ML20064H896

From kanterella
Revision as of 17:08, 31 March 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
LER#78-091/03L-0 on 781120:Senior Control Operator Did Not Have Completed Hatch Leak Rate Test Before Beginning Reactor Startup Due to Misunderstanding.Test completed.GP-1 Revised to Require Leak Test Verification by Control Operators
ML20064H896
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/19/1978
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20064H894 List:
References
LER-78-091-03L, LER-78-91-3L, NUDOCS 7812270292
Download: ML20064H896 (2)


Text