|
---|
Category:NRC TECHNICAL REPORT
MONTHYEARML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20029A7771991-02-28028 February 1991 Final Rept Addressing Scaling for Comanche Peak Steam Electric Station Unit 1 ML20246D9051989-08-31031 August 1989 Staff Evaluation of Dispute Between Case & TU Electric on Acceptability of Jul 1982 RCS Cold Hydrostatic Test ML20238A7261987-09-0303 September 1987 Partially Withheld Rept of Interview W/W Clements Re Internal Investigation Into Allegation of Intimidation of QA Audit Group ML20238A9231987-03-0606 March 1987 Rept Review Group Task 1 Review Group Rept ML20238A7821987-03-0303 March 1987 Rept by 766 Task Group to Comanche Peak Rept Review Group ML20237K8131987-02-28028 February 1987 Draft Rev 0 to Comanche Peak Rept Review Group Task Group 3 Rept of Safety Significance ML20238A8831987-02-27027 February 1987 Rev 1 to Comanche Peak Rept Review Group Task 2 Rept for 870120-0227 ML20238A7191987-02-26026 February 1987 Draft Rev 1 to Comanche Peak Rept Review Group Task Group 3 Rept of Safety Significance ML20238A6671987-02-18018 February 1987 Draft Rev 0 to Comanche Peak Rept Review Group - Task Group 3 Rept ML20238B4951987-02-17017 February 1987 Draft Rept by 766 Task Group to Comanche Peak Rept Review Group ML20238B3521987-02-13013 February 1987 Draft Comanche Peak Rept Review Group Task 1 Rept ML20238A6091987-02-11011 February 1987 Draft Rev 0 to Comanche Peak Rept Review Group Task 2 Rept for 870120-0210 ML20215C8221986-12-11011 December 1986 Partially Withheld Rept of Investigation Re Allegations of Misconduct by Region IV Mgt W/Respect to Plant ML20207A9801986-10-30030 October 1986 Evaluation Supporting Util 840925 Submittal Re Lesser Separation Between Class 1E & Certain non-Class 1E Circuits. Analysis Provided Justifies Lesser Separation Between Circuits ML20211M2371986-02-13013 February 1986 Morning Rept:On 860212,bomb Threat Received at Util.Nuclear Engineering Bldg Evacuated.Personnel Returned to Work Following Site Security Search.Corporate Security Investigating Matter IA-86-208, Morning Rept:On 860212,bomb Threat Received at Util.Nuclear Engineering Bldg Evacuated.Personnel Returned to Work Following Site Security Search.Corporate Security Investigating Matter1986-02-13013 February 1986 Morning Rept:On 860212,bomb Threat Received at Util.Nuclear Engineering Bldg Evacuated.Personnel Returned to Work Following Site Security Search.Corporate Security Investigating Matter ML20210K9741986-01-24024 January 1986 Status Briefing Re Comanche Peak Technical Review Team Program Plan,Fsar Review & Allegations to Enable Completion of All Sser Sections ML20134A7571985-10-31031 October 1985 Rept of Review & Evaluation of Allegations of Intimidation & Harassment of Employees at Comanche Peak Steam Electric Station,Units 1 & 2 ML20215F0901985-10-29029 October 1985 Rept of 851029 Reinterview W/J Marshall Re Involvement W/Mgt Analysis Co Rept ML20133C7271985-09-30030 September 1985 Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan:Detailed Comments/Concerns ML20199E6571985-09-27027 September 1985 Population Items List, Fuel Pool Liner ML20199E3031985-09-26026 September 1985 Rev 1 to Population Description, Large Bore Pipe Welds/ Matl ML20199G7091985-09-25025 September 1985 Population Items List, Large Bore Pipe Welds/Matl. Related Info Encl ML20199E6401985-09-13013 September 1985 Population Items List, Small Bore Piping & Instrument Tubing/Piping Welds/Matl ML20199E6321985-09-0606 September 1985 Population Items List, Concrete Placement ML20199E6441985-09-0505 September 1985 Rev 0 to Population Items List, Mechanical Equipment Installation. Related Info Encl ML20199E6261985-08-21021 August 1985 Rev 0 to Population Items List, Piping Sys Bolted Joints/ Matl. Related Info Encl ML20199E5861985-08-17017 August 1985 Rev 2 to Population Description, Field Fabricated Tanks ML20199E5731985-08-14014 August 1985 Population Items List, Liners ML20199E6811985-08-14014 August 1985 Rev 0 to Population Items List, Small Bore Piping Configuration ML20199E5601985-08-0909 August 1985 Rev 0 to Population Description, Mechanism Equipment Installation. Related Info Encl ML20136G4131985-08-0909 August 1985 Rev 2 to Staff Evaluation of Comanche Peak Response Team Program Plan ML20199E2951985-08-0808 August 1985 Population Description, Liners ML20199E5541985-08-0505 August 1985 Population Description, Concrete Placement ML20215F0991985-08-0505 August 1985 Rept of 850802 Interview W/D Anderson in Dallas,Tx Re Knowledge of 1978 Mgt Analysis Co Rept ML20215F1711985-08-0505 August 1985 Rept of 850730 Interview W/R Tolson in Dallas,Tx Re Withholding of 1978 Mgt Analysis Co Rept ML20215F0051985-08-0505 August 1985 Rept of 850802 Interview W/Tw Rose in Dallas,Tx Re Involvement W/Mgt Analysis Co Rept ML20215F1051985-08-0505 August 1985 Rept of 850802 Interview W/R Spangler in Dallas,Tx Re Knowledge of Mgt Analysis Co Rept ML20215F0541985-08-0505 August 1985 Rept of 850802 Interview W/Ss Palmer in Dallas,Tx Re Knowledge of 1978 Mgt Analysis Co Rept ML20210D4591985-07-31031 July 1985 NRC Plan for Review & Audit of Applicants Program for Assuring Design & Const Adequacy of Comanche Peak Steam Electric Station ML20199E5291985-07-30030 July 1985 Rev 1 to Population Items List, Large Bore Pipe Supports - Rigid. Related Info Encl ML20199E6141985-07-29029 July 1985 Rev 0 to Population Items List, Field Fabricated Tanks. Related Info Encl ML20199E6511985-07-23023 July 1985 Rev 1 to Population Description, Large Bore Pipe Supports - Nonrigid. Related Info Encl ML20199E5381985-07-23023 July 1985 Rev 1 to Population Description, Large Bore Pipe Supports - Rigid ML20199E6691985-07-22022 July 1985 Population Description, Fuel Pool Liners. Related Info Encl ML20199E2321985-06-26026 June 1985 Rev 0 to Population Description, Small Bore Piping & Instrument Tubing/Piping Welds/Matl ML20199E2401985-06-26026 June 1985 Population Description, Piping Sys Bolted Joints/Matls ML20199E2681985-06-26026 June 1985 Rev 0 to Population Description, Large Bore Pipe-Welds/ Matl ML20199E2821985-06-26026 June 1985 Rev 0 to Population Description, Large Bore Piping Configuration 1993-08-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr 05000445/LER-1999-004-01, :on 990830,some Grated Surfaces Were Noted Outside Design Basis.Caused by Use of Friction Type Grating Fasteners.Mods to Enhance Platforms Are Being Implemented. with1999-10-0606 October 1999
- on 990830,some Grated Surfaces Were Noted Outside Design Basis.Caused by Use of Friction Type Grating Fasteners.Mods to Enhance Platforms Are Being Implemented. with
ML20212L1561999-09-30030 September 1999 Safety Evaluation Supporting Amends 72 & 72 to Licenses NPF-87 & NPF-89,respectively ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 05000445/LER-1999-005, :on 990830,potential Common Cause Failure Identified in Jrak Relief Valves.Caused by Pressure Surges Sys.Pressure Surges Sys Have Been Implemented.With1999-09-29029 September 1999
- on 990830,potential Common Cause Failure Identified in Jrak Relief Valves.Caused by Pressure Surges Sys.Pressure Surges Sys Have Been Implemented.With
ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20212G8171999-09-22022 September 1999 Safety Evaluation Supporting Amends 71 & 71 to Licenses NPF-87 & NPF-89,respectively ML20212G8431999-09-22022 September 1999 Safety Evaluation Supporting Amends 70 & 70 to Licenses NPF-87 & NPF-89,respectively ML20216F9381999-09-21021 September 1999 Safety Evaluation Supporting Amends 69 & 69 to Licenses NPF-87 & NPF-89,respectively ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr ML20211K0321999-08-31031 August 1999 Safety Evaluation Supporting Amends 68 & 68 to Licenses NPF-87 & NPF-89,respectively ML20211J9521999-08-30030 August 1999 Safety Evaluation Supporting Amends 67 & 67 to Licenses NPF-87 & NPF-89,respectively ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210N1701999-08-0303 August 1999 Safety Evaluation Supporting Amends 66 & 66 to Licenses NPF-87 & NPF-89,respectively ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20196J0741999-06-28028 June 1999 Safety Evaluation Supporting Amends 65 & 65 to Licenses NPF-87 & NPF-89,respectively 05000446/LER-1999-004, :on 990522,train a EDG Start,Occurred.Caused by Lockout Relay Actuation.Developed Troubleshooting Plan to Help Identify Cause of Problem.With1999-06-18018 June 1999
- on 990522,train a EDG Start,Occurred.Caused by Lockout Relay Actuation.Developed Troubleshooting Plan to Help Identify Cause of Problem.With
05000445/LER-1999-003-01, :on 990519,discovered Battery Surveillances Were Not Performed with Proper Periodicity as Required by Ts.Caused by Misinterpretation of Sr.Resistance Readings Taken,Noed Requested & LAR Requested.With1999-06-10010 June 1999
- on 990519,discovered Battery Surveillances Were Not Performed with Proper Periodicity as Required by Ts.Caused by Misinterpretation of Sr.Resistance Readings Taken,Noed Requested & LAR Requested.With
05000445/LER-1999-002-01, :on 990518,missed TS Surveillance for SG Gross Activity Composite Sampling Was Noted.Caused by Cognizant Personnel Being Distracted from Normal Duties.Sg Sample Was Taken IAW TS Appropriate TS Requirement.With1999-06-10010 June 1999
- on 990518,missed TS Surveillance for SG Gross Activity Composite Sampling Was Noted.Caused by Cognizant Personnel Being Distracted from Normal Duties.Sg Sample Was Taken IAW TS Appropriate TS Requirement.With
05000445/LER-1999-001-01, :on 990510,discovered That Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures.Caused by Less than Adequate Procedures.Revised Circuit Testing Procedures1999-06-0808 June 1999
- on 990510,discovered That Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures.Caused by Less than Adequate Procedures.Revised Circuit Testing Procedures
ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station 05000446/LER-1999-003, :on 990421,discovered That CR HVAC Train a Was Outside TS AOT Limits Due to Blown Fuse.Caused by Incorrect Landing of Wires That Provide Relay Control Power for CR Ventilation Circuitry.Fuse Was Replaced.With1999-05-20020 May 1999
- on 990421,discovered That CR HVAC Train a Was Outside TS AOT Limits Due to Blown Fuse.Caused by Incorrect Landing of Wires That Provide Relay Control Power for CR Ventilation Circuitry.Fuse Was Replaced.With
ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected 05000445/LER-1998-007, :on 981112,RHR Sys Loop Suction Valves Were Not Disabled by Removing Thermal Overload Relays from Respective Breakers.Caused by Failure to Follow Procedures.Removed Thermal Overload Relays.With1999-04-0707 April 1999
- on 981112,RHR Sys Loop Suction Valves Were Not Disabled by Removing Thermal Overload Relays from Respective Breakers.Caused by Failure to Follow Procedures.Removed Thermal Overload Relays.With
ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20207M3611999-03-0808 March 1999 Safety Evaluation of TR ER-80P, Improving Thermal Power Accuracy & Plant Safety While Increasing Operating Power Level Using LEFM Sys. Rept Acceptable.Staff Finds FW Flow Measurement Using LEFM Can Provide Thermal Power ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 05000446/LER-1999-002, :on 990103,main Turbine Generator Control Valves Suddenly & Unexpectedly Closed While at 100 Percent Rated Power.Cause of Event Could Not Be Determined.Ehc Sys Has Been Connected to Minidas.With1999-01-20020 January 1999
- on 990103,main Turbine Generator Control Valves Suddenly & Unexpectedly Closed While at 100 Percent Rated Power.Cause of Event Could Not Be Determined.Ehc Sys Has Been Connected to Minidas.With
05000446/LER-1999-001, :on 981226,identified That TS Surveillance for Containment Integrity Verification Was Not Performed.Caused by Personnel Error.Required Surveillance Was Performed & Applicable Procedures Were Revised.With1999-01-19019 January 1999
- on 981226,identified That TS Surveillance for Containment Integrity Verification Was Not Performed.Caused by Personnel Error.Required Surveillance Was Performed & Applicable Procedures Were Revised.With
ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 1999-09-30
[Table view] |
Text
-
- a. -.
. ~
a u.--
.u.a.= :
a-. : =. a -
.w-
.a COMANCHE PEAK' REVIEW TEAM POPULATION DESCRIPTION j
6 Page 1 of 2 l
f POPULATION NAME: Largg Bore Pipe Supports-Rigid PREPARED BY:
d hm u.
l RESPONSIBLE QA/QC SUPPORT EdGINEER DATE: July 23, 1985 l
REV: 1 l
SYSTEM, COMPONENTS, AND STRUCTURES:
Supports for piping systems designated in Section 17A of the FSAR that i
are safety related and are Safety' Class 1, 2 and 3 and Seismic Category I. (see attachment)
POPULATION BOUhDARY:
Supports it-large bore piping (2 -inch nominal pipe and larger) meeting the criteria for Safety Class 1, 2, and 3 and Seismic Category I.
Support components as shown on pipe support drawings.
(e.g. structural steel, NF velds, std. mfg. components, plate, bolting material, anchor bolts and nuts HILTI type and Richmond Studs, etc.)
Supports that are construction complete and final QC accepted up to and including June 17, 1985.
Supports located in Units 1, 2 and common areas.
All supports which are safety related and are Safety Class 1, 2 and 3 and Seismic Category 1.
Only supports which utilize anchors, guides, rigid restraints, and three dimensional restraints.
ITEMS NOT INCLUDED IN THE POPULATION:
I Large bore pipe supports - non-rigid and pipe whip and moment h'
restraints.
Small bore pipe supports.
I Large bore piping.
I Building structural members.
t 9
0 8606230322 860609 gr PDR FOIA GARDE 86-36 PDR t
Y h
APPROVED BY:
m ev DATE: 7/f4/gf i
QA/tTC LEAD DISCIPLINE ENGINEER APPROVED BY: M M*
b*"
fkl DATE:
p
,QA/QC REINSPECTION ENGINEERING e
h SUPERVISOR
\\
p
__._.....-.m...
m_-_..
_m j
j
~
i COMANCHE PEAK REVIEW TEAM j
POPULATION DESCRIPTION t
fage 2 of 2 i
POPULATION NAME: Large Bore Pipe Supports-Rigid PREPARED BY:
\\ _h'^
- ' A^-
DATE: July 23, 1985 RESPONSIBLE QA/QC SUPPORT ENGINEER REV:
1 I
i SPECIFIC INTERFACES:
Between pipe and pipe support components (Integral attachment members are included in this population).
Welds other than those covered under subsection NF (e.g. integral attachment velds) are included in this population.
Between pipe support components and concrete. (Embedment plates and concrete are included in their respective populations).
1 Between pipe support components and building supplementary steel.
(Building steel is included in the structural steel population).
NOTES:
1.
Where supplementary steel is included as part of pipe support deta: Is, it will be included as an attribute on inspection checklists.
lt i,
i e
1 i
)
}
x CQF-QAI-001 2n
m--
~
..nn.-_..-.
.. _.. _.. =..
n ;,,..
..a.
.<~.,.,.-_n..--n..
n....
- a-I p
ATTACHMFSC (POPULATION DESCRIPTION)
(
.i Safety Applicable Code Seismic l
System and Component 1
Class (1)
Code or Std. (2)
Class Category 1.
Reactor Coolant System RCS) i h
Supports for Class 1 piping 1
ASME III 1
I Supports for Class 2 piping 2
ASME III 2
I l
i 2.
Chemical and Volume control System (CVCS) l l
Supports for Class 2 piping 2
ASME III 2
I j
Supports for Class 3 piping 3
ASME III 3
I I
3.
Boron Thermal Regeneration i :
[
Sub-system (BTRS)
Supports for Class 2 piping 2
ASME III 2
I Supports for Class 3 piping 3
ASME III 3
I i
3 4.
Safety Injection System (SIS)
}'
Supports for Class 2 piping 2
ASME III 2
I Supports for Class 1 piping 1
ASME III 1
I i
j 5.
Residual Heat Removal (RHR)
System i
Supports for Class 1 piping 1
ASME III 1
I l
Supports for Class 2 piping 2
ASME III 2
I
~
l 6.
Boron Recycle System (BRS) i Supports for Class 3 piping 3
ASME III 3
I
(
e ij i
7.
Containment spray System (CSS) 1' Supports for C1 css 2 piping 2
ASME III 2
I p
Supports for Class 3 piping 3
ASME III 3
I 9.
Combustible cas Control System Supports for Class 2 piping 2
ASME III 2
I l
g Supports for Clase 3 piping 3
ASME III 3
I i
l
_ - _ _ =....
-.. _ ~
.. ~.. _.. _
_ _ _ _ _ _ - ~. _ _
f
(;
(
Attachsent (Population Description)
Page 2 Safaty Applicable Code Seisaic System and Component 1 Class (1)
Code or Std. (2)
Class Category i
10.
Component Cooling Water l
System L
Supports for Class 2 piping 2
ASME III 2
I Supports for Class 3 piping 3
ASME III 3
I I
I
- 11. Station Service Water System (SSWS)
Supports for Class 3 piping 3
ASME III 3
I
- 12. Main Steam, Reheat and O
Steam Dump Station j
Supports for Class 2 piping 2
ASME III 2
I l
,o Supports for Class 3 piping 3
ASME III 3
I
- 13. Auxiliary Feedwater System Supports for Class 2 piping 2
ASME III 2
I Supports for Class 3 piping 3
ASME III 3
I l
l 14.
Steam Generator Feedwater j.
l System
[.
Supports for Class 2 piping 2
ASME III 3
I y
- 15. Diesel Generator, Fuel Oil, f
I and Auxiliary Systems Supports for class 3 piping 3
ASME III&AISC 3
I 16.
Spent Puel Pool Cooling and Cleanup System P
Supports for Class 2 piping 2
ASME III 2
I
(;
l Supports for Class 3 piping 3
ASME III 3
I I
- 17. Liquid Weste Processing r.
l' System (LWPS)
[
Supports for Class 3 piping 3
ASME III 3
I
[
i i
+
~
r l
t e
Attachment
(
(Population Description) b
{g P ge 3 Seismic Code Applicable Category Class
. Safety Code or Std. (2)_
l
~
Class (1) 1 f
System and Component Caseous Waste Processing 3
I 18.
ASME III System (GWPS) 3 Supports for Class 3 piping i
I Demineralized and Reactor 2
20.
ASME III I
Make-up Water System 2
3 Supports for Class 2 piping ASME III 5
3 Supports for Class 3 piping 2
. I ASME III I
- 21. Vents and Drains System 2
3 Supports for class 2 piping ASME III t
3 1
Supports for Class 3 piping f.
I 2
ASME III t
- 32. Process Samplina System 2
Supports for Class 2 piping I
2 ASME III Post Accident Sample Section 2
4 32s Supports for Class 2 piping i
I 2
- 40. Plant Gas System ASME III
- a. Nitrogen system 2
Supports for Class 2 piping I
2 ASME III
- b. Hydrogen system 2
Supports for Class 2 piping l
in FSAR, Section 17A System and component numbering system corresponds to that shown NOTE 1.
h i
'I*
6
- - ~ - -
t
/-
Vo-n be
,g g,.
g,,,
~-
c-0 EVALLJATION g
g',,
g,,,,,g ",
TEBEATCH CQWPOWATION h
(
QC-RT-328
~
yA/
h DATE:
August 8, 1985 T0: T. TYLER, H. LEVItt/J. HONEKAMP, M. JONES, R. CAMP, D. SNOL', R. UILLIAMS, C. HAL (NRC)
FROM:
QA/QC Review Team
}
Records Management
- 4 3
t
]
SUBJ:
Document Transmittal 1
1 1
The following documents are attached:
Population Description for:
Concrete Placement Rev 0 August 5, 1985 i
i I
(
i If you have any questions regarding this transmittal, please call extension 331.
s
&ffb/h ?
C. M. Thompson Records Management QA/QC Review Team Attachments I
cc:
ERC File J. Hansel R. Brown T. Lanza g
i J. Christensen J. Schauf A. Lew b
(
V. Hoffman B. Shair A. Tewfik i
D. Alexander A. Burke F. Kovensky s-A. Patterson J. Adam (4) -
K. LeBlanc (U0A) k W. Bailey VII.c. File m
5
- - - - -, _ _ _