MONTHYEARML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 ML24023A0652024-01-23023 January 2024 Inservice Inspection Request for Information IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) ML22229A4862022-08-23023 August 2022 ANO Inspection Plan Letter 2022 Mid Cycle-FINAL ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22075A2052022-03-31031 March 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000313/2022002 and 05000368/20220020 and Request for Information IR 05000313/20223012022-03-30030 March 2022 NRC Initial Operator Licensing Operating Test Approval 05000313/2022301 IR 05000313/20210062022-03-0202 March 2022 Annual Assessment Letter for Arkansas Nuclear One, Units 1 & 2 (Report 05000313/2021006 and 05000368/2021006) ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21232A2232021-09-0101 September 2021 ANO Mid-Cycle Inspection Plan Transmittal Letter 2021 ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21215A2932021-08-0303 August 2021 Inservice Inspection Request for Information ML21109A2432021-04-19019 April 2021 Arkansan Nuclear One, Unit 1 - Notification of Inspection (NRC Inspection Report 05000313/2021003) and Request for Information ML21077A0162021-03-22022 March 2021 Notification of NRC Design Bases Assurance Inspection (Team) (05000313/2021010 and 05000368/2021010) and Initial Request for Information IR 05000313/20200062021-03-0303 March 2021 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2020006 and 05000368/2020006) ML21053A4032021-02-23023 February 2021 Document Request List - ANO IR 2021402 IR 05000313/20200052020-09-0101 September 2020 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Reports 05000313/2020005 and 05000368/2020005) ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 IR 05000313/20190062020-03-0303 March 2020 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2019006 and 05000368/2019006) ML19331A3132019-11-27027 November 2019 ANO Unit 2 Request for Information IR 05000313/20190052019-08-30030 August 2019 Updated Inspection Plan for Arkansas Nuclear One, Unit 1 and 2, Report 05000313/2019005 and 05000368/2019005 ML19080A0372019-03-21021 March 2019 Notification of Inspection (NRC Inspection Report 05000313/2019003 and Request for Information ML18324A8052018-11-19019 November 2018 Notification of an NRC Triennial Fire Protection Baseline Inspection Report 05000313/2019010 and 05000368/2019010) and Request for Information IR 05000313/20180052018-08-31031 August 2018 Updated Inspection Plan for Arkansas Nuclear One (Report 05000313/2018005 and 05000368/2018005) ML18164A3892018-06-14014 June 2018 Arkansas, Notification of NRC Design Bases Assurance Inspection (Teams) (05000313/2018011 and 05000368/2018011), and Initial Request for Information IR 05000313/20170052017-08-28028 August 2017 Arkansas, Units 1 and 2, Update Inspection Plan (Report 05000313/2017005 and 05000368/2017005) IR 05000313/20160062017-03-0101 March 2017 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2016006 and 05000368/2016006) IR 05000313/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2016005 and 05000368/2016005) ML16237A4122016-08-31031 August 2016 Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2016005 and 05000368/2016005) IR 05000313/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Arkansas Nuclear One NRC Physical Security Inspection Report Numbers 05000313/2016401 and 05000368/2016401) ML16223A4622016-08-0909 August 2016 Inspection Planning Considerations for ANO CAL Follow-Up Pkg IR 05000313/20150062016-03-0202 March 2016 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2015006 and 05000368/2015006) IR 05000313/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Arkansas Nuclear One(Nrc Physical Security Inspection Report Numbers 05000313/2015401 and 05000368/2015401) IR 05000313/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2015005 and 05000368/2015005) IR 05000313/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Arkansas Nuclear One (NRC Physical Security Inspection Report Numbers 05000313/2014402 and 05000368/2014402) IR 05000313/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2014006 and 05000368/2014006) IR 05000313/20130012014-03-0404 March 2014 Annual Assessment Letter for Arkansas Nuclear One Units 1 and 2 (Report 05000313/2013001 and 05000368/2013001) IR 05000313/20130062013-09-0303 September 2013 Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313-13-006 and 05000368-13-006) IR 05000313/20128012013-03-0404 March 2013 Annual Assessment Letter for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2012801 and 05000368/2012801) IR 05000313/20120062012-09-0404 September 2012 Mid-Cycle Assessment Letter for Arkansas Nuclear One, Units 1 & 2 (Reports 05000313-12-006 and 05000368-12-006) IR 05000313/20120012012-03-0505 March 2012 Annual Assessment Letter for Arkansas Nuclear One - Units 1 and 2 (Report 05000313/2012001 and 05000368/2012001) ML1124403662011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Arkansas Nuclear One, Units 1 and 2 IR 05000313/20110012011-03-0404 March 2011 Annual Assessment Letter for Arkansas Nuclear One Units 1 & 2 (Report 05000313-11-001 and 05000368-11-001) ML1024305372010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Arkansas Nuclear One IR 05000313/20100012010-03-0303 March 2010 Annual Assessment Letter - Arkansas Nuclear One (Report 05000313-10-001 and 05000368-10-001) 2024-04-08
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23019A0672023-01-19019 January 2023 Inservice Inspection Request for Information ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22213A1662022-08-0101 August 2022 Information Request, Security IR 2022401 ML22208A0542022-07-26026 July 2022 Request for Information ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22159A3242022-06-0909 June 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000313/2022003 and 05000368/2022003) and Request for Information ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22122A2952022-05-0404 May 2022 Notification of Inspection NRC Inspection Report 05000368/2022003 and Request for Information ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21286A7132021-10-15015 October 2021 ANO2022010 Tfp RFI Stg, Arkansas Nuclear One, Units 1 and 2 - Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000313/2022010 and 05000368/2022010) and Request for Information ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21236A3222021-09-19019 September 2021 Request for Information ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21204A0842021-07-28028 July 2021 ANO Phase 4 2021013 RFI Gap ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 0CAN042105, Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description2021-04-30030 April 2021 Supplement to Response to Request for Additional Information Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21026A2682021-01-26026 January 2021 Request for Information ML21022A0842021-01-22022 January 2021 Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping - Arkansas Nuclear One,Units 1 and 2 -Entergy Operations, Inc. NON-PROPRIETARY Redacted ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20324A6412020-11-19019 November 2020 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-034 ML20316A0102020-11-0202 November 2020 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Concerning Relief Request EN-20-RR-01 ML20262H0752020-09-17017 September 2020 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20260H4762020-09-0909 September 2020 NRR E-mail Capture - ANO-1 Final RAI License Amendment Request to Revise Lov Relay Allowable Values ML20154K7622020-06-0101 June 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request Concerning Proposed Technical Specification Additions, Deletions, and Relocations ML20119A0982020-04-28028 April 2020 Notification of Inspection (NRC Inspection Report 05000368/2020003 and Request for Information ML20106E8522020-04-13013 April 2020 Information Request, NRC Inspection Report 05000313/2020410 and 05000368/2020410 ML20065H7992020-03-0606 March 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML20055E9092020-02-24024 February 2020 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Revise Control Element Assembly Drop Time ML20036D3092020-02-0505 February 2020 NRR E-mail Capture - ANO-2 - Final RAI Alternative Request VRR-ANO2-2019-1 ML20013C7472020-01-10010 January 2020 NRR E-mail Capture - ANO-1 and 2 -- Final RAI #2 LAR to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19316A0242019-11-0707 November 2019 NRR E-mail Capture - ANO-1 - - Final RAI Concerning Relief Request ANO1-ISI-033 (L-2019-LLR-0100) ML19280A0402019-10-0707 October 2019 NRR E-mail Capture - ANO-1 and 2 - Final RAI #1 License Amendment Request to Incorporate Tornado Missile Risk Evaluator (TMRE) Into Licensing Basis ML19339F5902019-09-23023 September 2019 Request for Information: Arkansas Nuclear One, IR 05000313/2019-004 Occupational Radiation Safety Inspection ML19281E0032019-08-0505 August 2019 ANO 2019 PIR Request for Information ML19203A0122019-07-16016 July 2019 Request for Information - Inservice Inspection Activities (NRC Inspection Report 05000313/2019004) ML19106A4322019-04-16016 April 2019 NRR E-mail Capture - ANO-2 Final RAI Re LAR to Add TS Actions to Address Inoperability of the Containment Building Sump ML19058A8332019-02-27027 February 2019 NRR E-mail Capture - ANO-1 - Final RAI Relief Request ANO1-ISI-032 2024-05-22
[Table view] |
See also: IR 05000368/2022003
Text
May 4, 2022
Mr. Joseph Sullivan
Site Vice President
Arkansas Nuclear One
Entergy Operations, Inc
N-TSB-58
1448 S.R. 333
Russellville, AR 72802-0967
SUBJECT: ARKANSAS NUCLEAR ONE UNIT 2 - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000368/2022003 AND REQUEST FOR
INFORMATION
Dear Mr. Sullivan:
During the week of June 27, 2022, three inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office will perform the baseline biennial requalification
inspection at Arkansas Nuclear One, Unit 2, using NRC Inspection Procedure 71111.11B,
Licensed Operator Requalification Program.
Experience has shown that this inspection is a resource intensive inspection both for the NRC
inspectors and your staff. In order to minimize the impact to your onsite resources and to
ensure a productive inspection, we have enclosed a request for documents needed for this
inspection. These documents have been divided into three groups:
The first group (Section A of the enclosure) identifies information to be provided prior to
the inspection to ensure that the inspectors are adequately prepared.
The second group (Section B of the enclosure) identifies the information the inspectors
will need upon arrival at the site.
The third group (Section C of this enclosure) identifies the items which are necessary to
close out the inspection and are usually sent a few weeks after the team has left the site.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Richard Kirsey of your training
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact the lead inspector, Nicholas Hernandez at (817) 200-1118
(Nicholas.Hernandez@nrc.gov).
J. Sullivan 2
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice, a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRCs document
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Signed by Gepford, Heather
on 05/04/22
Heather J. Gepford, Chief
Operations Branch
Division of Operating Reactor Safety
Docket No. 05000368
License No. NPF-6
Enclosure:
Biennial Requalification Inspection
Request for Information
Initial Request for Information
Biennial Requalification Inspection
Arkansas Nuclear One, Unit 2
Inspection Report: 5000368/2022003
Inspection Dates: June 27, 2022 - July 1, 2022
Inspection Procedure: IP 71111.11B, Licensed Operator Requalification
Program
Lead Inspector: Nicholas Hernandez, Operations Engineer
A. The following information is requested in order to support inspection preparation
activities. These items are listed by section as they appear in the inspection module
(i.e. 03.04a, 03.04b, etc.). Requested materials should be sent in an electronic format
on CD/DVD in order to arrive at the Region IV office no later than June 6, 2022; OR
uploaded to the NRCs secure Box application no later than June 6, 2022.
CD/DVD to: US Nuclear Regulatory Commission, Region IV
ATTN: Nicholas A. Hernandez/Heather J. Gepford
1600 E. Lamar Blvd
Arlington, TX 76011
General Requests:
List of licensed operators (SRO & RO) by crew (operating & staff).
Training and Operations Department organization charts (with qualified LOR
evaluators identified).
Procedures that identify process for revising and maintaining LO continuing training
program up to date.
List of outstanding LOR program changes.
List of plant events and industry operating experience incorporated into LOR
program since last BRQ.
Audits and/or self-assessment reports addressing the licensed operator
requalification training program.
Last 2 years of simulator review committee (or equivalent) meeting minutes.
Last 2 years of Curriculum Review Committee (or equivalent) meeting minutes.
A summary report of all condition reports related to operator actions/errors in the
control room.
Enclosure
Any revised requalification training that was based on licensed operator performance
issues.
03.04a: Biennial Requalification Written Examinations
The current and approved biennial written examination schedule.
The current requalification cycle written examination results for both SRO & RO that
have already been administered up to the week prior to the inspection team arrival
onsite.
All written examinations that have been approved for administration up to and
including the week before the inspection team is onsite. This will need to have
adequate password protection or double envelope protection if mailed via regular
mail per NUREG-1021.
The current requalification cycle examination methodology (sample plan).
03.04b: Annual Requalification Operating Tests
The schedule for the operating tests (JPMs & scenarios) to be given the week of
June 27, 2022.
The operating tests (JPMs & scenarios) (password protected and provide separately
via telephone at later date) to be given the week of June 27, 2022.
Current requalification cycle operating tests (SRO & RO) and results up to the week
prior to the inspection team arrival onsite.
All 2021 NRC required annual operating tests.
Current requalification cycle operating test methodology (sample plan).
03.04c: Administration of an Annual Requalification Operating Test
All procedures used to administer the annual operating test.
All procedures used to assess operator performance.
All procedures that describe conduct of simulator training.
All procedures used to test, operate, and maintain the simulator.
03.04d: Requalification Examination Security
Submit any tracking tools that you use as a means to prevent excessive overlap on
the written examinations and also meet the intent of sampling all required topics on a
periodic basis.
2
Submit any tracking tools that you use as a means to prevent excessive overlap on
the operating tests and also meet the intent of sampling all required malfunctions
(including major events, instrument/component malfunctions, TS calls, etc.) on a
periodic basis.
All procedures that describe examination security, including procedures used to
develop the examinations that include guidelines on overlap between examinations
in current exam cycle tests and prior year examinations.
List of all condition reports since the last biennial requalification inspection related to
examination security and overlap.
03.04e: Remedial Training and Re-Examinations
List of remedial training conducted or planned since last requalification exam
(includes training provided to operators to enable passing requalification exam and
training provided to correct generic or individual weaknesses observed during
previous requalification exam cycle).
Remediation plans (lesson plans, reference materials, and attendance
documentation).
03.04f: Operator License Conditions
All procedures and program documentation for maintaining active operator licenses,
tracking training attendance, and ensuring medical fitness of licensed operators.
All procedures and associated documentation that supports reactivation of any
SRO/RO license (operating or staff crew) since the last biennial inspection.
03.04g: Control Room Simulator
All simulator management and configuration procedures if not already provided.
Simulator discrepancy report summary list for all open discrepancy reports and
summary list for those items closed between July 11, 2022 and June 27, 2022.
Primary parameters tested in order to verify core physics parameters (such as
moderator temperature coefficient, integral rod worth). The applicable reference
graphs from the plant physics data book (electronic or other means as available)
should also be included as well as the test procedures used and the acceptance
criteria with results.
All simulator modification packages that are on hold, delayed, or not completed in the
last 2 years.
A list of simulator modification packages completed in the last two-year window.
3
B. The following information is requested in order to support the onsite inspection
activities. Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on June 27, 2022.
03.03: Requalification Exam Results / 03.04a and 03.04b: Biennial Requalification Written
Exam and Annual Requalification Operating Tests Quality
All operating tests (JPMs & scenarios) to be given in all subsequent weeks after
onsite week, if available.
All results up to the day the team leaves the site.
03.04f: Conformance with Operator License Conditions
Access to licensed operators records (operating and staff crews).
Access to licensed operators training attendance records.
Access to licensed operators medical records.
03.04g: Control Room Simulator Performance
Simulator discrepancies from July 11, 2020 to June 27, 2022. This should include all
open and closed simulator discrepancy reports, including the
documentation/justification for closure.
Acceptance test documentation, including hardware and software model revisions at
the time of acceptance (as available).
Documentation that validates current models, including the thermal-hydraulics and
neutronics models, to the actual plant.
All current model deficiencies, including FSAR vs Design differences in the simulator
(any documentation on this).
Summary list of modifications from July 11, 2020 to June 27, 2022.
Plant modifications (both hardware and software) completed on the simulator by due
date from July 11, 2020 to June 27, 2022.
Simulator differences Lesson plan used in training (current to June 27, 2022).
The complete book of all simulator annual performance test packages (usually in a
single book but may be electronic or in single test packages), complete with all
transient tests, steady state tests, and malfunction tests. This should also include
the test procedures for each test, the acceptance criteria, and results. For each
transient test, the reference chart should be included or an equivalent subject matter
expert review versus the simulator results with a write-up for any differences beyond
the ANSI standard requirements.
4
All test packages used to verify core physics parameters (such as moderator
temperature coefficient and integral rod worth). The applicable reference graphs
from the plant physics data book (electronic or other means as available) should also
be included as well as the test procedures used and the acceptance criteria with
results.
All simulator tests, configuration management, and related documents available in
the room for inspectors to review. This includes training needs analysis packages,
simulator review committee meeting minutes, etc.
Current copy of ANSI 3.5 standard you are committed to for simulator testing.
C. Arkansas Nuclear One, Unit 2 is required to send the final results summary (see
Table 1 below) and any remaining exams and operating tests that have not been
reviewed to the regional office lead inspector for this inspection for final review and
comparison against the Significance Determination Tools in order to communicate
the exit results for the inspection.
TABLE 1: EXAMINATION RESULTS
1. Total number of licensed operators.
2. Number of licensed operators administered a requalification
examination required by 10 CFR 55.59(a).
3. Number of individual licensed operators who failed any portion of a
requalification examination (written, JPM, or individual simulator
scenario failures).
4. Divide line 3 by line 2 to obtain the individual requalification
examination failure rate. Line 3/Line 2. %
5. Number of crews administered simulator scenarios as part of a
requalification examination required by 10 CFR 55.59(a).
6. Number of crews who performed unsatisfactorily on the
simulator scenarios.
7. Divide line 6 by line 5 to obtain the crew simulator scenario
failure rate. Line 6/Line 5. %
5
ML22122A295
SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: NAH Yes No Publicly Available Sensitive NRC-002
OFFICE OE:DRS/OB BC:DRS/OB
NAME NAHernandez HJGepford
SIGNATURE /RA/ /RA/
DATE 5/3/2022 5/4/2022