MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections IR 05000263/20244012024-05-30030 May 2024 Public - Monticello Nuclear Generating Plant - Cyber Security Inspection Report 05000263/2024401 ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 2024-09-27
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240506, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-15015 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240505, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-0707 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application ML24116A2392024-04-25025 April 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Prairie Island Nuclear Plant for Performance for 2023 Calendar Year ML24115A3102024-04-24024 April 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Plant for Performance for 2023 Calendar Year PMNS20240269, Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy2024-02-26026 February 2024 Notice of Meeting with Northern States Power Company - Minnesota, Doing Business as Xcel Energy PMNS20240066, Cultural Resource Surveys2024-01-19019 January 2024 Cultural Resource Surveys ML24008A0132024-01-0808 January 2024 Notice of Public Meeting with Xcel Energy to Discuss the Prairie Island ISFSI Amendment PMNS20231228, Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-11-0101 November 2023 Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20231085, SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation2023-10-0202 October 2023 SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation PMNS20231010, Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy2023-09-0808 September 2023 Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy PMNS20230790, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-29029 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23159A2542023-06-0808 June 2023 Pre-application Meeting with Xcel Energy to Discuss the Amendment Application for the Prairie Island ISFSI PMNS20230663, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-0202 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23118A1182023-04-28028 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Prairie Island Nuclear Plant for Performance for 2022 Calendar Year ML23111A2762023-04-25025 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Plant for Performance for 2022 Calendar Year PMNS20230262, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-04-12012 April 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230188, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-02-24024 February 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220900, Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-09-12012 September 2022 Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220695, Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant2022-07-26026 July 2022 Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant PMNS20220699, Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel2022-07-0808 July 2022 Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel ML22109A0802022-04-20020 April 2022 Information Meeting with a Question-And-Answer Session to Discuss NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant ML22109A0672022-04-20020 April 2022 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant for 2021 Calendar Year PMNS20220141, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety PMNS20220131, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220096, Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island)2022-02-0707 February 2022 Pre-Application Meeting with Xcel Energy to Discuss Pressure-Temperature Limit Report Amendment for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) PMNS20220019, Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello)2022-01-13013 January 2022 Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello) PMNS20211339, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System2021-10-15015 October 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, License Amendment Request Related to the Cooling Water System PMNS20211229, Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant2021-09-22022 September 2021 Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant PMNS20210949, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-07-21021 July 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request ML21146A1902021-05-25025 May 2021 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML21145A3462021-05-25025 May 2021 6/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year PMNS20210528, Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request2021-05-0505 May 2021 Meeting with Northern States Power Company Regarding Prairie Island Nuclear Generating Plant, Units 1 and 2, Proposed License Amendment Request PMNS20210203, Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant2021-03-0404 March 2021 Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20280A6092020-10-0606 October 2020 Teleconference to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, (Prairie Island) License Amendment Request to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML20183A2872020-07-0101 July 2020 7/16/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant Performance for the 2019 Calendar Year ML19144A2402019-05-23023 May 2019 6/19/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2018 Calendar Year ML19144A2232019-05-23023 May 2019 6/25/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Prairie Island Nuclear Generating Plant Performance for the 2018 Calendar Year ML19074A1312019-03-11011 March 2019 Revised Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19070A2412019-03-11011 March 2019 Notice of Meeting with Xcel Energy to Discuss a Seismic Considerations for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island ISFSI ML19045A6682019-02-14014 February 2019 Notice of Meeting with Xcel Energy to Discuss a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at the Prairie Island Independent Spent Fuel Storage Installation ML18122A0452018-05-0101 May 2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Prairie Island Nuclear Generating Plant, Units 1 and 2 Performance for the 2017 Calendar Year ML18122A0992018-05-0101 May 2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2017 Calendar Year ML17258A0772017-09-14014 September 2017 17 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Monticello Nuclear Generating Plant (CMS) ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML16162A7112016-06-10010 June 2016 Summary of the May 18, 2016, Prairie Island Public Open House ML16119A3892016-04-27027 April 2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2015 Calendar Year ML16119A0412016-04-26026 April 2016 5/18/2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment for Prairie Island Nuclear Generating Plant Performance for the 2015 Calendar Year 2024-05-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 December 2, 2008 Mr. Dennis Koehl Chief Nuclear Officer Northern States Power Company, Minnesota 414 Nicollet Mall (MP4)
Minneapolis, MN 55401
SUBJECT:
DECEMBER 17, 2008 PUBLIC MEETING AT THE MONTICELLO COMMUNITY CENTER
Dear Mr. Koehl:
This letter confirms the discussion between members of our staffs to meet and discuss plant performance at the Prairie Island and Monticello Nuclear Generating Plants. The meeting will begin at 3:00 p.m. CST on Wednesday, December 17, 2008, in the Mississippi Conference Room at the Monticello Community Center. This meeting is open to the public.
If you have any questions regarding this meeting, please contact Kenneth Riemer at (630) 829-9628.
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-263 (Monticello); 50-282; 50-306 (Prairie Island)
License Nos. DPR-22 (Monticello); DPR-42; DPR-60 (Prairie Island)
DISTRIBUTION:
See next page
Letter to D. Koehl from K. Riemer dated December 2, 2008
SUBJECT:
DECEMBER 17, 2008 PUBLIC MEETING AT THE MONTICELLO COMMUNITY CENTER Monticello Nuclear Generating Plant cc: T. OConnor, Site Vice President Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.
J. Stine, State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division, Minnesota Attorney Generals Office Chairman, Wright County Board Mayor of Monticello Chairperson, Sherburne County Administrator, City of Monticello G. Mortensen, INPO Prairie Island Nuclear Generating Plant cc: M. Wadley, Site Vice President Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota Emergency Preparedness Coordinator Dakota County Law Enforcement Center Council Administrator President, Prairie Island Tribal Council Goodhue County Sheriff Director, Pierce County Emergency Management Agency Chair, Pierce County Board of Commissioners Chair, Dakota County Board of Commissioners Mayor of Red Wing Director, Goodhue County Emergency Management Agency Chair, Goodhue County Board of Commissioners Pierce County Sheriff Dakota County Sheriff
December 2, 2008 Mr. Dennis Koehl Chief Nuclear Officer Northern States Power Company, Minnesota 414 Nicollet Mall (MP4)
Minneapolis, MN 55401
SUBJECT:
DECEMBER 17, 2008 PUBLIC MEETING AT THE MONTICELLO COMMUNITY CENTER
Dear Mr. Koehl:
This letter confirms the discussion between members of our staffs to meet and discuss plant performance at the Prairie Island and Monticello Nuclear Generating Plants. The meeting will begin at 3:00 p.m. CST on Wednesday, December 17, 2008, in the Mississippi Conference Room at the Monticello Community Center. This meeting is open to the public.
If you have any questions regarding this meeting, please contact Kenneth Riemer at (630) 829-9628.
Sincerely,
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket Nos. 50-263 (Monticello); 50-282; 50-306 (Prairie Island)
License Nos. DPR-22 (Monticello); DPR-42; DPR-60 (Prairie Island)
DISTRIBUTION:
See next page DOCUMENT NAME: G:\MONT\PUBLIC MEETINGS\LTR TO NORTHERN STATES RE 121708 MTG.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" =
Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME NShah:cms KRiemer JGiessner DATE 12/2/08 12/2/08 12/2/08 OFFICIAL RECORD COPY
Letter to D. Koehl from K. Riemer dated December 2, 2008
SUBJECT:
DECEMBER 17, 2008 PUBLIC MEETING AT THE MONTICELLO COMMUNITY CENTER DISTRIBUTION; Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMMonticello RidsNRRPMPrairieIsland Resource RidsNrrDirsIpab Resource James Caldwell Mark Satorius Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov