forassuringthatdrawingsandspecifications containappropriate requirements fortheidentification andcontrolofmaterials, parts,orcomponents.

Suppliers arerequiredtoassurethatallrequireddocumentation foranitemisproperlyidentified andrelatedtotheitem.17.2.7Handling, Storage,andShippingTheNuclearOperations Divisionandsupportorganizations areresponsible fordeveloping andimplementing procedures forthehandling, storage,shipping, preservation, andcleaningofqualityrelatedmaterialandequipment.

Theseprocedures provideguidelines toprotectitemsfromdamage,loss,anddeterioration.

Also,itemsaremarkedorlabeledduringpackaging,

shipping, handling, andstoragetoidentifyandmaintaintheitems'ntegrity andtoindicateneedforspecialcontrols.

Undernormalcircumstances, manufacturer's specificwritteninstructions andrecommendations andpurchasespecification requirements areinvokedforcleanliness, preservation, specialhandling, andenvironmental requirements forstorage.Intheabsenceof,orinadditionto,specificmanufacturer requirements, management mayinvokerequirements inaccordance withdepartment procedures.

Examplesofsuchrequirements includedesiccants, shelflife,endcaps,andspecialpackaging requirements.

Procurement documents andengineering specifications definerequirements forthehandling,

shipping, storage,cleaning, andpreservation ofnewfuelandfuelassemblies, materials, andequipment.

Whennecessary tomaintainacceptable quality,specialprotective measures(suchascontainers, shockabsorbers, etc.)arespecified andprovided.

Procedures areestablished fortheroutinemaintenance andinspection ofliftingandhandlingequipment andforthehandlingofheavyloadsandsafeloadpaths.RGEEQAPSO,Revision21-30-December21,1994

~~~)17.2.8TestControlTheGinnaStationtestprogramincludesthesurveillance testprogramrequiredbyTechnical Specifications, inservice pumpandvalvetesting,andtestingfollowing modification andmaintenance.

Thetestprogramrequirestheidentification, control,anddocumentation ofalltestsandthepreparation ofwrittenprocedures requiredforsatisfactory accomplishment ofthetesting.Writtenprocedures andchecklists forthetestingprograminclude:instructions andprerequisites toperformthetest,useofpropertestequipment, inspection holdpoints,andacceptance criteria.

Testingisutilizedasfollows:~Todetermine continued operability ofinstalled structures, systems,andcomponents consistent withthesurveillance requirements ofTechnical Specifications andtheinservice pumpandvalveprogram.~Todemonstrate theabilityandtosupportthequalification ofsafetyrelatedequipment tofunctioninharshenvironmental conditions.

~Todemonstrate theacceptability ofreplacement andpurchased items.~Tosupporttroubleshootingandinvestigation ofdegradedconditions.

~Todemonstrate theacceptability ofitemsinvolvedinmaintenance, repair,andmodifications.

Contractors whoperformtestingarerequiredtodosoinaccordance withRGEE'sprocurement documentrequirements.

Alltestresultsarerequiredtobedocumented,

reviewed, andapprovedbythoseresponsible forperforming thetest.Unacceptable testresultsandtestanomalies areevaluated inaccordance withestablished procedures todetermine thecauseoftheproblemandtheneedforretestorforincreasing testfrequency.

Thedesignorganization isresponsible forassuringthatrequiredtestsformajormodifications areincludedinspecifications orprocedures.

RG&EQAPSO,Revision21December21,1994 l1~~0 17.2.9Measuring andTestEquipment ControlProgramsareestablished whichassurethattestinstruments, tools,gauges,shopandreference standards, andothermeasuring andtestingdevicesusedinactivities affecting qualityareproperlycontrolled andcalibrated.

Elementsofcontrolincludecalibration procedures, establishment ofcalibration frequencies, andmaintenance requirements formeasuring andtestequipment.

Calibration procedures includestep-by-step calibration methodsandrequirements forinstrument accuracy.

Calibration frequency isbasedonrequiredaccuracy, degreeofusage,stability characteristics, manufacturer's recommendations, experience, andotherconditions affecting measurement capability.

Theprogramforcontrolofmeasuring andtestequipment includes:

~Assuringtimelycalibration ofequipment.

~Providing uniqueidentification ofthenextcalibration dateontheequipment calibration tagsorstickersandtraceability tocalibration testdata.~Providing traceability ofshopstandards tonationally recognized standards andperiodicrevalidation ofshopstandards.

Wherenationalstandards donotexist,procedures containinstructions todocumentthebasisforcalibration.

Exceptwherestandards withthesameaccuracyastheinstruments beingcalibrated areshowntobeadequatefortherequirements, calibration standards aretohaveagreateraccuracythanthestandards beingcalibrated.

~Assuringthatcalibrating equipment iscalibrated againststandards thathaveanaccuracyofatleastfourtimestherequiredaccuracyoftheequipment beingcalibrated or,ifnotpossible, haveanaccuracythatensurestheequipment beingcalibrated willbewithintherequiredtolerance.

~Providing forrecordstobemaintained whichindicatethecompletestatusofallitemsunderthecalibration systemincluding themaintenance, calibration results,abnormalities, andlastandfuturecalibration dates.~Controlling thepurchaserequirements ofnewequipment tobeenteredintothecalibration andcontrolsystemincluding requirements foraccuracy, stability, andrepeatability undernormaluseconditions.

Intheeventameasuring instrument (i.e.,shoporfieldstandard) isfoundoutofcalibration, aninvestigation isconducted todetermine thevalidityofpreviousmeasurements.

RGSEQAPSO,Revision21-32-December21,1994

~y~~Responsibilities andrequirements fortheselection anduseofcalibrated measuring andtestequipment aredescribed intheNuclearPolicyManualandrelatedprocedures.

Installed plantinstrumentation issubject,to calibration andcontrolrequirements ofTechnical Specifications andisnotsubjecttocalibration andcontrolrequirements formeasuring andtestequipment.

TheNuclearPolicyManualamplifies responsibilities andrequirements forinstalled plantinstruments.

17.2.10Inspection, Test,andOperating StatusEquipment orsystemsnotreadyfornormalserviceareclearlyidentified byuseoftags,controllogs,andothersuitablemeanstoindicatethestatusoftheitemsbeingisolatedinordertopreventtheirinadvertent use.GinnaStationisresponsible forindicating thestatusofoperating equipment orsystemstoberemovedfromserviceformaintenance, repair,ormodification inaccordance withtheapprovedElectricSystemOperating Rules.Systemstatusisindicated throughtheuseofholdtags,blocktags,andcorresponding controllogs.Equipment orsysteminspection andteststatusareindicated byuseoftesttags,labels,orstatussheets.Writtenprocedures controltheuseofholdtags,testtags,andlabels.Personnel whohavestationholdingauthority, asdesignated bythePlantManager,areresponsible fordirecting thestatuschangeofequipment andsystemsinaccordance withtheapprovedstationholdingprocedures.

Jobcontroldocuments areusedtoindicatestatusofthework,inspections ortests,andcorresponding acceptance orrejection criteria.

Thesejobcontroldocuments precludetheinadvertent bypassing ofinspections andtests.Theyaremaintained atadesignated controllocationtoindicatethestatusandthecompletion ofrequiredinspections andtests.Measuresareestablished tomonitorthecompletion statusofinservice inspection.

RG&EQAPSO,Revision21-33-December21,1994 17.2.11SpecialProcessControlWrittenprocedures areestablished tocontrolspecialprocesses, suchaswelding,brazing,heattreating, andnondestructive examination toassurecompliance withapplicable codes,standards, anddesignspecifications.

Qualification ofpersonnel andspecialprocessprocedures complywiththerequirements ofapplicable codesandstandards.

Whenspecialprocessqualification requirements arenotincludedinexistingcodesandstandards, theyaredescribed inprocedures whichgivedetailsofthespecialprocess,personnel qualification requirements, equipment necessary, andspecialprocessqualification requirements.

TheNuclearPolicyManualdescribes thecriteriathatdefinewhichprocesses arespecial.Thesecriteriaincludeprocesses whicharehighlydependent ontheskilloftheworkerorthecontroloftheprocessorboth,andinwhichthedesiredqualitycannotbereadilydetermined byinspection ortest.Procuring organizations areresponsible forrequiring suppliers, inprocurement documents, tocontrolspecialprocesses inaccordance withtheaboverequirements.

Specialprocessprocedures submitted bysuppliers andcontractors arereviewedforadequacybyRG6E.NuclearAssurance andtheGinnaStationMaintenance organization areresponsible forassuringthatpersonnel performing specialprocesses undertheircognizance arequalified andareusingqualified procedures.

Materials Engineering andInspection Servicesisresponsible forthequalification ofspecialprocesspersonnel andprocedures.

Qualification ofpersonnel andprocedures isdocumented.

17.2.12Inspection Procedures prepared.

forthecontrolofactivities includeinspection requirements andholdpointsasrequiredbydrawings, instructions, requirement documents, specifications, codes,standards, orregulatory requirements.

Forclarification, andtodistinguish frompreventive maintenance inspections, thefollowing controlsareassociated withthequalityassurance functioninspections andreferredtoasverification inspections.

Verification inspection planningisusedtodetermine theoptimummethodforperforming holdpointorfinalinspections.

Planningconsiderations include:holdpointexecution bywitnessorinspection, theneedforcalibrated measuring toolsandequipment, useofsampleplansformultiplequantities, andtheneedforotherverification options(e.g.,non-destructive examination)

.RG&EQAPSO,Revision21December21,1994 Holdpointsareusedasnecessary toensurethatinspections areaccomplished atthecorrectpointsinthesequenceofworkactivities.

Verification inspection procedures include:identification ofqualitycharacteristics tobeinspected adescription ofthemethodofinspection tobeusedacceptance andrejection criteriarequirements forrecording the-inspection resultstheneedtoprovideevidenceofinspection activitycompletion.

Verification inspections areperformed byinspection personnel whoareappropriately qualified andindependent.

Theyareperformed inaccordance withapprovedprocedures, instructions, orplanstosupportpreplanned holdpoints,finalacceptance verification, orreceiptacceptance activities.

Inspection resultsarerequiredtobedocumented.

Whenitemsarereworked, thereworkisreinspected totheoriginalorequivalent requirements.

Outsidecontractors arerequiredbyprocurement documents tohaveandtofollowsimilarprocedures andtouseindependent inspectors.

17.2.13Corrective ActionConditions adversetoqualityarethoseconditions whichreduceconfidence thatastructure, system,orcomponent atGinnaStationwillperformsatisfactorily inservice.Significant conditions adversetoqualityarethoseconditions which,ifuncorrected, couldaffectthehealthandsafetyofthepublic,seriously affecttheabilitytooperatetheplantinasafemanner,represent aseriousbreakdown inactivitycontrols, orwillrequireamajorefforttorestorecapability toperformspecified functions.

Conditions adversetoqualityarepromptlyidentified, reportedtosupervision, corrected, andevaluated todetermine ifasignificant condition adversetoqualityexists.Whenasignificant condition adversetoqualityisidentified, anevaluation oftheeffectofcontinuing theactivityisperformed.

Ifcontinuing theactivitywouldobscureorprecludeidentification andcorrection ofthedeficiency, orifcontinuing theactivitywouldincreasetheextentofthedeficiency orleadtoanunsafecondition, stopworkactionistaken.RG&EQAPSO,Revision21-35-December21,1994 NuclearAssessment hasauthority tostopworkonallactivities atorinsupportofGinnaStation,withtheexception ofoperating deficiencies.

Foroperating deficiencies, NuclearAssessment mayrecommend stopworkactiontostationmanagement.

Forsignificant conditions adversetoquality,RG&Emanagement reviewsinitiated reportstodetermine causes,developscorrective actionplanstoresolvethecondition, andtakesactiontoprecluderecurrence.

Procedures areestablished forthecontrol,evaluation, anddisposition ofdeficient

material, parts,andcomponents topreventtheirinadvertent test,installation, oruse.Itemswhichdonotconformtothedrawingorspecification requirements areidentified, controlled, andreported.

Nonconformances identified atasupplier's facilityandreportedtoRG&E,forwhichthesupplierhasrecommended adisposition ofuse-as-is orrepair,arenormallyreviewedandthedisposition approvedbytheprocuring organization.

Itemsarerepairedandreworkedinaccordance withapprovedprocedures anddrawings.

Therepairorreworkmustbeverifiedasacceptable byaninspection oftheaffecteditemorprocesswhichisatleastequaltotheoriginalinspection method.Itemswhichareaccepted"use-as-is" arefullydocumented withthedrawingorspecification requirement andtechnical justification foracceptance, andarescreenedundertherequirements of10CFR50.59.

Nonconformance statusinformation iscompiledandanalyzedforadversetrendsandprovidedtomanagement.

17.2.14DocumentControlDocumentcontrolrequirements contained intheNuclearPolicyManualcontroltheissuanceofprocedures, instructions,

drawings, andspecifications.

GinnaStationandRecordsManagement areresponsible forthecontrolofalldocuments issuedbyGinnaStationpersonnel.

Eachorganization hasprocedures forcontrolling documents inaccordance withtherequirements oftheNuclearPolicyManual.Eachorganization responsible foranactivityisalsoresponsible forproviding thenecessary reviewandapprovalofinstructions, procedures, ordrawings.

Suchreviewistoassurethatdocuments areadequate, includeappropriate qualitative andquantitative requirements, andincludequalityassurance requirements.

RGSEQAPSO,Revision21-36-December21,1994 Changestoprocedures specified intheAdministrative ControlsSectionoftheTechnical Specifications receiveatechnical reviewinaccordance withANSI/ANS3.2-1988, Section4.2.Changesarealsoreviewedrelativetotheirsafetysignificance byanindependent reviewerdesignated bythePORCChairmanorPlantManagerandsubsequently approvedbythePlantManagerordesignee.

Changesthatmayaffectnuclearsafetyarereferredtoandsubsequently reviewedbyPORC.Thequalifications ofthedesignated reviewerareequivalent tothoseofregularPORCmembersandmeetANSIStandardN18.1-1971, Section4.3.1or4.4asapplicable.

Temporary changestoprocedures thatdonotaltertheintentoftheprocedure, inadditiontothereviewprocessdescribed above,areapprovedbytheShiftSupervisor andsubsequently approvedbythePlantManagerordesigneewithin10daysofimplementation.

Requirements forthepre-approval reviewofGinnaStationprocedures andthetemporary changeprocessareconsistent withtheguidelines ofANSIN18.7-1972, Sections5.4and5.5.TheNuclearPolicyManualrequiresthatdocuments becontrolled asappropriate, considering thetypeofdocument, safetysignificance, andintendeduse.Typesofdocuments whicharecontrolled includeTechnical Specifications, UFSAR,NuclearDirectives, procedures,

drawings, andspecifications.

Suppliers ofmaterials, equipment, andserviceshavinganapprovedqualityassurance programarerequiredinprocurement documents toprovideforcontrolofdocuments.

TheNuclearPolicyManualrequiresthateachorganization provideinitsprocedures formeasuresto:~Assurethatdocuments areavailable whenrequired.

~Properlyreviewandapprovedocuments suchasprocedures andinstructions.

Providethesamereviewsandapprovals forchangestodocuments aswasrequiredoftheoriginaldocument.

Requirethatorganizations whichreviewandapprovedocuments haveaccesstopertinent information andadequateknowledge oftheoriginaldocumentintent.Assurethatapprovedchangesarepromptlytransmitted forincorporation intodocuments.

RGEEQAPSO,Revision21-37-December21,1994

\t'

~Assurethatobsoleteorsuperseded documents areeliminated fromthesystemandnotused.17.2.15RecordsTheNuclearPolicyManualdefinesresponsibility andestablishes thebasicrequirements forqualityassurance recordretention andmaintenance.

Organizations performing qualityaffecting activities areresponsible forforwarding therecordstheyinitiatetotheappropriate RecordsManagement retention location.

Eachorganization generating recordsisresponsible forpreparation, review,approval, andimplementation ofspecificqualityassurance recordprocedures fortheirareaofresponsibility.

Recordstobecontrolled aredelineated inANSIN45.2.9-1974.

Sufficient recordsofitemsandactivities aregenerated andmaintained todocumentcompleted work.Itemsandactivities requiring recordsinclude:designengineering procurement manufacturing construction inspection andtest(e.g.,manufacturer's proofandreceipt)installation operations maintenance modification auditsRequirements andresponsibilities forpreparation, inspection, identification,

indexing, review,storage,retrieval, maintenance, safekeeping, retention, anddisposition ofqualityassurance recordsareinaccordance withapplicable recordsprocedures, codes,standards, andprocurement documents.

Requirements forrecordsstoragefacilities aredefinedintheNuclearPolicyManual.Therequirements andresponsibilities forrecordaccessibility andtransmittal aredescribed intheNuclearPolicyManual.Removalofrecordsfromstorageisdocumented andaccountability ismaintained bytheresponsible recordcontrolorganization.

RG&EQAPSO,Revision21-38-December21,1994 17.3ASSESSMENT 17.3.1Methodology Acomprehensive programofplannedandperiodicselfandindependent assessments isestablished tokeepmanagement apprisedoftheoverallperformance ofGinnaStation.Managersandsupervisors assesstheactivities andresultswithintheirorganizations'reas ofresponsibility toassurethattheymeetqualityrequirements andperformance standards.

Throughobservation androutinemonitoring, theydetectadverseoperational events,declining performance trends,andprecursors ofpotential problems.

Theytakeactiontocorrecttheseproblemsaswellasthoseidentified byexternalsources.Independent assessment oftheeffectiveness ofqualityprogramimplementation andoverallGinnaStationperformance istheprimaryroleoftheQAorganization.

Independent assessments areconducted throughinternalauditsandQAsurveillances onbehalfoftheNSARBanditsQA/QCsubcommittee; theVicePresident, NuclearOperations; andasrequested bylinemanagement.

Thisisaccomplished bymonitoring performance, reporting findingstolinemanagement inatimelymanner,andverifying satisfactory resolution ofproblems.

Operational Assessment evaluates anomalous performance andpotential problemprecursors fromexternalsources.TheNSARBconductsindependent assessment throughperiodicreviewofplantactivities andbydirecting biennialauditsandevaluating theirresults.Theresponsibilities oftheNSARBarediscussed insections17.1.2and17.1.3.Independent assessment activities areperformed inaccordance withinstructions andprocedures byorganizations independent oftheareasbeingassessed.

Organizations performing independent assessment aretechnically andperformance

oriented, withtheirprimaryfocusonthequalityoftheendproductandsecondary focusonprocesses.

17.3.2Assessment Self-assessment Self-assessment isestablished intheNuclearPolicyManualastheresponsibility ofallorganizations withinvolvement intheoperation andsupportofGinnaStation.Individuals andworkgroupsareaccountable forachieving acceptable qualitybyadheringtoprocedures andverifying thattheirworkmeetsqualityrequirements andperformance standards.

RGEEQAPSO,Revision21-39-December21,1994 IndeendentAssessment Aprogramofplannedandperiodicindependent assessments isestablished andimplemented toconfirmthatactivities affecting qualitycomplywiththeQualityAssurance Programandthattheprogramhasbeenimplemented effectively.

Assessments providecomprehensive independent evaluation ofactivities, results,andprocedures.

Theindependent assessment programincludesinternalaudits,externalaudits,andQAsurveillances.

Theseassessments arebothperformance-based andcompliance-based, withthefocusonactivities andfunctions whichoftencutacrossorganizational lines.Strengths andweaknesses ofanorganization's performance aredetermined intheseassessments, allowingQAtoidentifyareasofweaknesses formorefrequentscrutiny.

Inareasofstrength, assessment effortscanbereduced,freeingresources forexamination ofactivities thatcouldbenefitmostfromindependent assessment.

Internalauditsofselectedaspectsofqualityaffecting activities areperformed atafrequency commensurate withsafetysignificance andmanagement concerns.

Theauditsareregularly scheduled onaformal,preplanned auditscheduleinamannerwhichassuresthatauditsofsafetyrelatedactivities arecompleted onceeverytwenty-four (24)months.Theauditscheduleisdynamic,reviewedandrevisedperiodically toassureappropriate coverageofcurrentandplannedactivities.

Table17.3.2-1isalistofaudits.Supplementing thislistareauditsoftheNuclearEmergency ResponsePlantosatisfytherequirements of10CFR50.54 (t),andStationSecurityPlantosatisfytherequirements of10CFR50.54 (p)(3),73.56(g)(1)and(g)(2)and10CFR73.55 (g)(4).Auditfrequency andfurtherdiscussion oftheseauditsaredescribed intheirrespective plans.QAsurveillances augmentscheduled auditsand,bytheirnature,requirelessplanningandaremoreresponsive tomanagement requests.

Theyarealsobettersuitedtoeventdrivenactivities, suchasdrills,corrective maintenance, andsurveillance tests.Additional auditsandQAsurveillances areconducted asnecessitated bysituations orevaluations including:

~specialconditions whichprecludedeferral~management concernsresulting frompreviousassessment resultsandcorrective actionRG&EQAPSO,Revision21-40-December21,1994

~information fromexternalsources(e.g.,genericexperience ofthenuclearindustry, ASME,peerorganizations, andregulatory bodies).Eachauditrequiresthedevelopment ofanauditplantoprovideinformation abouttheaudit,suchascharacteristics andactivities tobeassessed, acceptance

criteria, namesofthosewhowillperformtheaudit,scheduling arrangements, andthemethodofreporting findingsandrecommendations.

Auditplanningandperformance utilizeperformance-based techniques thatfacilitate achievement ofassessment objectives.

AuditandQAsurveillance assessments areperformed inaccordance withwrittenprocedures orchecklists bypersonnel whodonothavedirectresponsibility intheareasbeingassessed.

Independent assessments maybeconducted byQualityAssurance engineers orotherqualified personnel, suchastechnical specialists fromothercompanydepartments, outsideconsultants, andindividuals fromotherutilities.

Assessment resultsaredocumented andreportedtotheassessor's management, thesupervisor anddivisionheadhavingresponsibility intheareaassessed, and,foraudits,totheNuclearSafetyAuditandReviewBoard.Withinaspecified timeperiod,thepersonhavingsupervisory responsibility intheareaassessedisrequiredtoreviewtheresults,takenecessary actiontocorrectthedeficiencies identified bythereport,anddocumentandreportthecorrective action.Externalauditsofmajorcontractors, subcontractors, andsuppliers areconducted duringtheearlystagesofdesignandprocurement toevaluatetheirqualityassurance programforcompliance withallprocurement documentrequirements.

Auditsareconducted, asnecessary, toassurethatmajorcontractors, subcontractors, andsuppliers areauditingtheirsuppliers'uality assurance programsinaccordance withprocurement documents.

Duringtheprojectorprocurement process,additional auditsareperformed, asrequired, toassureallqualityassurance programrequirements areproperlyimplemented inaccordance withprocurement documents.

NuclearAssessment performsregularanalysesofassessment resultstoevaluatequalityandperformance trends.Resultsof"theseanalyses, including strengths andweaknesses, areprovidedtomanagement fortheirregularreview.Management concernsduetoassessment resultsmaynecessitate afollow-up assessment, eitherbyauditorbyQAsurveillance.

TheNuclearPolicyManualprovidesguidelines forconducting unscheduled auditsincluding theneedforreaudits.

RG&EQAPSO,Revision21December21,1994 0erational Assessment TheOperational Assessment sectionreceivesandevaluates information fromotherutilities, vendors,INPO,andNRC.Theyensurethatrelevantandtimelyrecommended actionsareprovidedtomanagement thatwilleliminate precursors ofsimilarproblemsatGinna.Thisisaccomplished through:coordinating feedbackprogramtomeasureandimprovetheinternalization oflessonslearnedfromOperating Experience reviewing INPOSOERsandSERsreviewing vendor10CFRPart21reportofdefectsreviewing NRCinformation notices.RG&EQAPSO,Revision21December21,1994

Table17.3.2-1AuditListAuditToicAreas(24months)a.Theconformance offacilityoperation toallprovisions contained withintheTechnical Specifications andapplicable licenseconditions.

b.Performance,

training, andqualifications oftheoperating andtechnical staff.c.Theresultsofallactionstakentocorrectdeficiencies occurring infacilityequipment, structures, systems,ormethodsofoperation thataffectnuclearsafety.Theperformance ofallactivities requiredbytheQualityAssurance Programtomeetthecriteriaof10CFRSO,AppendixB.FacilityFireProtection Programandimplementing procedures.

Inspection andauditofthefireprotection andlossprevention programperformed bynon-licensee personnel.

personnel mayberepresentatives ofANI,aninsurance brokerage firm,orotherqualifiedindividuals.

Theg~Theradiological environmental monitoring programandtheresultsthereof.h.TheOffsiteDoseCalculation Manualandimplementing procedures.

i.TheProcessControlProgramandimplementing procedures.