NRC Inspection Report 05000285/2012010, Supplemental Response to the Reply to a Notice of Violation (NOV); EA-12-023
ML12340A169
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/03/2012
From: Cortopassi L P
Omaha Public Power District
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-12-023, IR-12-010, LIC-12-0181
Preceding documents:
Download: ML12340A169 (13)


Text


BIIIIB Omaha PulJ/II: PowerDIsItIt:I 444 South 16th Street Mall Omaha, NE 68102-2247 LlC-12-0181 December 03,2012 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 1. Docket Number 50-285 Letter from OPPD (D. J. Bannister) to NRC Document Control Desk (DCD) dated October 27,2011 (LlC-11-0106) . Letter from NRC (A. Vegel) to OPPD (D. J. Bannister) dated March 12, 2012 (NRC-12-0022)(EA-12-023) Letter from OPPD (D. J. Bannister) to NRC Document Control Desk (DC D) dated March 22, 2012 (LlC-12-0030) Letter from NRC (E. E. Collins) to OPPD (D. J. Bannister) dated April 10, 2012 (EA-12-023) Letter from OPPD (D. J. Bannister) to NRC Document Control Desk (DC D) dated May 9,2012 (LlC-12-0068) Letter from OPPD (D. J. Bannister) to NRC Document Control Desk (DCD) dated May 24, 2012 (LlC-12-0051) NRC Inspection Report 05000285/2012010, Supplemental Response to the Reply to a Notice of Violation (NOV); EA-12-023 By letter dated May 24, 2012, Omaha Public Power District, submitted the Fort Calhoun Station required 30-day reply to Notice of Violation; Enforcement Action EA-12-023. Subsequent to that submittal, the investigation revealed additional information necessary for the understanding of the event. This response provides that information in responding to Part C of the violation. The responses to Parts A and B of the violation are unchanged with the exception minor wording changes and the updating of Section 3, Corrective Actions that Will Be Taken, to reflect the current status. Revisions have been indicated with a side bar. Pursuant to 10 CFR 2.201, OPPD acknowledges the violations occurred and a response to . the NOV is provided in the enclosure to this letter. This letter contains regulatory commitments that are summarized on the last page of the ould have any questions, please contact me. Enclosure LPC/rjr enclosure. If you ouis P. CortopassI Site Vice President and CNO