Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML18163A1822018-06-0202 June 2018 Framatome Inc. - Notification of 10 CFR 21 Defect - Failure of Relays to Change State ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML15357A0422015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML16020A4762015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12318A0402012-11-0808 November 2012 Part 21 - Report of Potential Grounding Pathway Between Heat Sink and Chassis of Control Modules ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12123A0892012-04-27027 April 2012 Abb, Inc., Notification of Potential Part 21 Report - Hk Circuit Breaker Studs Failed to Meet Specification ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML12058A1412012-02-23023 February 2012 Part 21 Report - Rosemount Nuclear Instruments, Inc., Pressure Transmitter with Nonzero Based Calibrations ML0914904882009-05-28028 May 2009 Notification of Potential Part 21 Report Re Air Circuit Breaker Deficiency ML0904007482009-02-0505 February 2009 Update to Part 21 Report Notification, Texas Instruments Operational Amplifier, P/N: OPA 2111 ML0830301812008-10-22022 October 2008 Notification of Potential Part 21 on Power Supplies Manufactured with Unauthorized Capacitor Delivered to H. B. Robinson ML0831702922008-10-21021 October 2008 Submittal of 10 CFR Part 21 Reporting Form for Defect and Noncompliance ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0808104312008-03-20020 March 2008 Part 21 Report Involving Potential Failure of Certain Rosemount Pressure Transmitters ML0727504702007-09-21021 September 2007 MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 ML0627702242006-09-27027 September 2006 Part 21 Report from Tyco Valves & Controls LP, Improper Valve Springs in Pressure Relief Valves ML0536403292005-12-28028 December 2005 Notification of Deficiency Report (10 CFR Part 21) for Rosemount Nuclear Instruments Transmitters ML0418201212004-06-26026 June 2004 10 CFR 21 Notice for Load Sensing Frame 2019-08-29
[Table view] |
Text
AREVA 6/2/2018 2:30:20 PM PAGE 3/004 Fax Server framaton11e Notification of 1 O CFR 21 Defect
Subject:
Notificafion of 1 O CFR 21 Defect Name and Address of Individual Informing the Commission:
- Gayle Elliott Title: Deputy Director, Licensing & Regulatory Affairs Framatome Inc. 3315 Old Forest Road Lynchburg, Va. 24501 Failure of Relays to Change State Identification of Basic Activity: Eaton NBF66F Relay Basic Activity Supplied By: Framatome Inc. Nature of Defect: While performing analysis on AC Eaton NBF relays, Framatome discovered that, unless a specific application technique is utilized while applying epoxy to the pin within the crossbar, the potential for the epoxy to become foreign material is introduced. This foreign material could migrate to the area between the moving and stationary magnets, preventing the relay from completing its change of state when called upon. This condition does not occur in the de-energized direction. Framatome has not been notified of any occurrence of this condition. A different epoxy application technique was utilized between 2008 and May of 2013 on relays provided to HB Robinson (the only customer requiring the epoxy application by Framatome). Thus, a potential for this defect is limited to those relays provided during that time period. Defect Determination Date: This issue was determined to be a 10 CFR 21 Defect on May 31, 2018. Number and Location of Basic Components: 307 potentially affected safety related relays with epoxy applied to their relay pins were supplied to the H.B. Robinson nuclear plant.
AREVA 6/2/2018 2:30:20 PM PAGE 4/004 Fax Server Corrective Actions to Date: The application process was reevaluated and revised in 2013. Advice related to the Defect: Framatome is working to provide advice to the customer on the path forward related to this Defect.