MONTHYEARML24004A2092023-12-12012 December 2023 Flowline, Inc. - Interim Part 21 Report Notification Regarding Supply of 1 Sch. 80 (0.179 Wall) SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow; Manufacturer: Flowline; Heat No: 27668; 27 Pieces - Heat Code ML23352A2382023-12-0808 December 2023 56882-EN 56882 - Tioga Pipe, Inc Interim Part 21 Report Re Supply of 1 Inch Sch. 80 SB466 Uns C71500 Buttweld Long Radius 90 Degree Elbow ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML21322A0512021-10-27027 October 2021 Paragon Energy Solutions, LLC, P21-09282021, Rev. 0, Final Notification of a Deviation with Inverter Assembly (Model NLI-072034-CSI-K-5-A) ML21295A2472021-10-18018 October 2021 Engine Systems, Inc., Part 21 Reportable Notification on a Pressure Regulator Valve ML21260A0072021-09-0909 September 2021 Ametek Solidstate Controls, Notification of Potential Defect - 10CFR Part 21 Report Re Omron Timer Relay ML19253A0532019-08-29029 August 2019 Azz Nuclear - Report of Potential 1O CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19120A1062019-04-17017 April 2019 Interim Report of Potential 10 CFR Part 21, Eaton Size 1 and 2 A200 Series Starters/Contactors ML19080A0592019-03-0808 March 2019 Interim Report of Potential 10CFR Part 21, Eaton A200 Series Starters/Contactors ML19053A5002019-02-0101 February 2019 Sor, Inc. Part 21 Notification of Deviation Sor R-Series Housing with Terminal Block ML19024A1642019-01-0707 January 2019 Ametek - Notification of Potential Defect - 10CFR Part 21 Re Solidstate Controls Safety-Related Operational Spare Parts Kits ML18163A1822018-06-0202 June 2018 Framatome Inc. - Notification of 10 CFR 21 Defect - Failure of Relays to Change State ML18102A5292018-04-0303 April 2018 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0121, Rev. 0, Refurbished Pressure Regulator Assembly, P/N 1776 506. ML18087A0032018-03-21021 March 2018 Crane Nuclear, Inc. - Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve (Updated) ML18079A0142018-03-0606 March 2018 Crane Nuclear, Inc., 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl I0x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML18075A3552018-03-0606 March 2018 10 CFR Part 21 Notification of Defect on Crane Nuclear Figure Number 83 1/2 Spl 10x8x10 and 6x4x6 Bolted Bonnet Gate Valve ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17142A3232017-05-11011 May 2017 Interim Report Concerning Supply of Stainless Steel Tubing ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16321A4502016-08-31031 August 2016 Part 21 Notification - Flowserve Swing Check Valves ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16039A2692016-02-0303 February 2016 Nutherm International, Inc. - Potential Issue Regarding Incorrect Industrial Irradiation Dose, Per Cooper, Oconee, Fitzpatrick, Point Beach, Brunswick, and Susquehanna ML15357A0422015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML16020A4762015-12-18018 December 2015 Curtiss-Wright Corp. - Notification of Part 21 Report on Eaton/Cutler Hammer A200 Series Starters (and Contactors), Per North Anna, H.B. Robinson, Diablo Canyon, and Hatch ML15265A4182015-09-21021 September 2015 Sor, Inc. - Part 21 Notification of Deviation - ML15251A212 Irradiation Certification with Insufficient Margin BSEP 15-0054, Part 21 Notification Regarding Allen Bradley Model 700RTC Relays2015-06-25025 June 2015 Part 21 Notification Regarding Allen Bradley Model 700RTC Relays ML15162A0232015-06-0909 June 2015 Part 21 - Incorrect Part Number Relay Shipped to Brunswick Nuclear Plant ML15173A0162015-06-0808 June 2015 Engine Systems, Inc. - 1OCFR21 Reporting of Defects and Non-Compliance - Report No. 10CFR21-0112, Rev. 0, Incorrect Relay Installed in Governor Control Panel, P/N 8002096-PANEL ML15155A5772015-05-28028 May 2015 Part 21 Notification Regarding Allen Bradley 700RTC Relay Configuration ML15103A2442015-04-0606 April 2015 Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14210A0092014-07-21021 July 2014 Part 21 Report - Incorrect Valve Solenoids Provided ML14070A1832014-02-14014 February 2014 Part 21 Report - Failed Pressure Regulator During Post Installation EDG Pressure Testing ML13340A3822013-12-0505 December 2013 Part 21 Reportable Condition Notification: Failure of Relay Logic Card Modules in 2 Out of 4 Voters ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13092A1182013-03-29029 March 2013 Notification of Potential Part 21 Interim Report on the Failure of an Emergency Diesel Generator Excitation System ML13095A0112013-03-25025 March 2013 Update to Event Number 48798: 10 CFR Part 21 Notification, Dual Alarm Modules and Single Alarm Modules ML13079A3202013-03-18018 March 2013 Notification of Potential Part 21 Interim Report Re Possible Deviation or Defect in Nuclear Qualified High Efficiency Particulate Air Filters ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers 2023-05-24
[Table view] |
Text
06/126/2004 U.S. Nuclear Regulatory Commission OperationsCenter Event Report pakre I General Information or Other (PAR) Event# 40843 Rep Org: WHITING CORPORATION Notification Date I Time: 06/26/2004 11:30 (EDT)
Supplier: WHITING CORPORATION Event Date / Time: 06/2612004 (CDT)
Last Modification: 06/26/2004 Region: 3 Docket #:
- City: MONEE -AgreementState: Yes County: License #:
State: IL NRC Notified by: MARK KWASNY Notifications: THOMAS KOZAK R3 HQ Ops Officer: CHAUNCEY GOULD CHARLES R. OGLE R2 Emergency Class: NON EMERGENCY VERN HODGE NRR 10 CFR Section:
21.21 UNSPECIFIED PARAGRAPH PART 21 NOTICE FOR WHITING CRANES Based on a recent Engineering study of Whiting Crane SN 10698 at Robinson Station we have identified an overstress condition on the slack line load sensing structural frame interior plate welds. This condition is limited to the main hoist of a few redundant (single failure proof) cranes having capacities of 125 tons. They have reviewed trolley drawings for all redundant trolleys and have isolated the problem to 3 Whiting cranes SN 10388, 1 0389 (Brunswick Station) & 10698 (Robinson Station). Based on their records no other cranes are affected. These cranes must be limited to operating at 59 tons (47% of rated capacity) until the appropriate repairs are made. If customers have a concern related to cranes at their facility or require additional information they can direct their request to whiting-nuclear~whitingcorp.com or to the Whiting Corporation 10 CFR 21 hot line at 708-587-2550.
Include your name, title, mailing address, e-mail address, phone #, fax #, Whiting Crane serial number, earliest critical lift date, and any specific requests. The company will reply upon completing any necessary research and based on the dates of the earliest critical lift.
From: "Mark Kwasny" <MKWASNYCwhitingcorp.com>
To: <hool@nrc.gov>
Date: 6/26/04 11:30AM
Subject:
10 CFR 21 notice for load sensing frame Based on a recent Engineering study of Whiting Crane SN 10698 at Robinson Station we have identified an overstress condition on the slack line load sensing structural frame interior plate welds. This condition is limited to the main hoist of a few redundant (single failure proof) cranes having capacities of 125 tons. We have reviewed trolley drawings for all redundant trolleys-and we-have-i-solated the'--problemn-t&-3-Whiting'cranhes-SN-10388;' 10389 (Brunswick Station) & 10698 (Robinson Station). Based on our records no other cranes are affected. These cranes must be limited to operating at 59 tons (47%
of rated capacity)until the appropriate repairs are made. If customers have a concern related to cranes at their facility or require additional information they can direct their request to whiting-nuclear~whitingcorp.com or to the Whiting Corporation 10 CFR 21 hot line at 708-587-2550. Please include your name, title, mailing address, e-mail address, phone #, fax #, Whiting Crane serial number, earliest critical lift date, and any specific requests. We will reply upon completing any necessary research and based on the dates of the earliest critical lift. Thank you for your patience, cooperation and understanding.
QA Manager Whiting Corporation 26000 Whiting Way Monee, IL 60449 708-587-2000 FAX - 708-587-2283 e-mail - mkwasnytwhitingcorp.com www.whitingcorp.com ISO 9001& QS 9000 TES 10 CFR 50 Appendix B 10 CFR 21, NQA-1, NOG-1