ML041820121

From kanterella
Jump to navigation Jump to search
10 CFR 21 Notice for Load Sensing Frame
ML041820121
Person / Time
Site: Brunswick, Robinson  Duke Energy icon.png
Issue date: 06/26/2004
From: Kwasny M
Whiting Corp
To:
Office of Nuclear Reactor Regulation
References
40843
Download: ML041820121 (2)


Text

06/126/2004 U.S. Nuclear Regulatory Commission OperationsCenter Event Report pakre I General Information or Other (PAR) Event# 40843 Rep Org: WHITING CORPORATION Notification Date I Time: 06/26/2004 11:30 (EDT)

Supplier: WHITING CORPORATION Event Date / Time: 06/2612004 (CDT)

Last Modification: 06/26/2004 Region: 3 Docket #:

- City: MONEE -AgreementState: Yes County: License #:

State: IL NRC Notified by: MARK KWASNY Notifications: THOMAS KOZAK R3 HQ Ops Officer: CHAUNCEY GOULD CHARLES R. OGLE R2 Emergency Class: NON EMERGENCY VERN HODGE NRR 10 CFR Section:

21.21 UNSPECIFIED PARAGRAPH PART 21 NOTICE FOR WHITING CRANES Based on a recent Engineering study of Whiting Crane SN 10698 at Robinson Station we have identified an overstress condition on the slack line load sensing structural frame interior plate welds. This condition is limited to the main hoist of a few redundant (single failure proof) cranes having capacities of 125 tons. They have reviewed trolley drawings for all redundant trolleys and have isolated the problem to 3 Whiting cranes SN 10388, 1 0389 (Brunswick Station) & 10698 (Robinson Station). Based on their records no other cranes are affected. These cranes must be limited to operating at 59 tons (47% of rated capacity) until the appropriate repairs are made. If customers have a concern related to cranes at their facility or require additional information they can direct their request to whiting-nuclear~whitingcorp.com or to the Whiting Corporation 10 CFR 21 hot line at 708-587-2550.

Include your name, title, mailing address, e-mail address, phone #, fax #, Whiting Crane serial number, earliest critical lift date, and any specific requests. The company will reply upon completing any necessary research and based on the dates of the earliest critical lift.

From: "Mark Kwasny" <MKWASNYCwhitingcorp.com>

To: <hool@nrc.gov>

Date: 6/26/04 11:30AM

Subject:

10 CFR 21 notice for load sensing frame Based on a recent Engineering study of Whiting Crane SN 10698 at Robinson Station we have identified an overstress condition on the slack line load sensing structural frame interior plate welds. This condition is limited to the main hoist of a few redundant (single failure proof) cranes having capacities of 125 tons. We have reviewed trolley drawings for all redundant trolleys-and we-have-i-solated the'--problemn-t&-3-Whiting'cranhes-SN-10388;' 10389 (Brunswick Station) & 10698 (Robinson Station). Based on our records no other cranes are affected. These cranes must be limited to operating at 59 tons (47%

of rated capacity)until the appropriate repairs are made. If customers have a concern related to cranes at their facility or require additional information they can direct their request to whiting-nuclear~whitingcorp.com or to the Whiting Corporation 10 CFR 21 hot line at 708-587-2550. Please include your name, title, mailing address, e-mail address, phone #, fax #, Whiting Crane serial number, earliest critical lift date, and any specific requests. We will reply upon completing any necessary research and based on the dates of the earliest critical lift. Thank you for your patience, cooperation and understanding.

QA Manager Whiting Corporation 26000 Whiting Way Monee, IL 60449 708-587-2000 FAX - 708-587-2283 e-mail - mkwasnytwhitingcorp.com www.whitingcorp.com ISO 9001& QS 9000 TES 10 CFR 50 Appendix B 10 CFR 21, NQA-1, NOG-1