Similar Documents at Ginna |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17250B3061999-10-20020 October 1999 Proposed Tech Specs,Consisting of 1999 Changes to TS Bases ML17265A6941999-06-28028 June 1999 Proposed Tech Specs,Revising ITS Associated with RCS Leakage Detection Instrumentation,As Result of Commitment Submitted as Part of Staff Review of Application of leak-before-break Status to Protions of RHR Piping ML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5911999-03-0101 March 1999 Proposed Tech Specs Change Revising Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6) ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML17265A4661998-11-24024 November 1998 Proposed Tech Specs 4.2.1,revising Description of Fuel Cladding Matl & Updating List of References Provided in TS 5.6.5 for COLR ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A3151998-06-0404 June 1998 Proposed Tech Specs Basis Re Main Steam Isolation Setpoint ML17265A2941998-05-21021 May 1998 Tech Specs Consisting of Submittal Changes for 1998 ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A2461998-04-27027 April 1998 Proposed Tech Specs Revising Requirements Associated W/Sfp to Reflect Planned Mod to Storage Racks & Temporarily Addressing Boraflex Degradation within Pool ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17264B0671997-10-0808 October 1997 Proposed Tech Specs,Correcting & Clarifying Info Re RCS Pressure & Temp Limits Rept Administrative Controls Requirements ML17264B0441997-09-29029 September 1997 Proposed Tech Specs Revising Adminstrative Controls W/ Respect to Reactor Coolant Sys Pressure & Temp Limits Rept ML17264B0391997-09-29029 September 1997 Proposed Tech Specs Revising Allowable Value & Trip Setpoint for High Steam Flow Input Into LCO Table 3.3.2-1,Function 4d (Main Steam Isolation) to Address Issues Identified in Rev Revised Setpoint Analysis Study ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264B0031997-08-19019 August 1997 Proposed Tech Specs Allowing Testing of Three ECCS motor- Operated Valves in Mode 4 Which Currently Requires Entry Into LCO 3.0.3 ML17264A9991997-08-19019 August 1997 Proposed Tech Specs Correcting Specified Accumulator Borated Water Volume Values in SR 3.5.1.2 to Match Associated Accumulator Percent Level Values ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17264A9241997-06-0303 June 1997 Proposed Tech Specs Clarifying Issues Re Low Temperature Overpressure Protection ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML17264A8671997-04-24024 April 1997 Proposed Tech Specs,Revising Rcs,Pt & Administrative Control Requirements 1999-06-28
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17265A6401999-05-12012 May 1999 Rev 11 to Technical Requirements Manual for Ginna Station. ML17265A6261999-04-18018 April 1999 Rev 10 to Technical Requirements Manual (Trm), for Ginna Station ML17309A6521999-04-14014 April 1999 Rev 14 to AP-RCS.1, Reactor Coolant Leak. ML17311A0701999-04-14014 April 1999 Rev 10 to AP-PRZR.1, Abnormal Pressurizer Pressure. ML17309A6531999-04-13013 April 1999 Rev 1 to FIG-2.0, Figure Sdm. with 990413 Ltr ML17265A6111999-03-26026 March 1999 Rev 9 to Technical Requirements Manual for Ginna Station. ML17265A5571999-02-25025 February 1999 Rev 4 to Technical Requirements Manual (Trm). ML17265A5481999-02-12012 February 1999 to EOP ATT-22.0, Attachment Restoring Feed Flow. ML17265A5491999-02-12012 February 1999 to EOP FR-H.5, Response to SG Low Level. ML17265A5461999-02-12012 February 1999 0 to EOP AP-TURB.1, Turbine Trip Without Rx Trip Required. ML17309A6481999-01-25025 January 1999 Revised Ginna Station Emergency Operating Procedures. with 990125 Ltr ML17265A5151999-01-14014 January 1999 Revised Emergency Operating Procedures,Including Rev 14 to AP-SW.1,rev 3 to ATT-5.2,rev 5 to ATT-8.0,rev 1 to ATT-14.6, Rev 17 to E-1,rev 16 to ECA-1.1,rev 26 to ES-1.3,rev 4 to FR-Z.2 & Index ML17265A5081999-01-0808 January 1999 Rev 7 to Technical Requirements Manual, for Ginna Station ML17265A4961998-12-18018 December 1998 Rev 6 to Technical Requirements Manual. ML20198C0581998-12-14014 December 1998 Rev 5 to FR-Z.1, Response to High Containment Pressure ML20198C0361998-12-14014 December 1998 Rev 11 to ECA-0.2, Loss of All AC Power Recovery with SI Required ML20198C0521998-12-14014 December 1998 Rev 13 to FR-S.1, Response to Reactor Restart/Atws ML20198C0411998-12-14014 December 1998 Rev 16 to FR-C.1, Response to Inadequate Core Cooling ML20198C0121998-12-14014 December 1998 Rev 10 to AP-RCS.2, Loss of Reactor Coolant Flow ML20155G0301998-10-30030 October 1998 Rev 13 to EOP AP-CCW.1, Leakage Into Component Cooling Loop ML17265A4091998-08-24024 August 1998 Rev 13 to AP-SW.1, Svc Water Leak. W/980824 Ltr ML17265A3721998-07-16016 July 1998 Rev 14 to EOP AP-CW.1, Loss of Circ Water Pump. W/980716 Ltr ML17265A2861998-05-0606 May 1998 Rev 19 to EOP ECA-3.2, SGTR W/Loss of Reactor Coolant Saturated Recovery Desired & Updated ECA Index.W/980506 Ltr ML17265A1821998-02-20020 February 1998 Rev 1 to EWR 5111, MOV Qualification Program Plan, Calculation Assumption Verification Criteria. ML17265A1491997-12-31031 December 1997 Rev 1 to Inservice Testing Program. ML17264B0731997-10-14014 October 1997 Rev 4 to Technical Requirements Manual (TRM) for Ginna Station. ML17265A1541997-09-16016 September 1997 Rev 1 to DA EE-92-089-21, Design Analysis Ginna Station Instrument Loop Performance Evaluation & Setpoint Verification. ML17264A9751997-08-0505 August 1997 Rev 14 to AP-ELEC.1, Loss of 12A & 12B Busses. ML17264A9771997-08-0505 August 1997 Rev 11 to AP-RCP.1, RCP Seal Malfunction. ML17264A9791997-08-0505 August 1997 Rev 7 to AP-RCS.3, High Reactor Coolant Activity. ML17264A9781997-08-0505 August 1997 Rev 12 to AP-RCS.1, Reactor Coolant Leak. ML17264A9851997-08-0404 August 1997 Rev 2 to Summary Description of Compliance w/10CFR73 Amend Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. ML17264A9391997-07-0707 July 1997 Rev 3 to Technical Requirements Manual for Ginna Station, Inserting New Tabs Accordingly Per Previous Transmittal for Rev ML17264A9341997-07-0101 July 1997 to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624 ML17264A9461997-06-20020 June 1997 to Inservice Insp (ISI) Program. ML17311A0471997-05-22022 May 1997 Revised Eops,Including Procedures Index,Rev 5 to ATT-15.0, Rev 3 to ATT-15.2,rev 3 to AP-ELEC.3,rev 13 to ECA-0.1 & Rev 9 to ECA-0.2.W/970522 Ltr ML20140B8291997-03-24024 March 1997 Rev 3 to EOP ATT-12.0, Attachment N2 Porvs ML17264A8221997-02-0606 February 1997 Rev 15 to FR-P.1, Response to Imminent Pressurized Thermal Shock Condition. ML17264A8201997-02-0606 February 1997 Rev 7 to AP-RCC.2, Rcc/Rpi Malfunction. ML17264A8081997-01-23023 January 1997 Revised Emergency Operating Procedures,Including Rev 14 to E-1,Rev 19 to E-3,Rev 14 to ECA-2.1,Rev ECA-3.3,Rev 20 to ES-1.3,Rev 13 to FR-C.1,Rev 12 to FR-C.2 & Rev 14 to FR-P.1 ML20133N3351997-01-10010 January 1997 Rev 7 to FR-C.3, Response to Saturated Core Cooling ML17264A8881996-10-10010 October 1996 Rev 9 to ODCM for Ginna Station. ML20128N0681996-10-0303 October 1996 Revised Emergency Operating Procedures,Including Rev 5 to Att-10.0, Attachment Faulted S/G & Rev 6 to Att-16.0, Attachment Ruptured S/G ML17264A5311996-05-31031 May 1996 Revised Emergency Operating Procedures,Including Rev 10 to AP-RCP.1,Rev 12 to ECA-0.1,Rev 12 to ECA-2.1,Rev 3 to FR-H.2,Rev 3 to FR-H.4,Rev 7 to FR-I.1,Rev 12 to FR-P.1,Rev 10 to FR-S-1 & Rev 6 to FR-S.2 ML17264A5161996-05-22022 May 1996 Rev 2 to Technical Requirements Manual (TRM) ML17264A4581996-04-0808 April 1996 Rev 7 to ODCM for Ginna Station. ML17264A4371996-04-0101 April 1996 Rev 1 to Technical Requirements Manual (TRM) ML17264A4391996-04-0101 April 1996 Rev 1 to Updated Technical Requirements Manual (TRM) ML17264A4191996-02-24024 February 1996 Rev 0 to Technical Requirements Manual (Trm). ML17264A6901996-02-23023 February 1996 Rev 0 to Inservice Testing Program. 1999-05-12
[Table view] |
Text
V
SUBJECT:
Revito"Technical Requirements Manual(TRM).",DISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLTITLE:ORSubmittal:
GeneralDistribution CSIZE:CATEGORY1,REGULAYINFORMATION DISTRIBUTION SYSTEM(RIDS)r.<ACCESSION NBR:9903050332 DOC.DATE:
99/02/25NOTARIZED:.
NODOCKET¹FACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G0500244AUTH..NEGATE AUTHORAFFILIATION
- Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION rzr~y/NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72)
.05000244EINTERNAL:
RECIPIENT IDCODE/NAME PD1-1LAVISSING,G.
NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSBJUNG,1OGC/HDS3COPIESLTTRENCLRECIPIENT IDCODE/NAME PD1-1'DNRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIESLTTRENCLGEXTERNAL:
NOACNRCPDRD0NNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
LTTRENCL13 1S~
DISR061CHESTERGASEc'ELECTRIC CORATIONDOCUMENTCONTROLDocumentTransmittal To:DOCUMENTCONTROLDESKUSNRCATT:ALLENJOHNSONPROJECTDOCTORATE 1-1WASHINGTON DC20555Transmittal:
9902082N055.Date:02/24/1999 Holder:1217LISTEDBELOWARENEWORREVISEDCONTROLLED DOCUMENTS.
REVIEWTHEATTACHEDINSTRUCTION LETTER(IFAPPLICABLE)~
ANDUPDATEYOURCONTROLLED DOCUMENTINACCORDANCE WITHRM-RDM-1.
DocIdTRMDocTitleTECHNICAL REQUIREMENTS MANUALFORGINNASTATIONRevRevDateQty00802/25/1999 19903050332 9'70225PDRADQCK05000244PDRReceiptAcknowledgement andActionTaken:Signature DateReturnto:Rochester Gas&.ElectricCorporation GinnaStation-RecordsManagement 1503LakeRoadOntario,NewYork14519 Rochester GasandElectricCorporation Inter-Office Correspondence February24,1999
Subject:
Technical Requirements Manual(TRM)Revision8TQIDistribution Attachedaretheassociated revisedpagesfortheGinnaStationTechnical Requirements Manual(TRM).ThechangesincludedwithinRevision8aresummarized asfollows:1.NewTRsandsurveillances wereaddedtoprovidetherequirements forspentfuelpoolcoolingduringnormalconditions andduringafullcoreofHoad.Revision8oftheTRMisconsidered effective February25,1999.Instructions forthenecessary changestoyourcontrolled copyoftheITSareasfollows:VolumeSectionRemoveInsertIIIIIImIIIIIIIIIIIIIIIIIIIIITRMTRMTRMTOCTRMChapter3.7TRMChapter3.7TRMChapter3.9TRMChapter3.9TRMChapter3.9TRMChapter3.9TRMChapter3.9CoverPageLEP-iTRM3.9-2TRM3.9-3CoverPageLEP-iiTRM3.7-25TRM3.7-26TRM3.9-2TRM3.9-3TRM3.9-5TRM3,9-6TRM3.9-7PleasecontactTomHarding(extension 3384)ifyouhaeanyquestions.
ThomasL.Harding 0~1 GINNASTATIONTRReision7TECHNICAL FIEQUIMENTSMANUAL{TM}7.Responsible HanagetEffective DateContiolledyNo./~l ListofEffective Pages(TRH)PageRev.TOCPageRev.Section3.3(con'd)PageRev.Section3.7(con'd)PageRev.Section1.0TRM1.0-10Section.2.0='RH2.0-1'6Section3.0TRH3.0;11fSection3.1"-TRN3.3-13TRH3.3-14TRH3.3-15'RN3.3-16Section,TRH:3:4-.'.1~TRH3.4-2TRH3.4-3TRN3.4-4TRN3.4-5.TRN,3.4-6'JRH3.4-7TRH3.4-.8-TRN3.4-93.41-100000TRN3.7-10TRN3.7-11TRH3.7-12TRH3.7-13,TRH3.7-14TRM3.7-15TRH3.7-16TRM3.7-17TRM3.7-18TRN3.7-19TRN3.7-20TRM3.7-21TRN3.7-22TRM3.7-23TRM3.7-2461114161166611TRH3.1-1TRH3..1-2TRM3.1-3"TRH3.1-4TRM3.1-5TRH3.1-6,TRH3.1-7012,051'2TRN3.4-10,--3TRN3.4-1'1.;."--'
3TRH3.4-12-.3TRN'3.4-13" 3TRN3.4-14Section3.5Section3.8TRH3.8-1TRH3.8-2TRH3.8-'3Section3.9036TRN3.2-1Section3.6Section,3.2
'RM3;5-10TRH3.9-1TRM3.9-2TRH3.9-3TRN3.9-4Section3.3TRH3.6-10Section4.0TRH3.3-1TRH3.3-2TRN3.3-3TRH3.3-4TRH3.3-5TRN3.3-6TRN3.3-7TRN3.3-8TRN3.3-9TRM3.3-10TRH3.3-11TRN3.3-12101000~116444Section3.7TRN3.7-1TRH3.7-2TRH3.7-3.TRH3.7-4'TRH3;7-5'RH3.7-6TRH"3.7-7.
TRH3.7-8'.TRH3,7-'9116,41131TRN4.0-1Section5.0TRH5.0-1TRM5.0-2GinnaStationTRHLEP-iRevision7
~~TABLEOFCONTENTS1.0USEANDAPPLICATION
....................
1.0-12.03.03.03.13.1.13.1.2SAFETY,LIMITS(SLs)LIHITINGCONDITION FOROPERATION (LCO)APPLICABILITY SURVEILLANCE REQUIREMENT (SR)APPLICABILITY REACTIVITY CONTROLSYSTEMS.BoronInjection System-MODES 1,2,3,and4....BoronInjection System-MODE 5.2.0-13.0-13.0-13.1-13.1-13.1-63.2POWERDISTRIBUTION LIMITS.....:.........3.2-13.33.3.13.3.23.3.33.3.43.3.53.43.4.13.4.23.4.33.53.6INSTRUMENTATION ControlRoomEmergency AirTreatment System(GREATS)Instrumentation Circulating WaterFloodProtection Instrumentation
.MovableIn-CoreInstrumentation FireDetection Instrumentation
.LowTemperature Overpressure Protection (LTOP)ArmingLogicREACTORCOOLANTSYSTEM(RCS)ReactorVesselHeadVentsRCSChemistry Anticipated Transients WithoutScram(ATWS)Mitigation EMERGENCY CORECOOLINGSYSTEHS(ECCS)CONTAINMENT SYSTEMS3.3-13.3-13~333.3-63~373.3-143.4-13.4-13.4-33.4-83.5-13.6-13.73.7.13.7.23.7.33.7.43.7.53.7.63.83.8.13.8.2PLANTSYSTEMSFireSuppression WaterSources.FireSuppression SprayandSprinkler HalonSystemsFireHoseStations.FireBarrierPenetration Seals.FireYardLoop.ELECTRICAL POWERSYSTEMS.Offsit'ePowerSourcesInstrument BusD.~~t~Systems3.7-13.7-13.7-63.7-113.7-143.7-18307233.8-13.8-13.8-23.93.9.13.9.23.9.3REFUELING OPERATIONS
.FuelStorageinSpentFuelPool(SFP)RegionFuelAssemblyMovementinAuxiliary BuildingRefueling Manipulator CraneInterlocks
.23.9-13.9-13.9-23.9-4GinnaStationTRHRevision
~+lIFuelAssemblyMovementinAuxiliaryBuildingTR3.9.?3.9REFUELING OPERATIONS 3.9.2FuelAssemblyMovementinAuxiliary BuildingTR3.9.2Duringmovementofirradiated fuelassemblies, thefollowing sha'bemet:a.Radiation levelsinthespentfuelpool(SFP)areashallbemonitored c'ohtinuously; b.Aloadinexcessofonefuelassemblyandit.",handlingtoolshallnotbestationed nrtransferred oveithestoragerackscontaining spentfuel;andc.TheSFPtemperature shallbez150'F.-NOTE-Theloadrestriction isnotapplicable formovementofconsolidated fuelrodcanisters ifthespentfuelracksbeneaththetransported canisteronlycontainfuelwhichhasdecayedz60dayssincebeingirradiated.
APPLICABILITY:
Duringmovementofirradiated fuelassemblies intheoperating floorareaoftheAuxiliary Building.
ACTIONSCONDITION REQUIREDACTIONCOMPLETION TIHEA.Radiation levelsnotcontinuously monitored.
A.ISuspendmovementofirradiated fuelassemblies.
Immediately ORLoadrestriction notmet.ORSFPtemperature notwithinlimit.GinnaStationTRHTRH3.9-2Revision0
~~J FuelAssemblyMovementinAuxiliary BuildingTH3.9.?SURVEILLANCE RE(UIPEMENTS SURVEILLANCE FREQUENCY
'lSR3.9.2.1Verifynoloadinexcessofonefuelassemblyanditshandlingtoolisstationed ortransferred overthestorageracks.Oncepriortomovingloadsoverthestoragerac).'ontaining spentiuelTSR3.9.2,2Verifyradiation monitorsinSFPareaareOPERABLE.
24hoursTSR3.9.2.3VerifySFPtemperature iswithinlimit.24hoursGinnaStationTRMTRM3.9~3Revision0