MONTHYEARLIC-24-0017, ISFSI - Phase 1 Final Status Survey Report to Support Approved License Termination Plan, Revision 1; and Technical Support Document for the Ludlum 44-20 Detector Sensitivity2024-11-21021 November 2024 ISFSI - Phase 1 Final Status Survey Report to Support Approved License Termination Plan, Revision 1; and Technical Support Document for the Ludlum 44-20 Detector Sensitivity LIC-24-0015, Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response2024-11-20020 November 2024 Response to Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (DQAP) – Clarification of Request for Additional Information Response LIC-24-0016, Independent Spent Fuel Storage Installation - 2024 Decommissioning Funding Plan Required 72.30(c) Updated Financial Information2024-11-19019 November 2024 Independent Spent Fuel Storage Installation - 2024 Decommissioning Funding Plan Required 72.30(c) Updated Financial Information LIC-24-0013, Independent Spent Fuel Storage Installation - Intent to Submit a Supplement to 2021, and 2024 Nuclear Decommissioning Funding Plan Required 72.30(c) Update2024-10-10010 October 2024 Independent Spent Fuel Storage Installation - Intent to Submit a Supplement to 2021, and 2024 Nuclear Decommissioning Funding Plan Required 72.30(c) Update LIC-24-0014, Independent Spent Fuel Storage Installation - Supplement to 2021, and 2024 Nuclear Decommissioning Funding Plan Required 72.30(c) Update2024-10-10010 October 2024 Independent Spent Fuel Storage Installation - Supplement to 2021, and 2024 Nuclear Decommissioning Funding Plan Required 72.30(c) Update LIC-24-0012, Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information2024-10-0707 October 2024 Independent Spent Fuel Storage Installation - Response to Proposed Revision to Decommissioning Quality Assurance Plan (DQAP) - Request for Additional Information LIC-24-0011, Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-00952024-10-0202 October 2024 Independent Spent Fuel Storage Installation - Response to Application for License Amendment Request to Revise the License Termination Plan - Supplemental Information Needed, EPID L-2024-LLA-0095 LIC-24-0007, License Amendment Request (LAR) to Revise License Termination Plan (LTP)2024-06-18018 June 2024 License Amendment Request (LAR) to Revise License Termination Plan (LTP) LIC-24-0008, Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI2024-05-16016 May 2024 Proposed Revision to the Omaha Public Power District (OPPD) Fort Calhoun Station (FCS) Decommissioning Quality Assurance Plan (Dqap), Unit No. 1 and ISFSI LIC-24-0003, Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report2024-04-25025 April 2024 Independent Spent Fuel Storage Installation - Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-24-0006, (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan2024-04-17017 April 2024 (Fcs), Unit 1, Independent Spent Fuel Storage Installation, Phase 1 Final Status Survey Report to Support Approved License Termination Plan LIC-24-0005, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2024-03-0101 March 2024 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-24-0002, Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report2024-02-27027 February 2024 Independent Spent Fuel Storage Installation - Submittal of Annual Radioactive Effluent Release Report LIC-23-0007, Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information2023-12-0606 December 2023 Response to Fort Calhoun, Unit 1 & Independent Spent Fuel Storage Installation Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements – Request for Additional Information LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 20232023-08-24024 August 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 LIC-23-0004, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2023-04-20020 April 2023 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-23-0003, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2023-03-15015 March 2023 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-23-0001, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information2023-02-27027 February 2023 Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - Request for Additional Information LIC-23-0002, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2023-02-20020 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-22-0010, Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information2022-06-15015 June 2022 Response to Fort Calhoun Station, Unit No. 1 - Review of License Termination Plan Requirements - Request for Additional Information LIC-22-0005, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2022-04-20020 April 2022 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-22-0009, Annual Decommissioning Funding / Irradiated Fuel Management Status Report2022-03-30030 March 2022 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-22-0006, Reactor Head Disposition Project Overview2022-03-17017 March 2022 Reactor Head Disposition Project Overview LIC-22-0004, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report2022-02-17017 February 2022 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report LIC-21-0008, Organizational and Management Change2021-10-28028 October 2021 Organizational and Management Change LIC-21-0006, Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report2021-09-0808 September 2021 Annual 2021 Decommissioning Funding/Irradiated Fuel Management Status Report LIC-21-0007, ISFSI Only Emergency Plan Update2021-09-0808 September 2021 ISFSI Only Emergency Plan Update LIC-21-0004, Radiological Effluent Release Report and Radiological Environmental Operating Report2021-04-29029 April 2021 Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-21-0003, Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report2021-03-30030 March 2021 Independent Spent Fuel Storage Installation - 2021 Annual Decommissioning Funding / Irradiated Fuel Management Status Report LIC-21-0002, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2021-02-22022 February 2021 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0015, Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092)2020-07-29029 July 2020 Correction to Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report 2019 (ML20121A092) LIC-20-0013, Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report2020-07-16016 July 2020 Response for Fort Calhoun Station Fort Calhoun Station, Unit No. 1, Revised Post-Shutdown Decommissioning Activities Report LIC-20-0014, Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2020-07-15015 July 2020 Submittal of Revision 8 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-20-0012, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2020-05-18018 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration and Certification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool LIC-20-0011, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-05-0707 May 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0009, (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report2020-04-30030 April 2020 (FCS) Radiological Effluent Release Report and Radiological Environmental Operating Report LIC-20-0008, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-04-13013 April 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0006, (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E2020-03-26026 March 2020 (Fcs), Unit 1, Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E LIC-20-0004, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-03-10010 March 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-20-0003, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-02-27027 February 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report LIC-20-0002, Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan2020-02-27027 February 2020 Independent Spent Fuel Storage Installation - Submittal of Revision 7 to Physical Security Plan LIC-20-0001, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2020-02-0606 February 2020 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0025, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-12-19019 December 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0007, Post-Shutdown Decommissioning Activities Report2019-12-16016 December 2019 Post-Shutdown Decommissioning Activities Report LIC-19-0021, Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme2019-11-20020 November 2019 Independent Spent Fuel Storage Installation - Response to Request for Additional Information License Amendment for ISFSI-only EP and EAL Scheme LIC-19-0022, Independent Spent Fuel Storage Installation (ISFSI) Cask Registration2019-11-18018 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Cask Registration LIC-19-0018, Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP)2019-11-14014 November 2019 Submittal of Revision 6 to the Fort Calhoun Station (Fcs), Physical Security Plan (PSP) LIC-19-0020, Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis2019-10-17017 October 2019 Independent Spent Fuel Storage Installation - Updated Information Submittal and Revision 1 of the Blast Analysis LIC-19-0017, Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 20042019-08-0808 August 2019 Clarification to Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 an LIC-19-0010, License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associa2019-05-20020 May 2019 License Amendment Request (LAR) 19-03; Revised Fort Calhoun Station License in Support of the Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated 2024-06-18
[Table view] Category:Licensee Response to Notice of Violation
MONTHYEARLIC-15-0027, Reply to a Notice of Violation (EA-15-020)2015-04-23023 April 2015 Reply to a Notice of Violation (EA-15-020) IR 05000285/20130132014-05-0202 May 2014 Reply to a Notice of Violation 05000285-13-013 LIC-14-0055, Reply to a Notice of Violation 05000285-13-0132014-05-0202 May 2014 Reply to a Notice of Violation 05000285-13-013 IR 05000285/20140022014-04-18018 April 2014 Reply to Notices of Violations 05000285/2014002 LIC-14-0053, Reply to Notices of Violations 05000285/20140022014-04-18018 April 2014 Reply to Notices of Violations 05000285/2014002 IR 05000285/20130112013-04-24024 April 2013 OPPD, Reply to a Notice of Violation, NRC Inspection Report 05000285-13-011, EA-13-043 LIC-13-0028, OPPD, Reply to a Notice of Violation, NRC Inspection Report 05000285-13-011, EA-13-0432013-04-24024 April 2013 OPPD, Reply to a Notice of Violation, NRC Inspection Report 05000285-13-011, EA-13-043 LIC-12-0180, Omaha Public Power District, Reply to a Notice of Violation IR 05000285-12-005, EA-12-1742012-12-13013 December 2012 Omaha Public Power District, Reply to a Notice of Violation IR 05000285-12-005, EA-12-174 LIC-12-0181, NRC Inspection Report 05000285/2012010, Supplemental Response to the Reply to a Notice of Violation (Nov); EA-12-0232012-12-0303 December 2012 NRC Inspection Report 05000285/2012010, Supplemental Response to the Reply to a Notice of Violation (Nov); EA-12-023 LIC-12-0152, Response to Denial of Violation in NRC Inspection Report 05000285/20120022012-11-0606 November 2012 Response to Denial of Violation in NRC Inspection Report 05000285/2012002 LIC-12-0080, Response to NRC Inspection Report 05000285/2012002, EA-2012-0952012-06-11011 June 2012 Response to NRC Inspection Report 05000285/2012002, EA-2012-095 IR 05000285/20120102012-05-24024 May 2012 NRC Inspection Report 05000285/2012010, Reply to a Notice of Violation (Nov); EA-12-023 LIC-12-0051, NRC Inspection Report 05000285/2012010, Reply to a Notice of Violation (Nov); EA-12-0232012-05-24024 May 2012 NRC Inspection Report 05000285/2012010, Reply to a Notice of Violation (Nov); EA-12-023 LIC-12-0041, NRC Inspection Report 05000285/2011006, Reply to a Notice of Violation; EA-12-035 (Revision 0)2012-04-13013 April 2012 NRC Inspection Report 05000285/2011006, Reply to a Notice of Violation; EA-12-035 (Revision 0) LIC-11-0084, Omaha Public Power District - NRC Inspection Report 05000285/2011007, Reply to a Notice of Violation (Nov); EA-11-0252011-08-17017 August 2011 Omaha Public Power District - NRC Inspection Report 05000285/2011007, Reply to a Notice of Violation (Nov); EA-11-025 IR 05000285/20110072011-08-17017 August 2011 Omaha Public Power District - NRC Inspection Report 05000285/2011007, Reply to a Notice of Violation (Nov); EA-11-025 LIC-11-0011, NRC Inspection Report 05000285/2010008, Reply to a Notice of Violation (Nov); EA-10-084 (Revision 1)2011-06-0707 June 2011 NRC Inspection Report 05000285/2010008, Reply to a Notice of Violation (Nov); EA-10-084 (Revision 1) LIC-10-0098, NRC Inspection Report 05000285-10-008, Reply to a Notice of Violation; EA-10-0842010-11-0505 November 2010 NRC Inspection Report 05000285-10-008, Reply to a Notice of Violation; EA-10-084 LIC-09-0066, Ltr. NRC Inspection Report 05000285-09-003, Reply to a Notice of Violation (NOV) EA-09-1742009-09-0202 September 2009 Ltr. NRC Inspection Report 05000285-09-003, Reply to a Notice of Violation (NOV) EA-09-174 LIC-08-0009, NRC Inspection Report 05000285/2007011, Reply to Notice of Violation (NOV) EA-07-194 (Revision 1)2008-02-15015 February 2008 NRC Inspection Report 05000285/2007011, Reply to Notice of Violation (NOV) EA-07-194 (Revision 1) LIC-07-0089, NRC Inspection Report 05000285/2007007, Reply to a Notice of Deviation2007-10-0505 October 2007 NRC Inspection Report 05000285/2007007, Reply to a Notice of Deviation LIC-07-0062, NRC Inspection Report 05000285-06-018, Reply to a Notice of Violation (NOV) EA-07-0472007-06-28028 June 2007 NRC Inspection Report 05000285-06-018, Reply to a Notice of Violation (NOV) EA-07-047 IR 05000285/20070092007-06-15015 June 2007 NRC Inspection Report 05000285/07009, Reply to Notice of Violation (NOV) EA-07-056 LIC-07-0057, NRC Inspection Report 05000285/07009, Reply to Notice of Violation (NOV) EA-07-0562007-06-15015 June 2007 NRC Inspection Report 05000285/07009, Reply to Notice of Violation (NOV) EA-07-056 IR 05000285/20060152006-09-22022 September 2006 NRC Inspection Report 05000285-06-015, Reply to Notice of Violation LIC-06-0107, NRC Inspection Report 05000285-06-015, Reply to Notice of Violation2006-09-22022 September 2006 NRC Inspection Report 05000285-06-015, Reply to Notice of Violation LIC-05-0055, NRC Inspection Report 05000285-05-010, Reply to a Notice of Violation2005-05-12012 May 2005 NRC Inspection Report 05000285-05-010, Reply to a Notice of Violation LIC-04-0109, Status of Actions Regarding NRC IR 05000285-00-001 for the Fort Calhoun Station2004-10-14014 October 2004 Status of Actions Regarding NRC IR 05000285-00-001 for the Fort Calhoun Station LIC-04-0070, Reply to Notice of Violation to Inspection Report 050000285/20040022004-06-11011 June 2004 Reply to Notice of Violation to Inspection Report 050000285/2004002 LIC-03-0076, NRC Inspection Report 50-285/03-09, Reply to a Notice of Violation (NOV)2003-05-20020 May 2003 NRC Inspection Report 50-285/03-09, Reply to a Notice of Violation (NOV) ML0225408832002-08-26026 August 2002 NRC IR 05000285-02-008, Reply to Notice of Violation 2015-04-23
[Table view] |
Text
-~.:..
jjjjjjjj Omaha Public Power District 444 South 16th Street Mall Omaha, NE 68102-2247 LI C-14-0055 May 2,2014 u.s. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Fort Calhoun Station, Unit No.1 Renewed Facility Operating License No. DPR-40 NRC Docket No. 50-285 10 CFR 2.201
Reference:
- 1.
Letter from NRC (Michael Hay) to OPPD (Louis P. Cortopassi) dated April 3, 2014 (NRC-14-0028)
- 2.
Letter from OPPD (Lou Cortopassi) to NRC (Document Control Desk) dated October 8,2013 (LlC-13-0118)
SUBJECT:
Reply to a Notice of Violation 05000285/2013013 In the reference letter, the Nuclear Regulatory Commission (NRC) transmitted a Notice of Violation (NOV) to the Omaha Public Power District (OPPD) that contained a cited Severity Level IV Violation.
We have evaluated these issues to ascertain the facts and determined the appropriate corrective actions. Enclosed please find the Fort Calhoun Station Response to this issue.
This letter contains no regulatory commitments. If you should have any questions, please contact Terrence Simpkin, Manager Regulatory Assurance, at 402-533-6263.
S7a Louis P. Cortopassi Site Vice President and CNO Enclosure LPC/epm c:
M. L. Dapas, NRC Regional Administrator, Region IV J. M. Sebrosky, NRC Senior Project Manager J. C. Kirkland, NRC Senior Resident Inspector
II C-14-0055 Enclosure Page 1 REPLY TO A NOTICE OF VIOLATION Omaha Public Power District Fort Calhoun Station Docket No. 50-285 License No. DPR-40 EA-2013-201 During a U.S. Nuclear Regulatory Commission (NRC) inspection conducted from July 8 through December 16, 2013, a violation of NRC requirements was identified. In accordance with the NRC Enforcement Policy, the violation is listed below:
10 CFR 50.9(a), "Completeness and Accuracy of Information," requires in part that, "information provided to the Commission by a licensee shall be complete and accurate in all material respects."
Contrary to the above, on October 13, 2008, the licensee provided to the Commission documentation which contained information that was not complete and accurate in all material respects. Specifically, the licensee submitted a letter dated October 13, 2008, which stated that the pyrocrete enclosure remained in place to protect the cables associated with AC-10A and AC-10B from a fire in the intake structure. When in fact, the motor lead cables associated with raw water pump AC-10A were not protected by the pyrocrete enclosure. In a letter, dated February 6, 2009, the NRC granted an exemption from the specific requirements of Section III.G.1.b of 10 CFR Part 50, Appendix R, for the Fort Calhoun Station based in part, upon the NRC's review and evaluation of information provided by the licensee in its letter dated October 13, 2008. Therefore, this information was considered material to the NRC.
This is a Severity Level IV Violation (Section 6.9).
OPPD Response
- 1.
Reason for the Violation During the July 2013 National Fire Protection Association (NFPA) 805 transition/Chapter 0350 inspection conducted at FCS, an NRC Region IV inspector questioned whether the Omaha Public Power District (OPPD) may have provided inaccurate information to the NRC about protection of raw water (RW) pumps, AC-10A and AC-10B, in the intake structure circulating water pump bay in the event of a fire. Specifically, the NRC regional inspector's question was based on the discrepancy between the current configuration, which did not identify any pyrocrete barrier protection surrounding the pull box housing the AC-1 OA RW pump power cable, and information provided in previous docketed correspondence in lIC-83-0219, lIC-83-0220 and lIC-08-0109.
Timeline July 9, 1979: OPPD stated which raw water pump and associated cables would be protected. (lIC-79-0192) November 3, 1980: Modification Request (MR)-FC-78-55 installed the pyrocrete in the plant, including the intake structure.
LI C-14-0055 Enclosure Page 2 July 1, 1983: The NRC issued a violation to OPPD which stated, in part, "These conduits are routed through a common fire barrier enclosure, located above the circulating water pump bay, such that the cables inside the barrier do not meet the Section IILG fire protection requirements of separation, detection and suppression." The finding was "Failure to provide approved fire protection measures and repair procedures to ensure capability to achieve and maintain cold shutdown is an apparent violation of 10 CFR 50, Appendix R, Sections IILG and IILL." (NRC-83-0202)
August 30, 1983: OPPD requested an exemption from requirements of Sections III.G and III.L of 10 CFR 50 Appendix R. OPPD also stated that both raw water pumps AC-10A and AC-10B would be protected by pyrocrete. This was the first mention of both pumps being protected. (LlC-83-0219)
August 31, 1983: OPPD documents the responses to the violations documented in NRC-83-0202. The letter explains that OPPD is sending an exemption request to the NRC, documented in LlC-83-0219. (UC-83-0220)
July 3, 1985: Safety Evaluation Report (SER) granted an exemption for the fire area 31 for the intake structure and pull boxes, stating, in part, "requested an exemption from section III.G.2 to the extent that requires that systems associated with redundant shutdown divisions be completely separated by a continuous 1-hour fire-rated barrier and the fire area containing these systems be protected by an area-wide automatic fire suppression system." The SER identified two primary considerations in the exemption evaluation for Fire Area 31. The SER states: "The fire loading within these areas is limited. Combustible materials are widely dispersed. Consequently, any potential fire would be within the capabilities of the plant fire brigade to extinguish with manual firefighting equipment before significant levels of damage occurred." The SER also considered that "if a fire were to occur at the raw water pumps,"... two of the pumps would be shielded from the effects of the fire by the concrete wall." (NRC-85-0200)
February 4, 2008: OPPD requested an exemption from 10 CFR 50 Appendix R, Section III.G.1.b, which addressed the power and control cables for the four RW pumps that are routed from the Auxiliary Building through the outside cable pull boxes (128T and 129T) into the underground duct bank and manhole vaults MH-5 and MH-31 and into the intake structure. (LlC-08-0006)
September 17, 2008: The NRC required more information to process this exemption.
NRC transmitted via email a request for additional information (RAI), the third RAI of which asked OPPD to confirm that both RW pumps AC-1 OA and AC-1 OB were protected with pyrocrete from fire. (ML083360264)
October 13, 2008: OPPD responded stating that both RW pumps AC-10A and AC-10B are protected with pyrocrete from a fire. (LlC-08-0109)
February 6,2009: NRC granted an exemption which mentioned that both RW pumps AC-10A and AC-10B are protected with pyrocrete from a fire. (NRC-09-0007)
September 28, 2011: OPPD submits the National Fire Protection Association (NFPA) 805 License Amendment Request. Attachment T provides clarification for protected cables and raw water pumps within the Intake Structure. This clarification is part of Prior
LlC-14-0055 Enclosure Page 3 Approval Clarification Request 7 which specifies that one RW pump (AC-108) is protected for a fire at Intake Structure elevation 985' (at the CW pump elevation).
(UC-11-0099)
July 2013: During an NFPA 805 transition/Chapter 0350 inspection conducted at FCS, an NRC Region IV inspector questioned whether the OPPD may have provided inaccurate information to the NRC about protection of RW pumps, AC-10A and AC-108, in the intake structure in the event of a fire. Specifically, the NRC regional inspector's question was based on the discrepancy between the current field configuration, which did not identify any pyrocrete barrier protection surrounding the pull box housing the AC-10A RW pump power cable, and information provided in previous docketed correspondence in LlC-83-0219, LlC-83-0220 and LlC-08-0109.
The cause analysis determined that FCS personnel did not use human performance tools (validate assumptions and technical rigor) to ensure correct information was supplied to the NRC.
- 2.
Corrective Steps Taken and the Results Achieved October 8,2013: OPPD submitted letter LlC-13-0118, "Clarification of Information Regarding Protection of the Raw Water Pumps in the Event of a Fire in the Intake Structure at Fort Calhoun Station," to ensure the NRC has the correct information. This letter provided clarification to information previously provided to the NRC (reference 2).
Validation and Verification process was set up in April 2011 by Regulatory Assurance for NRC correspondence. Note: this process was not in place at the time of the 2008 correspondence.
- 3.
Corrective Steps That Will be Taken No additional actions are required.
- 4.
Date When Full Compliance Will be Achieved The Fort Calhoun Station is currently in full compliance.