ML20199E240

From kanterella
Revision as of 21:51, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Population Description, Piping Sys Bolted Joints/Matls
ML20199E240
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/26/1985
From: Patterson A, Schauf J
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To:
Shared Package
ML20199D912 List: ... further results
References
FOIA-86-36 NUDOCS 8606230239
Download: ML20199E240 (3)


Text

. -

c w

. r. ..: . . . .. - - . . . . . . . . ... . . - -- . . . . .-- . . . .

.e G_ c . -

COMANCHE PEAK REVIEW TEAM POPULATION DESCRIPTION

  • Page 1 of 1 l l

POPULATION NAME: Piping System Bolted Joints / Materials PREPARED BY:

[4 b A DATE: June 20, 1985 PGNSI p QA/QC SUPPORT ENGINEER SYSTEM, COMPONENTS, AND STRUCTURES:

The population shall include:

For safety related systems identified on Attachment A:

All safety related bolted joints in piping systems (large and small bore pipe, and instrument pipe / tube)

Flanges, bolts / studs, nuts, and gaskets (dielectric) associated with safety related bolted joints POPULATION BOUNDARY:

The population boundary shall include:

All bolted joints as shown on all Brown & Root Inc. piping / tubing isometrics and locally mounted instrument bcited joints for safety related piping / tubing systems whose installation is complete and QC accepted Bolted joints for CPSES Units 1, 2 and common to both units SPECIFIC INTERFACES:

The population shall not include:

Pipe support bolted connections. These are included in the "Large Bore Pipe Supports" (Rigid and Non-Rigid),"Small Bore Pipe Supports", and " Instrument Pipe / Tube Support" Populations.

Pipe flange and flange veld material traceability. These are included in the "Large Bore - Welds / Material" and "Small Bore Pipe and Instrument Pipe / Tube Welds / Material" populations.

Bolted joint location. This is included in the "Large and Small Bore Piping Configuration" populations 8606230239 860609

^ PDR FOIA i GARDE 86-36 PDR APPROVED BY: ,

DATE: (o- f/- W LEAD DISCIPLINE ENGI ER QA/

' APPROVED BY: /I/M /.N1 efed.% DATE: [ "Z6 "T[

QA/QC REINSPECTION ENGINEERTNG . ,

SUPERVISOR s

=

, - . _ ~ - . - _ _ . - - - - - - - - - - - - - - - - - - , - - - - - - - , - - -

t.

. L L..

.'* ~

Fase 1 of 2 ATTACHMENT A SAFETY RELATED PIPING SYSTEMS ISCHETRIC - #

SYSTEM

. DESIGNATION STSTEM DESCRIPTION AF Auxiliary Feedveter BR .

Baron Recycle

  • CA Compressed Air CC Component Cooling Water CH Chilled Water CS Chemical and Volume Control CT Containment Spray DD Domin and Reactor M/U Wtr.

DO Diesel Gen. Fuel Oil

.;

MS Main Steam PS Process Sampling RC Reactor Coolant RH Residual Heat Removal RN Radiation Monitoring SF Spent Fuel Pool Cooling and Cleanup ,

l SI Safety Injection 1

SW Station Service Water VA Beating and Ventilation System

[

,. . , .1.;. j M.r. o j ,

~

0006-s(0)06/25/85

],J '{

.. f ' -. - j'shg"44.[, ,

d n  ;.

I i . '-

,, Page 2 of 2 f

ISOMETRIC SYSTEM DESIGNATION SYSTEM DESCRIPTION I

VD Vents and Drains

. WP Waste Processing, Liquid

  • CI Compressed Air Inst.
  • LT Leak Test

t These systems, although not specifically identified in the CPSES PSAR as safety related, are included because they are a part of Containment Isolation System as identified in the CPSES PSAR. #

s

3 a g t 0004-S(0)06/22/85